| 1 | 1₹3.2 LAccepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | 1 | Accepted-Finance Rates are Reasonable | |
| 2 | 2₹3.7 L+₹55,020 (17.4%)Accepted-Finance NOT AVAILABLE | 2 | Accepted-Finance Rates are Reasonable | |
| 3 | 3₹3.9 L+₹73,780 (23.4%)Accepted-Finance BHAGWATI NAGAR JAMMU | 3 | Accepted-Finance Rates are Reasonable |
Tender Value
Refer Docs
Closing Date
27 Oct 2021, 6:00 pmClosed
PHE Jal Shakti Mechanical. Division Rajouri.
PHE Jal Shakti Mechanical. Division Rajouri.
Repairing of different capacities of Transformer and voltage stabilizer installed at various pumping station of Rajouri Sub Division
2021_PHE_144195_1
e-NIT PHE/MDR/73 of 2021-22 DATED 16-10-2021
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
15 days
Rajouri
as per Nit
3 documents required · 3 mandatory
₹250
PHE Jal Shakti Mechanical. Division Rajouri.
Yes
PHE Jal Shakti Mechanical. Division Rajouri.
1 Nov 2021
18 Oct 2021
28 Oct 2021
18 Oct 2021
27 Oct 2021
18 Oct 2021
25 Oct 2021
Laying and Jointing PVC Pipe. Heading
Repairing of 100KVA transformer installed at pumping station Palma Danna Stage 1st by way of dismantling of transformer extracting of all the damaged coils , cleaning and flushing of the oil tank by using chemical to all the carbon deposit. P/F of 6 nos HV coils. P/F of 02 no LV coils. Providing fitting of 3 nos LV bushes 2 no HV bushes with metal parts, P/F gasket, nut /bolts, tapes and sundry items. Heat treatment of transformer oil and Providing/Filling 90ltr of transformer oil. Assembling of transformer and testing on full load. Complete job includes cost of material, labour charges and carriage/shifting charges of transformer from station to workshop and then back to site.
Repairing of 100KVA transformer installed at pumping station Dhanore dhindian by way of dismantling of transformer extracting of all the damaged coils , cleaning and flushing of the oil tank by using chemical to all the carbon deposit. P/F of 08 nos HV coils. P/F of 02 no LV coils. Providing fitting of 3 nos LV bushes 2 no HV bushes with metal parts, P/F gasket, nut /bolts, tapes and sundry items. Heat treatment of transformer oil and P/Filling 40ltr of transformer oil. Assembling of transformer and testing on full load. Complete job includes cost of material, labour charges and carriage/shifting charges of transformer from station to workshop and then back to site.
Repairing of 63 KVA volt. Stabilizer installed at Pumping Station Begonda B/Well, job includes disconnecting of incoming and outgoing power cables. Dismantling of the stabilizer by lifting of transformer assembly from the oil tank with the help of chain pulley block and manual labour. Complete rewinding of 02 No. main coil by using superior quality of material and as per its original design, replacement of 2 Nos. rotary switches, connecting the taps of the coil to their respective rotary switches, checking and repairing of its internal control wiring, Assembling the voltage stabilizer after filling of fresh transformer oil 30 ltrs to top up the level. Making of power connections after proper thimbling. Complete job includes cost of material, labour charges and carriage/shifting charges of stabilizer from station to workshop and then back to site and testing the voltage stabilizer.
Repairing of 63KVA transformer installed at pumping station Kheora B/Well by way of dismantling of transformer extracting of all the damaged coils , cleaning and flushing of the oil tank by using chemical to all the carbon deposit. P/F of 6 nos. HV coils. P/F of 02 no LV coils. Providing fitting of 3 nos LV bushes 2 no HV bushes with metal parts, P/F gasket, nut /bolts, tapes and sundry items. Heat treatment of transformer oil and P/Filling 60ltr of transformer oil. Assembling of transformer and testing on full load. Complete job includes cost of material, labour charges and carriage/shifting charges of transformer from station to workshop and then back to site.
Repairing of 63KVA transformer installed at pumping station Leeran Stage 1st by way of dismantling of transformer extracting of all the damaged coils , cleaning and flushing of the oil tank by using chemical to all the carbon deposit. P/F of 04 nos HV coils. P/F of 02 nos LV coils. Providing fitting of 2 nos LV bushes 3 no HV bushes with metal parts, P/F gasket, nut /bolts, tapes and sundry items. Heat treatment of transformer oil and P/Filling 50ltr of transformer oil. Assembling of transformer and testing on full load. Complete job includes cost of material, labour charges and carriage/shifting charges of transformer from station to workshop and then back to site.
Repairing of 63 KVA 3 phase manually operated volt. Stabilizer of pumping station Gurdhan bala Stage 2nd. The job includes disconnecting of incoming and outgoing power cables. Dismantling of the stabilizer by lifting of transformer assembly from the oil tank with the help of chain pulley block and manual labour. Complete rewinding of 2 No. main coil by using superior quality of material, replacement of 2 Nos. rotary switch complete in all respects. Repairing and servicing of other regulators, assembling the voltage stabilizer. Providing and filling 30 ltrs of fresh T oil to top up the level. Making of power connections with proper thimbling. Complete job includes cost of material, labour charges and carriage/shifting charges from station to workshop and then back to site and testing the voltage stabilizer.
Repairing of 63KVA transformer installed at pumping station Tanuni Stage 1st by way of dismantling of transformer extracting of all the damaged coils , cleaning and flushing of the oil tank by using chemical to all the carbon deposit. P/F of 04 nos HV coils. P/F of 02 no LV coils. Providing fitting of 3 nos LV bushes 2 no HV bushes with metal parts, P/F gasket, nut /bolts, tapes and sundry items. Heat treatment of transformer oil and P/Filling 40ltr of transformer oil. Assembling of transformer and testing on full load. Complete job includes cost of material, labour charges and carriage/shifting charges of transformer from station to workshop and then back to site.
Repairing of 100KVA transformer installed at pumping station MithiDhara by way of dismantling of transformer extracting of all the damaged coils , cleaning and flushing of the oil tank by using chemical to all the carbon deposit. P/F of 06 nos HV coils. P/F of 03 nos LV coils. Providing fitting of 2 nos LV bushes 3 no HV bushes with metal parts, P/F gasket, nut /bolts, tapes and sundry items. Heat treatment of transformer oil and P/Filling 40ltr of transformer oil. Assembling of transformer and testing on full load. Complete job includes cost of material, labour charges and carriage/shifting charges of transformer from station to workshop and then back to site.
Repairing of 63 KVA 3 phase manually operated volt. Stabilizer of P/stn.Rethal . The job includes disconnecting of incoming and outgoing power cables. Dismantling of the stabilizer by lifting of transformer assembly from the oil tank with the help of chain pulley block and manual labour. Complete rewinding of 2 No. main coil by using superior quality of material, replacement of 2 Nos. rotary switch complete in all respects. Repairing and servicing of other regulators, assembling the voltage stabilizer. Providing and filling 30 ltrs of fresh T oil to top up the level. Making of power connections with proper thimbling. Complete job includes cost of material, labour charges and carriage/shifting charges from station to workshop and then back to site and testing the voltage stabilizer.
G S ENGINEERING WORKS
BEE AAR ENTERPRISES
G S ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .