Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance A 27 NAVBHARAT APARTMENT R C MARG CHEMBUR MUMBAI MAHARASHTRA MUMBAI MAHARASHTRA 400074 | MUMBAI SUBURBAN | MAHARASHTRA | 400074 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
11 Dec 2019, 10:00 amClosed
Sunil Pevekar
MES DEPT ROOM NO 25 ADMIN BUILD RCF LTD CHEMBUR MUMBAI-400074
Biennial Rate Contract for overhauling of Various Equipments in Sewage Treatment and Effluent Treatment Plant at RCF, Trombay Unit.
2019_RCFL_522182_1
ET-MES/297/L/1920/247
Open Tender
Miscellaneous Services
Item Rate
730 days
CHEMBUR MUMBAI
AS PER NIT
11 documents required · 11 mandatory
₹0
₹20,000
Yes
5 Mar 2020
27 Nov 2019
11 Dec 2019
27 Nov 2019
11 Dec 2019
27 Nov 2019
Amount
A. SEWAGE TREATMENT PLANT
Overhauling of Aeration Tank Sluice Gates As per Scope of Work
Overhauling of Grit Classier Assembly as per scope of work
Replacement of Output Shaft Bearing of Grit Classier Drive Shaft Gear Box in Sewage Treatment Plant as per Scope of Work.
Grit Classier Rake Balancing / Alignment in Sewage Treatment Plant as per Scope of Work.
Overhauling of central drive mechanism, Balancing/ leveling of Secondary Clarifier (East & West) in Sewage Treatment Plant as per scope of work.
Replacement of Needle Roller Bearing of Output Shaft of Intermediate Gear Box of Secondary Clarifiers in Sewage Treatment Plant as per Scope of Work.
Replacement of Output Shaft of Intermediate Gear Box of Secondary Clarifier in Sewage Treatment Plant as per Scope of Work.
Replacement of Pinion of Intermediate Gear Box of Secondary Clarifier in Sewage Treatment Plant as per Scope of Work.
Replacement of Worm Shaft of Intermediate Gear Box of Secondary Clarifier in Sewage Treatment Plant as per Scope of Work.
Replacement of Worm Wheel of Intermediate Gear Box of Secondary Clarifier in Sewage Treatment Plant as per Scope of Work.
Overhauling of central drive mechanism, Balancing/ leveling of Detritor (North & South) in Sewage Treatment Plant as per scope of work.
Replacement of Worm Shaft of Central Drive of Detritor Assembly in Sewage Treatment Plant as per Scope of Work.
Replacement of Worm Wheel of Central Drive of Detritor Assembly in Sewage Treatment Plant as per Scope of Work
B. EFFLUENT TREATMENT PLANT
Overhauling of central drive mechanism, Balancing/ leveling of Clarifloculator and scraper arm of Clarifloculator in ETP as per scope of work.
Providing 3.0 mm Backlash B/W Bevel Gear and Bevel Pinion in ETP as per scope of work.
Overhauling of central drive mechanism, Balancing/ leveling of Clarifier and scraper arm in ETP as per scope of work.
C. STP / ETP
Replacement of Corroded Structure in Sewage Treatment / Effluent Treatment Plant
Chemplant Fabricators
S.S.ENTERPRISES
Balaji Engineering Works
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .