| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr Quoted ₹3.4 Cr | L1 | Accepted-AOC Being L-1 |
| 2 | L2₹3.9 Cr+₹46.8 L (13.6%)Rejected-Finance | ₹3.9 Cr+₹46.8 L (13.6%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹4.3 Cr+₹85.6 L (24.9%)Rejected-Finance | ₹4.3 Cr+₹85.6 L (24.9%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹4.5 Cr+₹1.0 Cr (30.4%)Rejected-Finance | ₹4.5 Cr+₹1.0 Cr (30.4%) | L4 | Rejected-Finance Being L4 |
Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
30 Mar 2026, 10:30 amClosed
Superintending Engineer 1st Circle HPPWD Mandi
O/o Superintending Engineer 1st Circle HPPWD Mandi
ROFD, Protection works, Cross Drainage works, Metalling and Tarring works, Road Side Drain, Crash Barrier, Parapets, Road Safety, Km. stone and Dumping structure in Km. 0/00 to 4/200.
2026_CEHP_146928_9
PW-SE-I-Tender-107- PMGSY-IV B-I /2025-26-14254-14302 Dated 16.02.2026
National Competitive Bid
Civil Works - Roads
Percentage
365 days
In Karsog Division HPPWD
As per SBD.
8 documents required · 8 mandatory
₹7,000
₹9.2 L
3 Jun 2026
10 Mar 2026
30 Mar 2026
10 Mar 2026
30 Mar 2026
10 Mar 2026
10 Mar 2026 - 23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damages to hill side, water pollution etc. and to protect stability of hill side .Rock shall be excavated with chiseling and wedging out of rock (where blasting is prohibited) .All earth work in cutting/excavation including rock excavation shall be carried out true to lines ,grades, sides slopes, width, camber, super-elevation and level as shown on the drawing and as directed by the Engineer-in-Charge in conformity with the requirement of MoRD technical specification for Rural Road, Section. 300 & 1600 to achieve designed formation width including hauling and stacking of materials useful for construction at suitable sites safe manner and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load and animal transport and mechanical means along with its leveling, fine dressing and carriage of machineries, tools, equipment’s and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. During the mobilization period, contractor should take the advanced x-section in 15 m (fifteen metre) interval of whole road length in the presence of Engineer-in-charge or his representative. In case the advanced x-sec has been taken in the presence of Engineer-in-Charge representative, in that case the same has to be got approved from Engineer-in-Charge. The land for dumping sites shall be arranged by the contractors himself and nothing extra shall be paid on this account, filling of unevenness blind age and finishing of the road to specified dimensions or as directed by the Engineer in-charge for smooth riding. The recovery for stones ,whether useful or 2378.85 (two thousand three hundred seventy eight point eight five) cubic metre at the rate of Rs 300/-only (Rupees three hundred only ) per cubic meter shall be effected on prorata basis in all circumstances .Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor ,which shall have to be duly compensated by him in all cases. The rate is including octroi, royality, Malkana, toll tax, or any other taxes imposed by the Government but excluding GST. | 13,111.05 | Per cubic metre | 280.15 | ₹36,73,060.66 |
| 2 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drain and Parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks (Where blasting is prohibited) as per drawings and M.O.R.D. technical specification section 300 and 1600 and as per direction of the Engineer- In – Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and lift including dressing of sides, bottom and back filling in trenches with excavated suitable approved material to the original surface in layer not executing 150 mm (one hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water ) upto any depth any quantum of water including cleaning of slush which may arise out during dewatering complete as per direction of Engineer in-Charge. Including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 2,050.12 | Per cubic metre | 441.2 | ₹9,04,512.94 |
| 3 | Providing and laying concrete Mechanically mixed and compacted by vibration mix 1:6:12 (one cement : six sand: twelve graded crushed stone aggregate 40mm (forty millimeter) nominal size) for plain /reinforced concrete in open foundations and plinths or similar works complete as per drawings and technical specification section 800,900,1200 and 1600 including pumping or bailing out water, dewatering, removal of slush as required at site which may arise at the time of laying concrete complete for all heights/depths including the cost of form work in retaining walls, breast walls etcetera as per the direction of Engineer-in-Charge including carriage of materials, within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, or any other taxes imposed by the Government but excluding GST. | 46.92 | Per cubic metre | 4,592.3 | ₹2,15,470.72 |
