| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC 20 1 2024 | ₹1.0 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.1 Cr+₹7.2 L (6.91%)Rejected-AOC | ₹1.1 Cr+₹7.2 L (6.91%) | 2 | Rejected-AOC L2 |
| 3 | 3₹1.1 Cr+₹9.5 L (9.06%)Rejected-AOC | ₹1.1 Cr+₹9.5 L (9.06%) | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | ABDUL GAFOOR L1 | VINCENT V J L3 | Boulder Developers Private Limited L2 |
|---|---|---|---|---|---|---|
| 1.00Structural works | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 115.9 | cum | 216.2 ₹25,056.72 Lowest | 235.64 ₹27,309.73 | 231.07 ₹26,780.09 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 16.38 | cum | 301.8 ₹4,942.28 Lowest | 329.03 ₹5,388.2 | 322.65 ₹5,283.72 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 182.63 | cum | 267.2 ₹48,798.47 Lowest | 291.3 ₹53,199.83 | 285.65 ₹52,167.97 |
| 1.00 | OD439861/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 1.96 | cum | 3,350.8 ₹6,577.62 Lowest | 3,652.69 ₹7,170.23 | 3,581.87 ₹7,031.21 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 29.16 | cum | 6,656.2 ₹1,94,114.76 Lowest | 7,255.95 ₹2,11,605.27 | 7,115.27 ₹2,07,502.62 |
| 1.01 | 4.17:Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse
sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm
nominal size derived from natural sources) over 75mm thick bed of dry brick
ballast 40 mm nominal size, well rammed and consolidated and grouted with
fine sand, including necessary excavation, levelling & dressing & finishing the
top smooth. | 120.51 | sqm | 717.2 ₹86,429.77 Lowest | 781.86 ₹94,221.95 | 766.71 ₹92,396.22 |
| 1.01 | 5.33.1.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 47.47 | cum | 9,137.1 ₹4,33,729 Lowest | 9,960.32 ₹4,72,806.43 | 9,767.21 ₹4,63,639.69 |
| 1.01 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 145.52 | cum | 10,844.1 ₹15,78,000.9 Lowest | 11,821.2 ₹17,20,185.56 | 11,592.01 ₹16,86,834.52 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 27,067.33 | kilogram | 94.3 ₹25,52,449.22 Lowest | 102.83 ₹27,83,333.54 | 100.84 ₹27,29,469.56 |
Tender Value
₹1.2 Cr
EMD Value
₹50,000
Closing Date
21 May 2026, 1:00 pmClosed
Secretary LSGD, Sulthan Bathery Block Panchayath
O/f Secretary LSGD, Sulthan Bathery Block Panchayath
Wayanad Development Package Construction of School building at GLP school Edakkal Wayanad Nenmeni GP General Civil Work
2026_CRD_850308_1
SEC/LSGD/BPSBY/925854-25
Open Tender
Civil Works - Buildings
Item Rate
360 days
Sulthan Bathery
Please refer Tender documents.
7 documents required · 7 mandatory
₹6,508
Yes
₹50,000
Yes
15 Sept 2026
14 May 2026
22 May 2026
14 May 2026
21 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Structural works | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.4 | cum | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.003 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 0.6 | cum | - | - |
| 1.004 | OD439861/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | - | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 4.17:Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse
sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm
nominal size derived from natural sources) over 75mm thick bed of dry brick
ballast 40 mm nominal size, well rammed and consolidated and grouted with
fine sand, including necessary excavation, levelling & dressing & finishing the
top smooth. | - | sqm | - | - |
| 1.007 | 5.33.1.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum | - | cum | - | - |
| 1.008 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 0.8 | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1436786.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 15.55 MB
BOQ_1436786.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .