| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC Accepted Vide Resolution No.1/1 dtd 18/08/2025 of Bellur GP | |
| 2 | NAZEER B L2₹4.6 L+₹65,843.33 (16.6%)Rejected-AOC | L2 | Rejected-AOC Higher rate hence rejected |
| Sl No | Description | Qty | Unit | KALANDAR ASIF K N L1 | NAZEER B L2 |
|---|---|---|---|---|---|
| 1.00Appendix A | |||||
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 882.08 | cum | 198.02 ₹1,74,668.49 Lowest | 230.88 ₹2,03,653.48 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 19.8 | cum | 227.46 ₹4,503.71 Lowest | 265.19 ₹5,250.76 |
| 1.00 | OD430352/2024-2025:Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. (Modified
50.6.7.1) | 43.2 | cum | 4,156.62 ₹1,79,565.98 Lowest | 4,846.21 ₹2,09,356.27 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 18 | sqm | 497.68 ₹8,958.24 Lowest | 580.24 ₹10,444.32 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 151.2 | kilogram | 75.29 ₹11,383.85 Lowest | 87.78 ₹13,272.34 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.7 | cum | 6,577.86 ₹17,760.22 Lowest | 7,669.13 ₹20,706.65 |
Tender Value
₹5.1 L
EMD Value
₹12,711
Closing Date
30 Jul 2025, 5:00 pmClosed
AssistantEngineer
Office of the Assistant Engineer, LIDEW Section, Bellur Grama Panchayat
Annual Plan-Bellur GP Project No 154/26-Kinningar Stadium maintenance(Re-tender)
2025_LSGD_778479_10
1/AE/BLR/25-26
Open Tender
Civil Works - Others
Item Rate
180 days
Bellur GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,125
Yes
₹12,711
Yes
30 Oct 2025
23 Jul 2025
1 Aug 2025
23 Jul 2025
30 Jul 2025
23 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1274715.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .