Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 202 1ST FLOOR VIVEKANAND PURI MALKAGANJ SARAI ROHILLA NORTH DELHI DELHI 110007 UDYAM DL 01 0065084 | NORTH DELHI | DELHI | 110007 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3,200
Closing Date
28 Dec 2019, 2:00 pmClosed
EXECUTIVE ENGINEER (SDW) II
S.T.P. OKHLA MATHURA ROAD NEW DELHI-110025
Repairing/ of leakage of 750 mm dia sludge line of the aeration chamber of 45 MGD STP Okhla.
2019_DJB_186182_11
NIT No-21 EE (SDW) II/ (19-20)
Open Tender
Electrical Works
Works
45 days
S.T.P. OKHLA MATHURA ROAD NEW DELHI-110025
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c 50448339804
₹3,200
3 Jan 2020
21 Dec 2019
28 Dec 2019
21 Dec 2019
28 Dec 2019
21 Dec 2019
A) Repairing of 750mm dia. Aeration sludge line and other allied works at 45 MGD STP Okhla with following works : - Making if temporary plat form on the both side of 750mm dia. Sludge line in approx 20 feet deep aeration chamber using 50 mm dia. M.S.pipe with jacks & heavy duty clamps & N/W/B having top of M.S chequered sheet of 10 mm thick of 10 feet long and 6 feet wide. The said plat from should be more where filter can repair the heavy leakage along with leakage repairing material.
Drilling the RCC supports of half round of line near joints of gap pieces 1 job with heavy electric tools and other allied tackles at leakage points.
Cleaning of joints of 750 mm dia. Line by the removing old use less lead, cotton rope with all safety items etc.
Repairing of leakage by using of lead ( 25 kg) cotton ropes and other leakage attended material through very experienced fitter having all safety measure such as safety belts masks, gumboots, safety tube and helmet etc as said work shall be carried in 20 feet deep aeration chamber in presence of health hazard gases.
Cutting of un wanted trees & shrubs etc at various spots near joints of 750 mm dia. Sludge line in aeration chamber tacking all safety measure giving is s.no.4 as the work shall be done on very dangerous points.
Testing of said sludge line after repairing of leakage by running of 2 Nos. pump sets from return sludge pump house.
Dismantling of plate form tacking all safety measure to avoid any mishap pining.
Transportation charges To & Fro.
MITTAL TRADING COMPANY
Bansal Engineers and Traders
N.R. Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .