Executive Engineer, Gir Somnath Irrigation Division, Veraval Ishvar Complex, 3rd Floor, A-Wing, Opp. Reliance Mall, Veraval-Junagadh Road, Veraval-362265
Maintenance Of Left And Right Bank Main Canal For Rabi Season 2025-26 Of Raval Irrigation Scheme.(Second Attempt)
271171
Online E-Tender Notice No. 33 of 2025-26
Open
Civil - All
Works
Gir Somnath
6 documents required · 6 mandatory
₹900
Yes
Executive Engineer,Gir Somnath Irrigation Division,Veraval
₹14,000
Yes
30 Jan 2026
30 Jan 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
1 Providing murrum including spreading
the same and dressing the side slope &
top surface in required grade and 1066.00 cum 166.00
camber with lead upto 1.0 km etc
2 Dismentalling road surface including
sorting & Stacking of useful and unuseful
material from the dismentalled materials 14.00 cum 681.00
as directed under detailed specification
etc complete. (a) Cement Concrete
3 Dismentalling stone/brick masonary &
stacking of useful and unuseful material
from the dismentalled materials as 29.50 cum 616.00
directed etc complete.(a) In cement
4 Dismentalling the exisitng RCC pipes
including sorting out and stacking of the
usefull material ( Pipe) upto lead 200 mt. 18.00 Rmt 214.00
as directed under the specification.(iii)
650mm to 900mm diameter
5 Excavation in all sort of strata and
formations incl. depositing the unuseful
excavated stuff as and where directed
incl sorting and stacking useful materials
as directed upto 30 mt lead etc. 78.00 cum 83.00
complete incl. dewatering.
( Depth 0 TO 3.0 mt ) (For all type canal &
foundation trenches of C.D. works ) A) IN
OVERBURDEN INCL. HARD MURRUM.
6 Prov. & Laying in position "NOMINAL
MIX' cement concrete using cement,
sand and crushed aggregate by mass
and machine mix for C.C. work incl.
necessary formworks centering 3.50 cum 3816.00
scaffolding compaction by mechanical
vibrator,curing as directed with all lead
& lift etc complete C) Concrete grade
1:2:4 and MSA-40mm
7 Prov. and Laying in position Controlled
cement concrete using cement, sand and
crushed aggregate by mass and machine
mix for R.C.C/CC work including
necessary formworks centering
scaffolding compaction by mechanical
vibrator,curing as directed with all lead
& lift etc complete Excluding the cost of
reinforcement FOR PIER AND ABT.A)
Concrete grade M-15 and MSA- 40mm
8 Prov. and Laying in position Controlled
cement concrete using cement, sand and
crushed aggregate by mass and machine
mix for R.C.C/CC work including
necessary formworks centering
scaffolding compaction by mechanical
vibrator,curing as directed with all lead
& lift etc complete Excluding the cost of
reinforcement FOR SLAB AND LOFTS C)
Concrete grade M-20 and MSA-20mm
9 Providing local stone or such other hard
stone bela or block in course dressed
sand stone /lime stone masonry in super 22.50 cum 3926.00
structures incl striking out joints curing
etc complete as directed in C.M. 1:5
10 Cement plaster 12mm thick in single coat
to CC/RCC /masonry work in C.M. 1:3
incl finishing,curing, scaffolding etc
complete.a) UPTO 6.0 Mt HEIGHT
11 Providing,cutting,bending,binding and
fixing in position as per drawing.TMT
BAR , Fe-415 reinforcement for R.C.C.
works and anchor bars incl cost of black
annealed 16 to 18 BWG M.S.. Wire
etc.complete with all lead and lift.
12 Back filling with appropriate excavated
material behind the structures or refilling
the trenches with excavated useful
material including watering ramming,
consolidation etc complete with all lead
I/We am/are willing to carry out the work at… ...................... % above/below
percent(Should be written in figures and words) of the estimated rate mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification In In
and reference to book of figures Words
specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:MIS102010/17/K1 Date:30/07/2018 as stated in S.O.R. there fore in R.C.C.
items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Signature of Contractor Executive Engineer
Gir Somnath Irrigation Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender.pdf
BOQ.pdf
Tender Notice No 33 of 2025-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .