Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC BALIAPUR DHANBAD | DHANBAD | JHARKHAND | 818142 | ₹5.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.3 Cr+₹1.2 Cr (23.4%)Rejected-AOC ADARSH NAGAR HIRAPUR DHANBAD | DHANBAD | DHANBAD | JHARKHAND | ₹6.3 Cr+₹1.2 Cr (23.4%) | L2 | Rejected-AOC L2 |
Tender Value
₹5.1 Cr
EMD Value
₹5.1 L
Closing Date
30 Jan 2024, 3:00 pmClosed
Municipal Commissioner
DMC, MADA BUILDING, LUBY CIRCULAR ROAD, DHANBAD
Rejuvenation and Construction of STP for Raja Talab Jharia under DMC, Dhanbad
2024_UDD_81081_1
DMC/30/2023-24
Open Tender
Civil Works
Item Rate
365 days
Dhanbad
Please refer Tender documents.
3 documents required · 3 mandatory
₹25,000
₹5.1 L
9 Apr 2024
18 Jan 2024
31 Jan 2024
18 Jan 2024
30 Jan 2024
18 Jan 2024
Amount
Cleaning and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees and disposal of unserviceable materials and stacking of serviceable material to be used of auctioned upto a lead of 1000m, including removal & disposal of top organic soil not exceeding 150mm in thickness.
Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2
The Moving Media Bio Reactor Technology is aadvanced biological treatment process which has a combination of activated sludge process and attached growth process. The bio reactor has lot of packing material called carrier media in suspension and provides a large surface area for micro organisms to grow and degrade the organic matter in aerobic condition. Due to the use of carrier media, the higher concentration of bio mass is developed which helps to reduce the basin size, accept higher loading rates and take shock loads. The sewage after screening and grit removal flows by gravity into the BIO REACTOR wherein the attached growth, aerobic microbes will utilize pollutant in presence of oxygen thereby, further reducing BOD. The air required will be provided through coarse bubble air diffusers provided on the aeration grid at the bottom of reactor and using positive displacement, twin lobe, root type air blower for supply of oxygen. The PP media is provided in the aeration tank to allow the aerobic microbes to grow and get attached. This media remains in fluid state in the aeration tank thereby keeping large number of microbial colonies moving in the tank and provide high concentration of bio mass available at all the time. The microbes get exposed to bio degradable organics in presence of oxygen and convert it into cell biomass, water molecule and carbon-dioxide. The microbial colony grows on plastic media. The excess bio mass gets sloughed and moves with treated water into subsequent unit.This sloughing action is a continuous process and the microbes keep on growing and sloughing.This is a very fast process and hence system becomes self sustaining. The dead bio mass generated will be separated in the CLARISETTLER TANK wherein tube media is provided for providing additional surface area for settlement of bio mass and thereby reducing the space requirement. The solid-liquid separation is achieved in this tank and clear supernatant will flow by gravity. The treated wastewater will be disinfected with Chlorine and allowed to react in CHLORINE CONTACT TANK prior to suitable disposal. A typical sketch of bio reactor showing various components is given below. The MMBR / FAB Technology has following advantages over Conventional Systems like : 1 Low on civil works 2 Low space requirement 3 Low on operating cost due to higher Oxygen Transfer Efficiency. 4 Low on maintenance cost 5 Easy to operate with semi-skilled manpower 6 Higher efficiencies in pollutant removal 7 Effective removal of nitrates and phosphates 8 Quick retrieval of system after shutdown / power failure SPECIFICATIONS OF SEWAGE TREATMENT SCHEME Raw Sewage Characteristics Temperature Ambient ph 7.0 - 8.0 Total Suspended Solids 210 mg/l BOD 5 days at 20° C 170 mg/l COD 340 mg/l Oil & Grease 30 mg/l MPN 06 to 107 per 100 ML Treated Sewage Quality pH 6.5 - 8.5 Total Suspended Solids < 30 mg/l BOD < 20 mg/l COD < 100 mg/l Oil & Grease < 10 mg/l MPN < 1000 per 100 ML Moving Media Bio Reactor (MMBR) / FAB (Fluidised Aerated Bed) Process Designing, providing, constructing, hydraulic testing, commissioning and giving satisfactory trials of STP consisting of inlet chamber, screen chamber, grit separator, MMBR / FAB (based on technologies providing attached growth on plastic meddi kept suspended in the waste water due to low density of plastic and provided with compressed air for aeration with very high MLSS of greater than 15,000 mg/lit.) tank, secondary clari settler, sludge sump, sludge thickener, chlorine contact tank, chlorinator room/shed, sludge centrifuge, associated piping work with required valves, gates, drains, pathways, administration block cum laboratory, laboratory equipments, spare parts for 2 years of operation, etc. complete as turnkey job with all involved civil, electrical and mechanical works including HT Substation,Transformers,DG Sets ,Metering cubical,Instrumentation & control works etc.as per spacification inclusive of following items, units as per detailed specifications for civil, electrical and mechanical components with all duties and taxes, etc. complete. Treated sewage can be used for irrigation, horticulture purposes. 1. Inlet Chamber.Designing, providing and constructing RCC (M-25) inlet chamber designed for the peak flow including necessary excavation in all types of strata including walkway all around the periphery. Each compartment will have CI gates with extension rod, head stock, operating wheels, GI pipe railing, etc. The work includes providing and making necessary arrangements to connect the flow to screen chamber by approach channel as directed and as per specifications. 2. Screen Chamber - Designing, providing, constructing, testing and commissioning of screen chamber, designed for peak flow in RCC (M-25), including walkway 1.2 m wide with GI pipe. 3. Grit Separator Designing, providing and constructing detritor type grit removal mechanism in RCC (M-25) capable of removing 100% 0.2 mm size particle and above, having specific gravity 2.30 designed for peak flow with suitable arrangement of separation of grit from putrescible solids including providing and making necessary arrangements of Jb-1. Inlet and outlet channels of required sizes as make be required to connect the flow to connecting unit, etc. complete including hydraulic testing for water tightness of structure having minimum FB of 0.3 m, washout arrangement to grit chamber and platform 1.2 m wide RCC walkway with GI pipe handling shall be provided. A pit for collecting grit conveyed by conveyor shall be provided. It should be suitable to handle the grit for carting. All arrangements shall be as detailed specifications and as directed. 4. MMBR / FAB Tank Designing, providing and constructing in RCC (M-25) biological reactor tank for removal of BOD alongwith nutrient removal to handle the average flow and having hydraulics suitable to handle peak flow conditions with suitable 1.2 m wide walkway, expansion joints as required, including foundation, etc as per specifications. The tank shall be equipped with inlet and outlet arrangement, air blowers for supply of air, coarse bubble diffusers and aeration grid in SS 304, PP carrier bio media, etc. FB of 0.5 m and SWD as required should be complete as per detailed specifications. 5. Secondary Clari Settler Designing, providing and constructing in RCC (M-25) watertight secondary clari settler having SWD of 3.75 m + 0.5 m FB and has tube media in the clarification zone to provide additional surface area for settling. The settler shall be provided with a scraper mechanism in MS with epoxy painting for collecting the settled solids at the bottom (bottom slope 1:12). The central feed well shall be made of MS with epoxy painting from both faces and well stiffened. The sewage will be admitted in the feed well and then will move outwards towards periphery slowly and continuously over a weir and will be collected in a launder. 6. Chlorine Contact Tank Designing, providing and constructing chlorine contact tank of adequate capacity to deal with average flow. The contact time provided is 30 mm to achieve 99.99% reduction in coliform during average flow condition. Chlorine dosage will be as per standard provisions including designing, providing and constructing water supply provision for chlorination, including providing dewatering and bypass arrangement for joining to final effluent mains and outlet weir, etc. complete. The effluent quality should match with the standards laid down by Maharashtra Pollution Control Board and as per obligatory provision and as detailed specification and as directed by Engineer-in-charge. Chlorinator and Chlorinator Room / Tonner Room Designing, providing and constructing vacuum type chlorinators having adequate capacity for dosage of adequate chlorine to ensure 99.99% coliform reduction as per obligatory provisions, detailed specifications with necessary provision of having chlorinator room of adequate size. The chlorinator equipment shall include chlorine cylinders / tonners, piping, valves, measuring, controlling equipments, safety devices, lifting equipment, etc. complete as per IS 10553 (Part II) 1982. The tonner room should have min. 3 MT capacity crane for loading and unloading facility. Tonner storage should be distinctly isolated and should have min. storage space as per the detailed specifications and as per gas law 1981 and factory act shall be provided. All other matching amenities shall be provided, 5 MT gantry rail shall be provided for full length of tonner room at 6 m ht. from level of tonner room with outlet. 8. Sludge Sump Designing, providing and constructing of sludge sump and pump for discharging sludge to sludge thickener using MS pipe, etc. complete as per detailed specification. 9. SIudge Thickener Designing, providing and constructing watertight of sludge thickener - gravity type in RCC (M-25) with inlet and outlet pipes, central feed well, sludge it and sludge removal arrangement, grouting wherever necessary with walkway all around of 1.20 m with GI pipe railing interconnecting CI pipes all complete as per specifications, having bottom slope 1:8 and 3 m SWD with necessary fixed bridge scraper arrangement as per detailed specifications and necessary inlet and outlet arrangement, all other arrangement as per detailed specifications. 10. Sludge Centrifuge Platform with Centrifuge Designing, providing, constructing and installing including foundation, etc.,sludge centrifuge to handle the sludge flow of 1 day in 18 hrs per unit with sludge dewatering unit, drain, etc complete is per specification. Sludge centrifuge with necessary arrangements as per detailed specification mentioned in tender and obligatory provisions to be provided with satisfactory functioning. 11. Outfall Sewer Designing, providing, constructing appropriate outfall sewer of RCC NP2 pipe to discharge treated effluent, untreated effluent from outlet chamber (after basin / chlorination tank) to the local Nallah at the point shown on the drawing including necessary chambers for inspection and cleaning including excavation, dewatering, refilling, concrete, encasing / bedding concrete.(after basin / chlorination tank) to the local Nallah at the point shown on the drawing including necessary chambers for inspection and cleaning including excavation, dewatering, refilling, concrete, encasing / bedding concrete. 12. Pipinq Work in Cl LA class includinq Sluice Valves, Reflux Valves, MS Gates Providing, laying and jointing pipes other than those already included in the above items for interconnection, bypass drains, etc. of all units including adequate number of manhole chambers. The item includesexcavations, refilling and hydraulic testing of pipes, valves, gates, accessories and cost of jointing materials. The item includes required channels with gates or interconnection of units, bypass drains, etc. for ill units as directed, etc complete as per detailed specifications. 13. Administrative Buildinq cumLaboratory (G+1) Designing, providing and constructing administrative building, office cum laboratory including stores. This shall be building having appropriate carpet area, at ground floor and at first floor complete as per specifications including necessary excavation, foundation in RCC M-20 framed structure, BB masonry (llnd class in CM 1:6), 20 mm cement plaster in CM 1:3, inside and outside painting, aluminum door and window with glass panels, mosaic tile flooring and skirting and all other allied items, fixtures, fastening, electrification arrangement, water supply arrangement, etc complete. The building will have laboratory on upper floor of administrative building and should have complete control of every unit as per laboratory equipment, beautification, telephone and intercom arrangement and wireless system. NOTES 1.Screen chamber and grit separator upto 5 MLD capacity are manual type. Upto 5 MLD capacity STP, chlorination is done by 2.Using sodium hypochlorite solution. Above 5 MLD capacity, gas chlorinator is provided. 3 Sludge thickener is not provided upto 3 MLD capacity STP. Sludge will be collected into sludge sump and pumped directly to sludge dewatering system. 4 For all STP, sludge dewatering is using solid bowl centrifuge. 5 Chlorinator room not provided for STP upto 3 MLD. For STP upto 3 MLD, labo rat o ry / administration building is not provided. Only a room for operator is provided. 6 Boundary wall, fencing, gate, storm water drains, site clearance is not considered in the scope. 7 All water retaining structures are in M30 grade of concrete. 8 Water table is considered 5 m below GL for design. 9 Soil bearing capacity is considered as 20 T/m2 at 1.5 m below GL. 10 Lead for excavation is considered as 0.5 km. 11 Grade of cement used is OPC 43 grade. 12 Grade of steel used is Fe 415. 13 Peak factor considered for design for plants upto 3 MLD is 3, 4; upto 15 MLD is 2.5, 16; upto 20 MLD is 2.0. 14 Chemicals required during trial run and commissioning are not considered. 15 Water and power during construction, trial run and commissioning shall be provided by client. 16 Power available at STP location is assumed as LT power supply.
Extra for earthwork in hard soil as per specification and direction of E/I (Vide classification of soil item B)
Earth work in filling the trenches after laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction of Engineer-in-Charge.
Providing and supplying ISI mark centrifugally cast (spun) ductile iron pipe of 100 mm and above for water works with socket and spigot ends confirming to IS.8329/2000 in standard working lengths of 4.5, 5.5 & 6.0 m for classification K-9 suitable for suitable for push-on- joint (Rubber gasket D jointing) with cement mortar lining on inside surface with outside zinc and bituminous coating.100 mm dia
Supplying labours, tools, tackles, lubricant etc for laying and jointing DI/C.I. S /S tyton pipes (class LA) trenches, supplying rubber gasket (Rubber gasket confirming to I.S.S -5382 -1969) and making gasket joints including providing night guard, barrier and red light to safe guard against accident all complete (Pipe to be supplied departmentally free of cost and laying of pipes is to be done as per ( I.S.S 3114-1985 ) as per design, specification and direction of E /I 100 mm dia
Supplying labours, tool and tackles for testing of laid CI or UPVC or HDPE or AC or DI pressure pipe all complete as per specification direction E/I. 100 mm dia
Providing and supplying ISI standard D. I. specials & fitting with sealing rubber gasket of S.B.R, complete with cast iron follower gland and M. S. nut bolts coated or otherwise protected from rusting and suitable for D.I.pipes complete as per IS 9523, class K12. 100-300
Providing, double flanged sluice valve (size 50mm to 1200 mm) confirming for IS-2906/ 14846 including worn gear arrangements as lowering, laying, aligning, fixing in position in pipe line, Resilient Seated D/F DI Sluice valves of approved make & design standard of following dia complete (including jointing & jointing material ) including all material, labour, testing and commissioning along with pipe line as per Technical Specification & as per direction of Engineer. 100 mm, PN 1.6
Supplying labour and tools for fixing & testing CI/DI sluice valves in trenches with a pair of tail piece, including making lead caulked/pushon joints and flanged joint as per IS specification, including supplying all jointing materials( Pig lead confirming to IS782:1978, yarn confirming to IS 6587-1972 and nuts and bolts confirming to IS 1364-1983) including drilling holes in flanges if required as per specification and direction of Engineer -in-charge. 100 mm, PN 1.6
Providing and fixing C.I. double acting air valve of approved quality with bolts, nuts, rubber insertions etc. complete. 80 mm Dia Air Valve 80 mm Dia Air Valve Thrust Block
Providing and Laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto Plinth level 1:2:4 (1 Cement: 2 coarse sand: 4 graded stone aggregate 20m nominal size)
Supplying tools and cutting road as well restoring the same as per specification & Dirfection of E/I Pucca road ( except black top only taken out material to be used) for cutting roads as per requirement.
Supply delivery at site with necessary packing, receiving, unloading, shifting, storing, installation, testing and commissioning of Non clog submersible pumping set of 2% Ni CI Cascading, Impeller CF 8M ,Shaft SS 410,mechanical seal with 10M Power & Control cable , 5M Galvanized Chain,,10M, 50mm MS galvanized Guide pipe, Duck Foot Bend, with Guide wire SS 304 etc. complete with all respect as per specification Discharge 36 cum/hr and head 11 to 15 M
Discharge 75 cum/hr and head 11 to 15 M
Demolition of Existing Structures Dismantling of brick/tile work by manual means in cement mortar including T&P, Scaffolding wherever necessary, shorting the dismantled material, disposal of unservisable material and stacking the servicable materials with all Lift and leads of 1000m all complete as per direction of E/I
Trimming and dressing the side slope of dam to proper section with all leads and lifts as per drawing
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 11.20.4 Ordinary cement without any pigment
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished flush.
Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-incharge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolt
Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water.
Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete
Supplying and stacking sludge at site including royalty and carriage upto 5 km lead complete
Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete
Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation.
Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge
Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge
Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20%: one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete.
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliages, creepers etc. including hoeing,weeding, pruning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge and as per direction of officer in charge. 2.40.6Open spaces(1Mali for 3.00Acre).
Aglaonema Parrot Jungle plant (three in one), having ht. 30 cm and above with 20 to 25 leaves, well developed, fresh & healthy in 25 cm size of Earthen pot / Plastic pot.
Areca Palm having ht. 1.20 m to 1.50 m with 5 to 6 suckers, well developed, fresh and healthy with lush green foliage in 25 cm size of Earthen pot / Plastic pot.Each
Croton baby golden variety having ht.30 cm and above, well developed with full of fresh and healthy leaves in 20 cm size of Earthen pot / Plastic pot.
Providing and laying Boulder apron on rever bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical Specification.
Supply of 12 mtr. High Mast in one section Construction S355 grade as per BS-EN 10025 Top Dia 100mm, bottom dia 360mm, plate thickness 3mm, 12 side polygon galvanisation as per BS-EN ISO 1461, base plate dia 520mm, base plate thickness 25mm, GI single spike lighting protection, maximum wind speed 47 m/s with 6 nos. foundation bolt of PCD 445mm TS 600/24mm dia/850 mm long. Luminaires carriage:Material for 40 NB ERW Class B- M.S. Pipe, dia of carriage ring 450mm (ID) with 8 arm, welded, 2 sections having carrying capacity upto 8 luminaries. Trailing cable : 5 core 2.5 sqmm. PVC flexible copper conductor winch / Power Tool : Double drum, SWL 350 kg with 0.75 HP 6 pole single speed intergal motor Rope: Grade AISI 304, 7/19 construction, dia 5mm, BLC 1450 x 2 having 2 nos. of continues rope, Aviation obstruction light: twin dome aviation obstruction lights LED type as required.
For 12 mtr. High mast: ITC of the high mast and light fixture with the help of suitable tools and plants, wiring of luminaries with all wiring material like PVC insulated PVC sheathed flexible cable of suitable copper conductor lugs. MCB and all labour & construction of shallow foundation with M25 grade concrete for the high mast considering safe soil bearing capacity of 10T/mtrs sq. for 12 M High Mast
LED FLOOD Light 240W
Outdoor stand mounted Feeder Panel with 63Amp TP&N, MCB incomer 63 Amp TP Contactor automatic switchng of luminaries, power tool control incomer outgoing terminal etc. as required. (for high mast)
Supply of 4C x 16 sqmm Aluminum Armored XLPE Cable
laying of one number PVC insulated and PVC sheathed / XLPE power cable 1.1 KV grade of size not exceeding 35 sqmm direct in ground including excavation and refilling the trench etc. as required, but excluding sand cushioning and protective covering
Earthing with GI earth pipe 4.5 mtr. Long, 40mm dia including accessories, and providing masonary enclouser with cover plate having locking arrangement and watering pipe etc. with charcoal and salt as required
Supplying and laying 6 SWG GI wire at 0.5 m below ground level for conductor earth electrode, including soldering etc. as required
PVC/XLPE insulated PVC sheathed heavy duty armoured electrical cable with aluminium conductor for working voltage up to and including 1100 volts 16sqmm,4core
Planting of trees and their mainteance for one year, in 0.60 mtr dia holes, 1.0 mtr deep dug in ground , mixing the soil with decayed farm yard /Sludge manure , planting the saplings , backfilling, watering, fixing the tree gauard and mainteance for one year.
Tree Guard with MS Angle Iron and Steel Wire (Providing and fixing tree guard 0.60 metre square, 2.00 metre high fabricated with MS angle iron 30 X 30 X 3mm, MS iron 25 X 3 mm and steel wire 3 mm dia welded and fabricated as per design in two halves bolted together.
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item - A) and disposal of excavated earth as obtained to a distance upto 50 m. including all lifts, levelling, ramming the foundation trenches, removing roots of trees , shrubs all complete as per as per approved design, specification and direction of Engineer In Charge.
Filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50M and lift of 1.5M all complete as per building specification and direction of E/I.
Providing and laying in position cement concrete of specific grade excluding the cost of centering & shuttering-all work upto plinth level: 1:3:6( 1 cement, 3 coarse sand (zone-iii) : 6 graded stone aggregate 20mm nominal size )
Providing & Laying in positionRMC or site batched design mix cement concrete for reinforced cement concrete work using Coarse aggregate and fine aggregate derived from natural sources. M 25
Centering and shuttering including strutting, propoing, etc and removal of form work for (i) For foundation, footings, base of columns, etc
Lintels, beams, plint beams, girders and cantilevers
Columns, pillars, piers, abutments, posts and truts
Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including prepareing the plastered surface smooth with sand paper, scaffolding, curing and taxes all complete as per building specification and direction of E/I Columns
Cleaning and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees and disposal of unserviceable materials and stacking of serviceable material to be used of auctioned upto a lead of 1000m, including removal & disposal of top organic soil not exceeding 150mm in thickness.
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished flush.
Providing, Cutting & fixing TMT bars of 10mm, 12mm, & 16mm as per design and drawing
Providing 12 mm thick cement plaster (1:6) with clean coarse sand of FM 1.5 including screening, curing with all leads & lifts of water, scaffolding taxes & royalty all complete as per building specification and direction of E/I
Supplying, fitting and fixing M. S. grill gate with M. S. grills made of 20 x 6 mm M. S. flats or 16 mm M. S. square bars fitted on 25 x25 x6 mm M.S. angle frame.4 m wide
Providing & Laying in positionRMC or site batched design mix cement concrete for reinforced cement concrete work using Coarse aggregate and fine aggregate derived from natural sources M 30
Centering & shuttering including strutting, propping etc. and removal of formwork for walls of any thickness including attached pilasters, butteresses, plinth and string course etc. Wall of any thickness. Walls any thickness
Desilting 5 steps Earthwork in bed clearance or desilting of canals carrying F.S. discharge between 8.5 cumecs and 0.14 cumecs, disposal of excavated earth etc. in ordinary soil including rough dressing with initial lead of 10m and lift of 1.5m as per specification and direction of E/I
Extra for wet earth all complete as per specification and direction of E/I
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
Earthwork in lip cutting in side slopes and bed of canal in ordinary soil with initial lead of 30M and lift of 1.5M including the cost of formation of sub grade of canal lining, profiling, levelling controllingof slopes and fine dressing with disposal of excavated earth and nominal dewatering if any all complete as per approved design, specification and direction of E/I. Pond deepening by 0.6m
Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item - A) and disposal of excavated earth as obtained to a distance upto 50 m. including all lifts, levelling, ramming the foundation trenches, removing roots of trees , shrubs all complete as per as per approved design, specification and direction of Engineer In Charge.
Add 18 % GST ( In Basic Rate must fill 18)
Add 1 % Labour cess ( In Basic Rate must fill 1)
M/s Daroga Pradhan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .