| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance | ₹3.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.8 L+₹5,041.50 (1.34%)Admitted-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹3.8 L+₹5,041.50 (1.34%) | L2 | Admitted-Finance |
| 3 | L3₹3.9 L+₹10,829.60 (2.88%)Admitted-Finance | ₹3.9 L+₹10,829.60 (2.88%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Mukhtyar Mohammad L1 | Naveen Kumar L2 | Sarwan Kumar L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches in earth work,lifts up to 1.50 meters atacking the excavated soil not more than 3 meters clear from the edge of the excavation and then returning the stacking soil in 15cm .layers, when required in to plinths sides of foundations etc, consolidating each deposted layer by ramming and watering and then deposing of all surplus excavated earth as directed with in a lead of 20 metres in all respect with in all leads and lifts as per the direction of Engineer-in-Charge. | 54.72 | Cum | 550 ₹30,096 Lowest | 560 ₹30,643.2 | 570 ₹31,190.4 |
| 2.00 | Providing and laying cement concrete 1:4:8(1cement :4 sand : 8 graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work including all leads and lifts: a) Foundation and Plinth complete in all respect with in all leads and lifts as per the direction of Engineer in charge. | 3.71 | Cum | 7,800 ₹28,938 | 7,900 ₹29,309 | 7,600 ₹28,196 Lowest |
| 3.00Providing & laying cement concrete 1:1.5:3 (1 cement 1.5 sand 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement of RCC work in foundation with in all leads lifts as per direction and to the entire satisfaction of the Engineer-in-Charge. | ||||||
| 3.01 | Foundation footings bases of column and the like and mass concrete as per direction and to the entire satisfaction of the Engineer-in-Charge. | 2.8 | Cum | 10,500 ₹29,400 Lowest | 10,800 ₹30,240 | 12,500 ₹35,000 |
| 3.02 | Walls ( any thickness but not less than 0.1 mtr. Thickness) attached pilasters, buttresses, plinth and string courses etc. from top pf foundation level up to floor two level in all leads and lifts. | 5.33 | Cum | 12,500 ₹66,625 Lowest | 12,900 ₹68,757 | 13,900 ₹74,087 |
| 3.03 | Suspended floors, roofs, landings, shelves and their supports balconies, beams girders bressumers and cantilevers upto floor two levels | 1.61 | Cum | 12,500 ₹20,137.5 Lowest | 12,900 ₹20,781.9 | 13,900 ₹22,392.9 |
| 4.00 | Providing mild tor steel reinforcement for RCC work including bending, binding and placing in position i/c binding wire complete up to floor two level complete in all respect as per direction & to the entire satisfaction of engineer in charge upto all lead & lifts. | 957.9 | Kg | 110 ₹1,05,369 | 111 ₹1,06,326.9 | 106 ₹1,01,537.4 Lowest |
| 5.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work in:- | ||||||
| 5.01 | Flat surface such as soffits and suspended floors, roofs, landings and the like: Floors etc. up to 200mm in thickness within all leads and lifts | 14.19 | Sqm | 810 ₹11,493.9 Lowest | 810 ₹11,493.9 Lowest | 910 ₹12,912.9 |
| 5.02 | Vertical surfaces such as Walls ( any thickness but attached pilasters, buttresses, plinth and string courses etc. and the like complete in all leads and lifts. | 71.02 | Sqm | 550 ₹39,061 | 550 ₹39,061 | 505 ₹35,865.1 Lowest |
Tender Value
₹3.7 L
EMD Value
₹7,361
Closing Date
22 Apr 2026, 5:00 pmClosed
EE CTR
EE JSD CTR
WSS Ner Gharwasara in GP NerGharwasarain Tehsil Joginder Nagar DisttMandi HP SH CO RCC Storage tank 30000 ltr capacity at village Kufru
2026_HPIPH_134198_1
EE-CTR-TA-391-441 dated 09.04.2026-6
Open Tender
Civil Works - Water Works
Item Rate
90 days
JOGINDER NAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
EE CTR
₹7,361
19 Jun 2026
13 Apr 2026
23 Apr 2026
13 Apr 2026
22 Apr 2026
13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in foundation and trenches in earth work,lifts up to 1.50 meters atacking the excavated soil not more than 3 meters clear from the edge of the excavation and then returning the stacking soil in 15cm .layers, when required in to plinths sides of foundations etc, consolidating each deposted layer by ramming and watering and then deposing of all surplus excavated earth as directed with in a lead of 20 metres in all respect with in all leads and lifts as per the direction of Engineer-in-Charge. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:4:8(1cement :4 sand : 8 graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work including all leads and lifts: a) Foundation and Plinth complete in all respect with in all leads and lifts as per the direction of Engineer in charge. | - | Cum | - | - |
| - | Providing & laying cement concrete 1:1.5:3 (1 cement 1.5 sand 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of from work and reinforcement of RCC work in foundation with in all leads lifts as per direction and to the entire satisfaction of the Engineer-in-Charge. | - | - | - | - |
| - | Foundation footings bases of column and the like and mass concrete as per direction and to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| - | Walls ( any thickness but not less than 0.1 mtr. Thickness) attached pilasters, buttresses, plinth and string courses etc. from top pf foundation level up to floor two level in all leads and lifts. | - | Cum | - | - |
| - | Suspended floors, roofs, landings, shelves and their supports balconies, beams girders bressumers and cantilevers upto floor two levels | - | Cum | - | - |
| - | Providing mild tor steel reinforcement for RCC work including bending, binding and placing in position i/c binding wire complete up to floor two level complete in all respect as per direction & to the entire satisfaction of engineer in charge upto all lead & lifts. | - | Kg | - | - |
| - | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work in:- | - | - | - | - |
| - | Flat surface such as soffits and suspended floors, roofs, landings and the like: Floors etc. up to 200mm in thickness within all leads and lifts | - | Sqm | - | - |
| - | Vertical surfaces such as Walls ( any thickness but attached pilasters, buttresses, plinth and string courses etc. and the like complete in all leads and lifts. | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
03Form8.pdf
Tender Documents • 1.53 MB
Condition.pdf
Tender Documents • 0.45 MB
BOQ_198454.xls
BOQ • 0.30 MB
02Form6.pdf
Tender Documents • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .