Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical accept |
| 2 | Accepted-Technical | Accepted-Technical accept |
| 3 | Accepted-Technical | Accepted-Technical accept |
Tender Value
₹11.8 L
EMD Value
₹23,700
Closing Date
1 Jul 2026, 5:00 pmClosed
executive director(NIRMAN)
U.P.COOPERATIVE FEDERATION LTD,32 STATION ROAD, LUCKNOW-226001
Repairing of 600M.T. Capacity P.C.F. Godown at Inderpur Distt. Ballia.
2026_UPPCF_1161308_2
885_UPPCF_2026_15062026
Open Tender
Civil Works
Percentage
90 days
INDERPUR BALLIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
U.P.COOPERATIVE FEDERATION LTD
₹23,700
8 Jul 2026
17 Jun 2026
2 Jul 2026
17 Jun 2026
1 Jul 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairing of 600M.T. CapacityP.C.F. Godown at Inderpur Distt. Ballia. | |||||
| 1.01 | Supply & Fixing 6 mm thick gray corrugated A.C. Sheet roofing in position including supply of all materials, labour & T and P etc. required for proper completion of the work. | 174 | SQM | 402.26 | ₹69,993.24 |
| 1.02 | Repairing of rolling shutters including repair of side guides and arrangement of inside and out side with pull & push operation and oiling and greasing including supply of all materials, labour & T.P. etc. required for proper completion of the work. | 4 | No | 1,000 | ₹4,000 |
| 1.03 | Excavation in foundation of ordinary soil (Loam clay or sand) including lift up to 1.5 M. and lead up to 30M. and including filling watering and ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30 M from the foundation trenches. | 14.25 | CUM | 133.11 | ₹1,896.82 |
| 1.04 | Concrete with 4Cm. Gauge over burnt brick ballast with fine sand and cement in proportion of 8:4:1 in foundation including supply of all materials, labour, T&P etc. required for proper completion of work. | 1.78 | CUM | 5,108.49 | ₹9,093.11 |
| 1.05 | R.C.C work with cement, approved coarse sand and 2 cm. gauge approved stone ballast in the proportion 1:2:4 in foundation and footings excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. binding wire and including necessary centering and shuttering etc. and including supply of all materials, labour, T&P etc. required for proper completion of work. (Binding wire to be supplied by contractor free of cost.) | 15.59 | CUM | 6,436.9 | ₹1,00,351.27 |
| 1.06 | R.C.C work with cement approved coarse and 2 cm. gauge approved stone ballast in the proportion 1:1.5:3 inexcluding supply of reinforcement and its bending including supply of all materials and T&P etc. required for proper completion of work up to all lead and lift, binding wire to be supplied by the contractor free of cost including necessary centering and shuttering. | 15.28 | CUM | 8,138.9 | ₹1,24,362.39 |
| 1.07 | First class brick work in 1:4 cement and coarse sand of 2.20 fineness modulus mortar in foundation and plinth including supply of all materials, labour, T&P etc. required for proper completion of work. | 30.01 | CUM | 7,007.56 | ₹2,10,296.88 |
| 1.08 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in overall rate) wrought to required shape as necessary including bending for proper completion of work including supply of steel and its wastage bend. Hook & authorised overlapping shall be measured upto floor two level. | 30.29 | QTL | 8,087.94 | ₹2,44,983.7 |
| 1.09 | 12 mm. thick plaster in 1:4 cement and coarse sand etc. including supply of all materials, labour, T&P etc. required for proper completion of work. | 522 | SQM | 267.99 | ₹1,39,890.78 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TECHNICAL.pdf
Tender Documents • 1.23 MB
BOQ_2176786.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .