Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹20.1 LAccepted-AOC 261 1508 TRISHULLA NILAKANTHA NAGAR KUNHEIPARA CUTTACK DIST GHAZIPUR PIN 754005 | CUTTACK | CUTTACK | ODISHA | 754005 | ₹20.1 L Quoted ₹17.1 L | L-1 | Accepted-AOC Being L1 |
| 2 | L-2₹19.8 L+₹2.8 L (16.2%)Rejected-Finance DHARAMASALA GALI WARD NO 08 CHAKRADHARPUR WEST SIMGHBHUM JHARKHAND PIN 833102 | SARAIKELA KHARSAWAN | JHARKHAND | 833102 | ₹19.8 L+₹2.8 L (16.2%) | L-2 | Rejected-Finance Not being L1 |
| 3 | L-3₹20.7 L+₹3.6 L (21.3%)Rejected-Finance AT BALINGA BANKIBAHAL BANKIBAHAL BASUNDHARA AREA DIST SUNDERGARH PIN 770076 | SUNDARGARH | ODISHA | 770076 | ₹20.7 L+₹3.6 L (21.3%) | L-3 | Rejected-Finance Not being L1 |
| 4 | L-4₹22.5 L+₹5.5 L (32.0%)Rejected-Finance AT PO G TUMULIA DIST SUNDERGARH ORISSA PIN 770024 | G TUMULIA | SUNDERGARH | ORISSA | 770024 | ₹22.5 L+₹5.5 L (32.0%) | L-4 | Rejected-Finance Not being L1 |
Tender Value
₹33.0 L
EMD Value
₹41,200
Closing Date
2 Apr 2026, 5:00 pmClosed
PROJECT ENGINEER(CIVIL) KOCP
PROJECT OFFICE, KULDA OCP, BASUNDHARA AREA, AT/PO-BASUNDHARA, DIST-SUNDARGARH (ODISHA) PIN-770076, PHONE NO 06621-286150
Providing and Fixing barbed wire fencing of 2.3Km along the mine boundary towards tumulia public road under Kulda OCP, Basundhara Area
2026_MCL_357023_1
MCL/PO/KOCP/Civil/ E-Tender/25-26/34 dtd.18.03.2026
Open Tender
Civil Works - Others
Percentage
60 days
KULDA OCP, BA
Please refer Tender documents.
3 documents required · 3 mandatory
₹41,200
6 Jul 2026
23 Mar 2026
3 Apr 2026
23 Mar 2026
2 Apr 2026
23 Mar 2026
23 Mar 2026 - 26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | cum | 217 | - |
| - | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 6,048.05 | - |
| - | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | 8,078.2 | - |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | KG | 101.4 | - |
| - | Finishing walls with water proofing cement paint of required shade: New work (Two or more coats applied @ 3.84 kg/10 sqm) | - | Sqm. | 84.65 | - |
| - | Lead of 2 k.m Cement, stoneblocks, G.I.. .I.,A.C., & C.C. pipesbelow 100 mmdia and other heavy materials | - | Tonne | 102.45 | - |
| - | Fencing with R.C.C. post placed at required distance, embedded incement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one sideonly, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I. staples on wooden plugs or G.I. binding wiretied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire. | - | Meter | 12.7 | - |
| - | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.34 MB
Tendernotice_2.pdf
PDF • 0.91 MB
Tendernotice_3.pdf
PDF • 1.31 MB
BOQ_369883.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .