Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC 41 SABUJ KANAN P O R GOIPALPUR KOLKATA 700 136 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700136 | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹18.9 L+₹3.0 L (18.6%)Rejected-Finance | L2 | Rejected-Finance L2 BIDDER | |
| 3 | L3₹19.7 L+₹3.8 L (23.8%)Rejected-Finance VILL BRAHMANCHAK P O SONAPUKUR P S HAROA DIST 24 PARGANAS N PIN 743502 | SONAPUKUR | 24 PARGANAS N | WEST BENGAL | 743502 | L3 | Rejected-Finance L3 BIDDER | |
| 4 | L4₹20.2 L+₹4.2 L (26.5%)Rejected-Finance | L4 | Rejected-Finance L4 BIDDER | |
| 5 | L5₹20.2 L+₹4.3 L (26.9%)Rejected-Finance | L5 | Rejected-Finance L5 BIDDER |
Tender Value
₹19.9 L
EMD Value
₹39,806
Closing Date
8 Dec 2021, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MDD-I
Office of the Executive Engineer Metropolitan Drainage Division No.-I Jalasampad Bhawan (4th Floor), South Block Bidhannaga Salt Lake City, Kolkata 700091
Clearing and removing water hyacinth, semi solid and jungle cutting from 15.483 km (Krishnamati Bridge) to 28.800 km (Kulti) of Lower Bagjola Khal for the period from 06.02.2022 to 05.02.2023 under Metropolitan Drainage Division No. - I.
2021_IWD_350869_2
WBIW/EE/MDD-I/e-NIT-05/ 2021-22
Open Tender
CIVIL WORKS
Percentage
365 days
Krishnamati Bridge
Please refer Tender documents.
5 documents required · 5 mandatory
₹39,806
Yes
30 Dec 2021
16 Nov 2021
9 Dec 2021
16 Nov 2021
8 Dec 2021
16 Nov 2021
120 days
eProcurement System of Government of West Bengal Created By: DEBABRATA SARKAR Created Date/Time: 17-Dec-2021 02:21 PM Tender Title: WBIW/EE/MDD-I/e-NIT-05/ 2021 -22 SL-2 Tender ID: 2021_IWD_350869_2
Tender Inviting Authority: Executive Engineer/Metropolitan Drainage Division No.-I
Name of Work:-Clearing and removing water hyacinth, semi solid and jungle cutting from 15.483 km (Krishnamati Bridge) to 28.800 km (Kulti) of Lower Bagjola Khal for the period from 06.02.2022 to 05.02.2023 under Metropolitan Drainage Division No. - I.
Contract No: WBIW/EE/MDD-I/e-NIT- 5 / 2021-22, (Sl. No.-02)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 GOMES ENTERPRISE(GSTN-19AFXPG5161J1ZU) 1990303.00 1.25 2015181.79 Twenty Lakh Fifteen Thousand One Hundred and Eighty One
2.00 M/S JYOTI ENTERPRISE(GSTN-19AMKPM2627F1ZY) 1990303.00 -.97 1970997.06 Ninteen Lakh Seventy Thousand Nine Hundred and Ninty Seven
3.00 MARINE INFRASTRUCTURE(GSTN-NA) 1990303.00 1.50 2020157.55 Twenty Lakh Twenty Thousand One Hundred and Fifty Seven
4.00 MAHAVEERA ENTERPRISE(GSTN-NA) 1990303.00 -5.12 1888399.49 Eighteen Lakh Eighty Eight Thousand Three Hundred and Ninty Nine
5.00 BUILDCON(GSTN-NA) 1990303.00 -19.99 1592441.43 Fifteen Lakh Ninty Two Thousand Four Hundred and Fourty One
Lowest Amount Quoted BY: BUILDCON(1592441.43)
BOQ Summary Details Tender Title: WBIW/EE/MDD-I/e-NIT-05/ 2021 -22 SL-2 Tender ID: 2021_IWD_350869_2
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 BUILDCON 1592441.43 L1
2 MAHAVEERA ENTERPRISE 1888399.49 L2
3 M/S JYOTI ENTERPRISE 1970997.06 L3
4 GOMES ENTERPRISE 2015181.79 L4
5 MARINE INFRASTRUCTURE 2020157.55 L5
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .