Tender Value
₹36.0 L
EMD Value
₹36,000
Closing Date
13 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Radhanpur Nagarpalika, Radhanpur
Providing and Supplying Work For 12 Lacs Liter Capacity Sump Near Bharvadvas Bhiloti darwaza at Radhanpur Nagarpalika, Radhanpur.
281679
06 of 2025-26
Open
Miscellaneous Works
Patan
3 documents required · 3 mandatory
₹1,770
Chief Officer, Radhanpur Nagarpalika, Radhanpur.
₹36,000
27 Feb 2026
27 Feb 2026
27 Feb 2026
13 Mar 2026
27 Feb 2026
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph 6 herein
4. Percentages are indicated against each component of each items specified in Schedule B,
based on the Employer's best appreciation of the value of the component as related to the total
costs of the concerned item as whole. A head titled (any other item(s)) is included in each
breakdown of schedule and the tenderer shall at the time of tendering indicate any additional
items which he considers necessary but cannot be covered by any of the heads indicated in
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer’s scheme and design and he should take this into account while quoting his lump sum
prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed and
updated periodically with the Employer's Representative. This bill of quantities will be used for
assessment of percentage progress of the component at any stage. By measurement jointly
taken by the Employer's Representative and the Contractor, mutually agreed and entered in
the measurement books in the form and by the method approved by the Employer's
Representative, and signed jointly by both the parties.
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Percentage Payment to be
Item Description of Items
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation,Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
Note: (Maximum 10 Km. of unlaid pipe will be paid) - to be kept for bulk pipeline Projects
2 PFP, VALVES & PUMPING MACHINERIES
a On receipt of materials on site 70 % of Quoted rate
b On erection 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d After commissioning 5 % of Quoted rate
5 GROUND (UNDERGROUND) LEVEL SERVICE
RESERVOIRS / SUMPS / HGLR/ WTP
a On approval of designs 5 % of Quoted rate
b On completion of excavation and base slab 30 % of Quoted rate
c On completion of vertical wall and braces 25 % of Quoted rate
d Full supporting structure incl. Column, ring beam
and completion of top slab/ dome 25 % of Quoted rate
e Plastering inside & outside with epoxy etc comp.
5 % of Quoted rate
f Procurement and fixing of Inlet, Outlet, Washout,
Overflow pipe valves specials chambers, lighting
arrester conductor and specials @ site 5 % of Quoted rate
g Water level Indicator, painting of letters, MS
ladder pipe, railing and all miscellaneous items
such as snowsem paints in three coats etc. 5 % of Quoted rate
(Completed with all respect) including water
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.STANDARD BIDDING DOCUMENT.pdf
2 SHEDULED - B -FINAL..xlsx.pdf
2. SPECIFICATIONS OF MATERIALS.pdf
5.BUILDINGSPECIFICATIONSBOOK.pdf
6.Standards for Cement Con. Dt.11-5-2017.pdf
7. General Nots condictions C.C Road W.D.1 and 4.pdf
8 Payment Schedule.pdf
Download all tender documents and submit your bid