| 4 | Providing and laying concrete mechanically mixed and vibrated PCC M-10 1:3:6 nominal mix (one cement: three sand: six graded crushed stone aggregate 20 (twenty millimetre) nominal size for plain/reinforced concrete in open foundation and plinths or similar works complete as per drawings and MoRD technical specification section 800, 900, 1200 and 1600 and curing complete including the cost of form work and hauling of materail in all leads and lifts as per the entire satisfication and direction of Engineer in charge. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 774.07 | Per cubic metre | 5,979.6 | ₹46,28,628.97 |
| 5 | Providing and laying mechanically mixed and vibrated plain cement concrete grade M-15 (Fifteen) design mix with cement content not less than 275kg (two hundred seventy five kilogram) per cubic metre with 40mm (forty millimetres) nominal size) graded crushed stone aggregate concrete for plain/reinforced concrete in sub structure complete as per drawings and MORD technical specifications Clause 800, 900, 1200 and 1600 and curing complete including the cost of form work as per the direction of the Engineer-in-Charge including carriage of material within all leads, lifts and other incidental. The rate is including Octroi, Royality, Malkana, Toll Tax or any other Taxes imposed by the Government excluding GST. | 156.74 | Per cubic metre | 6,274.3 | ₹9,83,433.78 |
| 6 | Providing and laying concrete mechanically mixed and vibrated mix 1:4:8 (one cement: four sand: eight graded crushed stone aggregate 40mm(forty millimetre) nominal size for plain/reinforced concrete in foundation and plinths or similar works complete as per drawings and MoRD technical specification section 800, 900, 1200 and 1600 and curing complete including the cost of form work and hauling of materail in all leads and lifts as per the entire satisfication and direction of Engineer in charge.The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 54.91 | Per cubic metre | 5,309.1 | ₹2,91,522.68 |
| 7 | Construction of dry rubble masonry for retaining walls, breast walls, revetment walls and parapets etcetera for sub structure and super structure complete as per drawing and MORD technical specifications section 700, 1300 & 1600 and as per direction of Engineer-in-charge including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, or any other taxes imposed by the Government excluding GST. | 1,236.85 | Per cubic metre | 3,961.8 | ₹49,00,152.33 |
| 8 | Random rubble Stone masonry in cement mortar 1:6 ( one cement : six sand) for substructure complete as per drawings and MORD technical specification section 700, & 1200 clause 1604, curing complete as per the direction of the Engineer-in-Charge including carriage of material within all leads, lifts and other incidental. The rate is including octroi, Royality, Malkana, toll tax, or other taxes imposed by the Government but excluding GST. | 1,175.63 | Per cubic metre | 5,583.4 | ₹65,63,990.21 |
| 9 | Providing and laying of boulder apron laid in wire crates with 4 mm (four millimetre) dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm (one hundred millimetre into one hundred millimetre) mesh (woven diagonally) including 10 % (ten percent) extra for laps and joints laid with stone boulders weighing not less than 40 kg (forty kilogram) each as per drawing and MORD technical specifications section 1300 including carriage of materials within all leads, lifts and other incidental . The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 632.81 | Per cubic metre | 2,971.3 | ₹18,80,268.35 |
| 10 | Providing and laying 100mm (One Hundred millimetre) dia PVC pipe weep holes in brick masonry/stone masonry, plain reinforced concrete, Abutments, Wing walls, Return walls and retaining/breast walls extended through the full width of the structure with slope I(V):20(H)(One vertical : Twenty Horizontal) towards draining face complete as per drawing and MORD technical specification section 700, 1200 and as per direction of Engineer-in-charge including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, or any other taxes imposed by the Government excluding GST. | 1,674 | Each | 195.4 | ₹3,27,099.6 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
SBD_NARASBEGO_HP08579.pdf
Tender Documents • 1.34 MB
BOQ_227597.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .