| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC Award | |
| 2 | L2₹2.8 L+₹13,128 (4.86%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹2.9 L+₹15,426.05 (5.71%)Rejected-Finance | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | RAJAN L2 | sunil verma L3 | kamlesh kishore L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work, blasting work, chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15 cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge. | 2.43 | Cum | 370 ₹899.1 | 365 ₹886.95 | 360 ₹874.8 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the costof certaining and shuttering - All work up to plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) in all leads & lifts. | 0.81 | Cum. | 8,500 ₹6,885 | 8,100 ₹6,561 | 8,000 ₹6,480 Lowest |
| 3.00 | Centering and shuttering includung strutting, propping etc. and removal of form fo all heights.:walls (any thickness) including attached pillasters buttresses, plinth and string courses etc in all leads and lifts. | 15.2 | Sqm | 570 ₹8,664 | 580 ₹8,816 | 550 ₹8,360 Lowest |
| 4.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, huttering, finishing and reinforcement: 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts. | 6.1 | Cum | 10,800 ₹65,880 | 10,500 ₹64,050 | 10,000 ₹61,000 Lowest |
| 5.00 | Steel reinforcement for R.C.C. work includ straightening, cutting, bending, placing in posi and binding all complete upto plinth level. steel and Medium Tensile steel bars in all leads and lifts. | 213.5 | Kg | 110 ₹23,485 | 105 ₹22,417.5 | 100 ₹21,350 Lowest |
| 6.00 | Steel work welded in built up sections/ framed work including cutting hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc as required In gratings frames guard bar ladder railings brackets gates and similar works in all leads and lifts. | 1,075.94 | Kg | 165 ₹1,77,530.1 | 170 ₹1,82,909.8 | 160 ₹1,72,150.4 Lowest |
Tender Value
₹2.7 L
EMD Value
₹5,500
Closing Date
7 Jun 2025, 5:00 pmClosed
Executive Engineer
EE JSV Mandi
Provision for Lowering Arrangment of Submersible Pump at RCC Sump well at Bhiyali
2025_HPIPH_106314_1
2137-76
Open Tender
Civil Works
Item Rate
90 days
BAnoul
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹5,500
9 Sept 2025
27 May 2025
9 Jun 2025
27 May 2025
7 Jun 2025
27 May 2025
Amount
Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work, blasting work, chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15 cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the costof certaining and shuttering - All work up to plinth level : 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) in all leads & lifts.
Centering and shuttering includung strutting, propping etc. and removal of form fo all heights.:walls (any thickness) including attached pillasters buttresses, plinth and string courses etc in all leads and lifts.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, huttering, finishing and reinforcement: 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts.
Steel reinforcement for R.C.C. work includ straightening, cutting, bending, placing in posi and binding all complete upto plinth level. steel and Medium Tensile steel bars in all leads and lifts.
Steel work welded in built up sections/ framed work including cutting hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc as required In gratings frames guard bar ladder railings brackets gates and similar works in all leads and lifts.
RAJAN (BID ID -522458)
sunil verma (BID ID -522455)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .