Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 LAccepted-Finance | 1 | Accepted-Finance As per BOQ chart | |
| 2 | 2₹2.9 L+₹8,614 (3.03%)Accepted-Finance | 2 | Accepted-Finance As per BOQ chart | |
| 3 | 3₹2.9 L+₹9,617 (3.38%)Accepted-Finance | 3 | Accepted-Finance As per BOQ chart |
| Sl No | Description | Qty | Unit | TECH-SUN ENGINEERING L1 | WELDMAKE ENGINEERING L3 | MOTHERSON L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling and removal of existing gear box from Homogenizer I & II | 3 | job | 6,000 ₹21,240 Lowest | 6,250 ₹22,125 | 6,150 ₹21,771 |
| 2.00 | Transportation, mobilization and handling of A frame and chain block | 1 | job | 16,000 ₹18,880 Lowest | 16,300 ₹19,234 | 16,800 ₹19,824 |
| 3.00 | Safe lifting, rigging and handling of gearbox using A frame and chain block | 1 | job | 32,000 ₹37,760 Lowest | 32,500 ₹38,350 | 32,250 ₹38,055 |
| 4.00 | Transfer and installation of gear box to another homogenizer | 1 | job | 11,000 ₹12,980 Lowest | 11,250 ₹13,275 | 11,400 ₹13,452 |
| 5.00 | Removal of old gearbox and placement in designated unit | 1 | job | 26,500 ₹31,270 Lowest | 27,000 ₹31,860 | 27,100 ₹31,978 |
| 6.00 | Welding and cutting works as required | 1 | job | 11,500 ₹13,570 Lowest | 11,800 ₹13,924 | 11,750 ₹13,865 |
| 7.00 | Renewal/ replacement of bolts and nuts in gearbox and bed area | 1 | job | 6,500 ₹7,670 Lowest | 6,750 ₹7,965 | 6,600 ₹7,788 |
| 8.00 | Inspection of gears, bearing and seals | 1 | job | 8,500 ₹10,030 Lowest | 8,800 ₹10,384 | 8,750 ₹10,325 |
| 9.00 | Gearbox alignment, fitting and securing | 1 | job | 9,000 ₹10,620 Lowest | 9,500 ₹11,210 | 9,500 ₹11,210 |
| 10.00 | Surface preparation, cleaning, consumable materials and painting of gearbox | 1 | job | 16,500 ₹19,470 Lowest | 16,900 ₹19,942 | 17,000 ₹20,060 |
Tender Value
Refer Docs
Closing Date
1 Sept 2026, 5:00 pmClosed
Deputy General Manager
TCMPF Ltd., Central Dairy, MMC, Chennai-51
Servicing and Replacement of Gearbox from Homogenizer-I to Homogenizer-II in the Processing Section at Central Dairy, Madhavaram
2026_TCMPF_695640_1
1906/AGME/CD/PS/26
Limited
Supply, Erection and Commissioning
Works
Central Dairy Madhavaram
REFER TENDER DOCUEMNT
2 documents required · 2 mandatory
₹0
Exempted
10 Oct 2026
19 Aug 2026
2 Sept 2026
19 Aug 2026
1 Sept 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling and removal of existing gear box from Homogenizer I & II | |||||
| 2Transportation, mobilization and handling of A frame and chain block | |||||
| 3Safe lifting, rigging and handling of gearbox using A frame and chain block | |||||
| 4Transfer and installation of gear box to another homogenizer | |||||
| 5Removal of old gearbox and placement in designated unit | |||||
| 6Welding and cutting works as required | |||||
| 7Renewal/ replacement of bolts and nuts in gearbox and bed area | |||||
| 8Inspection of gears, bearing and seals | |||||
| 9Gearbox alignment, fitting and securing | |||||
| 10Surface preparation, cleaning, consumable materials and painting of gearbox | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
TenderDocument.pdf
Tender Documents • 0.49 MB
BOQ_836436.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .