Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance ANANDIPURAM KUSUMKHERA HALDWANI | NAINITAL | UTTARAKHAND | 244713 | Admitted-Finance |
| 2 | Admitted-Finance HALDWANI NAINITAL | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 0 8 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
5 Apr 2021, 5:00 pmClosed
Superintending Engineer
irrigation work circle haldwani
CANAL Covering 8.2Km Long Kathgariya Minor From Panchakki to Kamalwaganja at Kaladhungi Vidhansabha HALDWANI Distt Nainital Reach 1.03 Km to 1.460 Km
2021_IRDCE_31135_1
07/SE/2020-21
Open Tender
Civil Works
365 days
haldwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
Yes
executive engineer irrigation division haldwani
₹2.2 L
Yes
19 Apr 2021
10 Mar 2021
6 Apr 2021
10 Mar 2021
5 Apr 2021
12 Mar 2021
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Slip clearance (by manual means) of loose earth and other small loose materials including disposal as directed by the Engineer-in-charge.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Mechanical MeansDismentliing Reinforced Cement Concrete pavnent (v.r.b.) crossing
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Mechanical MeansDismentling old Brick masonary in cement mortar
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Mechanical Means Dismentling old stone masonary in cement mortar
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In 1:3 cement mortar
Random rubble masonry In cement mortar (1:5)
Pointing on stone work with cement mortar 1:3 (1 cement :3 fine sand) Flush/ Ruled pointing
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification . Thermo-Mechanically Treated Bars
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete:
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification
Dewatering from foundation of abutments and wing walls including wages of operator and fuel including supply of all material, labour and T&P etc. required for proper completion of the work.
Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work
Shifting of surplus earth/ dismentled material & maluwa from site lead up to 2.00 km after first 50 mtr lead complete
Sanjay Pandey
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid