| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.6 LAccepted-AOC | L1 | Accepted-AOC Agreement executed and work awarded | |
| 2 | L2₹66.1 L+₹2.5 L (3.90%)Rejected-AOC 3 178 KERALA INDIA | PALAKKAD | KERALA | 678001 | L2 | Rejected-AOC Agreement executed and work awarded | |
| 3 | L3₹67.2 L+₹3.6 L (5.65%)Rejected-Finance KADUMKEERIYIL SHOPPING COMPLEX THAMARASSERY KOZHIKODE 673573 | KOZHIKODE | KOZHIKODE | KERALA | 673573 | L3 | Rejected-Finance Lowest bid accept | |
| 4 | L4₹72.2 L+₹8.6 L (13.5%)Rejected-Finance | L4 | Rejected-Finance Lowest bid accept | |
| 5 | L5₹73.4 L+₹9.8 L (15.5%)Rejected-Finance | L5 | Rejected-Finance Lowest bid accept |
| Sl No | Description | Qty | Unit | Bethlahem Constructions L3 | SATHYAN T L5 | Rasheed L2 | RAJAN P L4 | Santhosh Kumar K.V. L1 | ABDUL HAMEED AC L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Appendix-I | |||||||||
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 43.83 | cum | 1,851.55 ₹81,153.44 | 1,980 ₹86,783.4 | 1,820.97 ₹79,813.12 | 1,000 ₹43,830 Lowest | 1,650 ₹72,319.5 | 2,123 ₹93,051.09 |
| 1.00 | OD156081/2025-2026:Demolishing Laterate masonary manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 18.47 | cum | 1,551.34 ₹28,650.15 | 1,660 ₹30,656.88 | 155.98 ₹2,880.64 Lowest | 1,000 ₹18,468 | 1,350 ₹24,931.8 | 1,779 ₹32,854.57 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 147.24 | cum | 262.01 ₹38,578.35 | 300 ₹44,172 | 257.69 ₹37,942.28 Lowest | 300 ₹44,172 | 290 ₹42,699.6 | 300 ₹44,172 |
| 1.00 | OD158993/2025-2026:Dry rubble masonry, without concrete levelling course, with departmental rubble rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc up to plinth level complete as per direction of departmental officers at site | 35.06 | cum | 1,600.14 ₹56,107.31 | 1,700 ₹59,608.8 | 1,949.75 ₹68,366.03 | 1,800 ₹63,115.2 | 1,500 ₹52,596 Lowest | 1,835 ₹64,342.44 |
| 1.00 | OD80295/2024-2025:Dry rubble masonry, without concrete levelling course, with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc up to plinth level complete as per direction of departmental officers at site | 220.72 | cum | 3,217.82 ₹7,10,224.36 | 3,500 ₹7,72,506 | 3,178.09 ₹7,01,455.31 | 3,500 ₹7,72,506 | 3,000 ₹6,62,148 Lowest | 3,691 ₹8,14,662.76 |
| 1.01 | 7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) | 275.5 | cum | 7,559.01 ₹20,82,507.26 | 8,300 ₹22,86,650 | 7,434.15 ₹20,48,108.33 | 8,000 ₹22,04,000 | 6,900 ₹19,00,950 Lowest | 8,674 ₹23,89,687 |
| 1.01 | OD162364/2025-2026:Laterate masonry with departmental neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 11.08 | cum | 3,319.29 ₹36,781.05 | 3,800 ₹42,107.8 | 2,729.65 ₹30,247.25 Lowest | 3,600 ₹39,891.6 | 3,000 ₹33,243 | 3,808 ₹42,196.45 |
| 1.01 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 113.75 | cum | 6,581.71 ₹7,48,656.35 | 7,300 ₹8,30,360.4 | 6,472.99 ₹7,36,289.67 | 7,500 ₹8,53,110 | 6,350 ₹7,22,299.8 Lowest | 7,552 ₹8,59,024.9 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 12.42 | cum | 5,778.2 ₹71,765.24 | 6,400 ₹79,488 | 5,682.75 ₹70,579.76 | 7,000 ₹86,940 | 5,400 ₹67,068 Lowest | 6,630 ₹82,344.6 |
Tender Value
₹84.7 L
EMD Value
₹50,000
Closing Date
16 Oct 2025, 3:15 pmClosed
Executive Engineer
Office of the Executive Engineer PWD Buildings Division Kozhikode
Construction work
2025_PWD_808221_1
36/EEBK/2025-26
Open Tender
Civil Works - Buildings
Item Rate
240 days
Vellimadukunnu
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
6 Nov 2025
10 Oct 2025
18 Oct 2025
10 Oct 2025
16 Oct 2025
10 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1347837.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .