Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | ₹3.4 L | L1 | Accepted-AOC First lowerst bidder L1 |
| 2 | L2₹3.7 L+₹23,020 (6.71%)Rejected-AOC NULL | ₹3.7 L+₹23,020 (6.71%) | L2 | Rejected-AOC Second lowest bidder L2 |
| 3 | L3₹3.8 L+₹36,920 (10.8%)Rejected-AOC | ₹3.8 L+₹36,920 (10.8%) | L3 | Rejected-AOC Third lowest bidder L3 |
| 4 | L4₹3.9 L+₹47,150 (13.7%)Rejected-AOC | ₹3.9 L+₹47,150 (13.7%) | L4 | Rejected-AOC Forth lowest bidder L4 |
| 5 | L5₹6.2 L+₹2.7 L (79.3%)Rejected-AOC | ₹6.2 L+₹2.7 L (79.3%) | L5 | Rejected-AOC Fifth lowest bidder L5 |
Tender Value
₹5.3 L
EMD Value
₹13,129
Closing Date
20 Apr 2023, 4:00 pmClosed
Assistant Executive Engineer
O/o AEE, PWD Bridges Sub Division Kottayam
Boring with rotary power drilling, recovery of samples, conducting SPT s, Compilation of Field data, Total station surveys, Taking cross sections and Velocity details, preparation of DPR
2023_PWD_571472_1
PWD/BR/TR/22989/2022_3_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
120 days
Punnakkal Chungam
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,160
₹13,129
12 Jun 2023
11 Apr 2023
22 Apr 2023
11 Apr 2023
20 Apr 2023
11 Apr 2023
Amount
Soil Investigation
56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.d.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.9.1:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required)
56.10:Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.c.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.d.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.5.b:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In Water
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.6:Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.7:Conducting standard penetration test in bore hole at any depth.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.14.a:Cross sectional details - River.
56.15.a:Hydraulic Velocity Calculation - River.
OD188974/2022-2023:Testing charges for CBR Test of soil samples collected from the site (in the laboratory) including the collection of subgrade soil samples carefully by excavating pit for laboratory test and refilling back and compacting the excavated pit to lines and levels with approved materials as directed by the departmental officers at site. Rate includes the charges of labour engaged for conducting the test in the lab, field etc (CBR, MDD, etc)
G S Infrastructure
Lamanto T. Somervell
Babu Mathew T M
CHINCHU C EDATT
Bidder Name
Babu Mathew T M
Esteem Developers (P) Limited
G S Infrastructure
Lamanto T. Somervell
CHINCHU C EDATT
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_843625.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .