Ex. Engineer PWD Berhampore Divn.II
Office of the Ex. Engineer PWD Berhampore Divn.II
Replacement of damaged wooden beams with iron beams at the roof of CMOH Bungalow
2026_PWD_1009862_2
WBPWD/EE/BD-II/eNIT-27/25-26
Open Tender
CIVIL WORKS
Percentage
90 days
Lalbagh
Please refer Tender documents.
4 documents required · 4 mandatory
₹58,127
Yes
12 May 2026
18 Feb 2026
11 Mar 2026
21 Feb 2026
9 Mar 2026
21 Feb 2026
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. 1st floor including roof.
Examining wooden beam by sounding or boring.
Examining wooden burghas by sounding
Opening out and examining portion of bearing of beam including mending good damages as necessary.
Replacing wooden beam or R.S. joist by R.S. joist or by another wooden beam joist and fixed complete, including hire and labour charges for necessary sal bullah props, necessary packing between beams and burgahs but excluding the cost of joist or wooden beam and concrete/ Brick works etc needed for mending damages. [Mode of payment for wooden beam (raplacing the old one) will be made against Item No. 4 of carpanter's work] Height exceeding 5m but not exceeding 7.3m. Clear span exceeding 5m but not exceeding 6m.
Clear span exceeding 6m but not exceeding 7.3m.
Labour for lowering and stacking after dismantling in parts R.S. joists, channels, angles, tees, plates etc.complete as directed. From 2nd floor leve.
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m.
Labour for hoisting and placing in proper position (up to 1st floor level) departmental R.S. joists, channels, angles. Tees, plates etc. including fitting and fixing same with bolts and nuts, if necessary (but excluding cost of such bolts and nuts)
Extra for Staging beyond 4 m [mode of measurement: Area of unsupported horizontal projection (where staging beyond 4 m is practically unavoidable) x mean height of staging] above initial 4 m.
Wood work in beams and burgahs fitted and fixed in position complete. (Cost for repairing of Damage to be paid separately). Sal : Siliguri. 1st Floor.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof). 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. 1st Floor
Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture]. M 25 Grade. Nalhati Variety.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 m. Tor steel/Mild Steel. JSW/JSPL/SHYAM/ SRMB/BMASL/ELECROSTEEL/SSL.
Brick work with 1st class bricks in cement mortar (1:6). In superstructure, 1st floor.
Cleaning and removing conservancy garbage mixed with rubbish & other filthy materials from the road side flank, drain and compound including cutting, loading, unloading to and from truck or cart by Mathor labour & removing the same to any distance.
ADD GST
ADD CESS
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.11 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_2479531.xls
BOQ • 0.25 MB
2911_ii.pdf
Tender Documents • 2.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .