Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
5 Sept 2026, 6:00 pm
Executive Engineer, panchayat, R & B Division, Surat.
Package No./PAL/MMGSY/RES/2-RD/26-27 1)Dastan Bagumara taraf surat Bardoli state highway ne jodto Road KM 0/00 to 3/000 (2)Ambheti Halpativas road at village Ambheti Km 0/0 to 0/850 Total Lentgh:3/850 km Ta. Palsana Di. Surat.
339778
07 of 2026-27
Open
Civil Works - Roads
Works
Surat
5 documents required · 5 mandatory
₹3,600
Executive Engineer, panchayat R & B Division, surat
₹1.4 L
28 Aug 2026
28 Aug 2026
28 Aug 2026
5 Sept 2026
28 Aug 2026
Name of work: Package No.F/PAL/MMGSY/RES/2-RD/26-27 (1)Dastan Bagumara taraf surat
Bardoli state highway ne jodto Road KM 0/00 to 3/000 (2)Ambheti Halpativas
road at village Ambheti Km 0/0 to 0/850 Total Length-3.850km Ta. Palsana Di.
Memorandum showing items of works to be carried out
It. No. Quantities Item of work Estimated Total Amount
It. No. Quantities Item of work Estimated Total Amount
estimated but may In figures according to
be more or less Rs. Ps. estimated
1 0.399 Hect. Clearing and grubbing road land including uprooting
rank vegetation grass bushes,shrubs,sapling and trees
girth up to 300 mm removal of stumps of trees cut
earlier and disposal of unserviceable materials(D) By 34889.38
mechanical means in area of thorny jungle
2 3997.00 Cu.mt. Box cutting the road surface to proper slope and
camber formaking a base for road work including
removing the excavated stuff and depositing on the
road side slope as directed upto 50Mt.lead. 109.41
3 2243.00 cu.mt. Construction of granular sub-base 150 mm thick layer
by providing machine crushed B.T. material satisfying
MORT&H specification (Fifth revision) of Grading I
including spreading in uniform layer with motor
grader on prepared surface, mixing by mix in place
method with rotavator at OMC and compacting with 782.86
vibratory roller to achieve the desired density etc.
4 1580.00 Cu.mt. Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC
in mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers with paver in 860.23
sub- base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired
5 9750.00 Sq.mt. Providing and applying evenly Priming coat with
emulsion asphalt at the rate of 7.50 Kg/ 10 Sq.m on
road surface using emulsion SS-1 (Himcol Made)
pressure spreayer etc. complete including the cost of 60.26
asphaltspreayer etc. complete including the cost of
6 38.25 cu.mt Providing and laying cement concrete 1:2:4 (
Cement : 2 : coarse sand : 4 graded stone aggregate
20mm nominal size) and curing complete excluding
cost of form work in (A) Foundation & Plinth (more 3741.68
7 2763.00 Sqmt Providing and fixing pre-cast steel Dye inter locking
concrete block 100 mm thick with grade of concrete
M 250 pnumatic compressed / vibrated mechanically
and as per approved design Confirming to IS 15658 :
2006 including 35 mm Sand layer for levelling and
filling the joint with sand in proper line and level as 1038.73
per guidlines of IRC : SP 63-2018 etc. Complete.
8 12.00 M.Ton Providing and laying bituminous base course 37.5mm
thick compacted in one layer with tack coat of asphalt
Emulsion RS-1 at the rate of 4.0 Kg / 10 Sqmt. and
using B.T. stone aggregate or required gradation and
asphalt (VG-30) grade for mixing @ 1.99 % by
weight of total mix for mixing including heating the
aggregate and asphalt by drum mix plant and 2795.68
spreading the same by paver finisher and
consolidation with vibratory roller including providing
all meterials, equipments, tools and plants, oil,
kerosene, fire wood, labour chrges etc. complete.
9 941.30 M.Ton Providing & laying 37.5 mm. thick compacted
Bituminous Macadam with using VG-30 asphalt for
tack coat at 2.50 Kg / 10 Sq.Mt. using stone aggregate
as per gradation and aspahlt grade VG-30 at 3.40 %
by weight of total mix hot laid process with drum mix
plant including consolidation with vibrating roller 3590.62
including operating plant and machinery cost of
asphalt, fuel, oil, lubricant and labour charges etc.
10 656.10 M.Ton Providing & laying 25 mm. thick SDBC using B.T.
stone chips as per MORTH gradation and
specification with asphalt VG-30 at the rate of
kg. / M.Tone of total wt. for mix i.e. (5.00 % ) by
weight of total mix of bitumen including mixing
aggregates & asphalt by continuous batching drum
mix plant & spreading the same by paver finisher 4508.79
including rolling & consolidation with 10 - 12 tonnes
vibratory roller & providing tools plants, fire wood,
oil, kerosene, labour charges using contractor's own
machineries etc. complete.
11 11410.00 Sq.mt. Providing and laying asphalt painting on B.T. surface
with bitumen VG-30 at rate 5.00Kg / 10Sq.mt.
including spreading stone dust for painting surface at 43.88
rate of 0.03 cu.mt. / 10 sq.mt.
12 6.00 No.s Providing and fixing ordinary Kilometer stone of
precast C.C. 1:2:4 including necessary reinforcement
as per I.R.C. type design in C.C. 1:4:8 including 704.33
painting,lettering etc. complete (For O.D.R and V.R.)
13 16.00 No.s Providing and fixing Hectometer as per I.R.C. type
design including painting, lettering etc. complete.(ii)
Fixing in C.C. 1:5:10
14 2.00 No.s Informatory Signs :-Providing and fixing sing boards
made out of 2mm aluminium sheet; size 80 x 60cms.
rectangle as per the design of IRC-67-1977 pre treated
with phospheting process & acid teching; coated with
one coat of epoxyprimer and two coats of best
qualityepoxy paint; reflectorised with retro refiective
sheeting as per latest M.O.S.T. Specifications; 3.1m
long stand postand frame fabricated from suitable
sizeiron angle of 35 x 35 x 3mm75x75x6mm as
required; painted with best qualityepoxy coatings in
black and whitebends. the details of symbol for
eachboard shall details of symbol for eachboard shall
be as per the instruction ofengineer in charge. The
fixing at site shall be in 1:2:4 CC block of size 45 x45
x 60cms. for each leg. including excavation curing tec.
complete under the supervision of engineer in
charge.(A) Engineer Grade(VR)...
15 3.00 No.s Village name/ Bump Ahed sign :-Providing and fixing
sing boards made out of 2mm aluminium sheet; size
90 x 60cms. rectangle as as per the design of IRC-67-
1977 pre treated with phospheting process & acid
etching; coated with one coat of epoxy primer and two
coats of best quality epoxy paint; reflectorised with
retro refiective sheeting as per latest M.O.S.T.
Specifications; Letters and numerals should be as per
IRC-30-1968, 3.1m long (2 nos) stand post and frame
fabricated from suitable size iron angle of 50 x 50 x
5mm painted with best quality epoxy coatings in black 5045.36
and white bends. the details of symbol or inscription /
numerals for each board shall be as per the instruction
of engineer in charge. The fixing at site shall be in
1:2:4 CC block of size 45 x 45 x 60cms. for each leg.
including excavation curing etc. complete under the
supervision of engineer in charge.(A) Engineer
16 4.00 No.s Direction sign (Junction board):-Providing and fixing
sing boards made out of 2mm aluminium sheet; size
244 x 122cms. rectangle as as per the design of IRC-
67-1977 pre treated with phospheting process & acid
etching; coated with one coat of epoxy primer and two
coats of best quality epoxy paint; reflectorised with
retro refiective sheeting as per latest M.O.S.T.
Specifications; Letters and numerals should be as per
IRC-30-1968, 3.1m long (2 nos) stand post and frame
fabricated from suitable size iron angle of 50 x
x5mm 75x75x6mm as required; painted with best
quality epoxy coatings in black and white bends. the 14831.71
details of symbol or inscription / numerals for each
board shall be as per the instruction
of engineer in charge. The fixing at site shall be in
1:2:4 CC block of size 45 x 45 x 60cms. for each leg.
including excavation curing etc. complete under the
supervision of engineer in charge.(A) Engineer
17 12.00 No.s Chevron sign :-Providing and fixing sign boards made
out of1.5mm aluminium sheet / 3mm ACP
(Aluminum compositePanel); size 60x50cm
rectangular as per design ofIRC-67-2012. Pre treated
with phospheting process & acidetching; coated with
one coat of epoxy primer and two coats ofbest quality
epoxy paint ; reflectorised with High
IntensityPrismatic Grade retro refiectivesheeting of
Type-4 as perASTM D-4956 and latest
M.O.S.T.Specifications; 3.3 mtr longstand post of Iron
Angle 75 x 75 x 6mm / 65NB Circular MSPipe as
required and frame fabricated from suitable size
ironngle of35x35x3mm; painted with bestquality
epoxy coatingsin black and white bends. the details of 3711.75
symbol or inscription /numerals for each board shall
be as per the instruction ofengineer in charge. The
fixing at site shall be in 1:2:4 CCblockof size 45 x
x 60 Cms. for each leg includingexcavation, curing
etc.complete under the supervision ofengineer in
charge. A warranty for 7 years for the Retroreflective
sheeting from original manufacturer & a
18 662.10 Sq.mt. Road marking with hot applied thermoplastic paints
with reflectorising glass beads on bitumin surface
providing and laying a hot applied thermoplastic
compound 2.5 mm thick including reflectorising glass
beads @ 250gms per sqm area, thickness of 2.5mm is
excludingof surface applied glass beds as per IRC:35-
2015. The finished surface to be level, uniform and
free from streaks and holes. zebra patta /bump patta
lane/center line/ edge line/cut patta. The white color
marking should provide liminance coefficinet on
cemend road shalll be min 130 mcd/m2/lux and
Asphalt road shall be min 100 mcd/m2/lux during the
service lifeduring the day time. The marking should
meet the performance criteria for night time
reflectivity, wet reflectivity and skid resistance as
mentioned in the section-15 of IRC 35-2015.
Warranty for the Retro reflectivity should be two
Rs. One Corer Fourty Four Lack One Nine Thousand Four Hundred Eightteen and Paise Six Only.
I/We am/are willing to carry out the work at ________________ % above/below ( percent should be
written in figures and in words ) of the estimated rates mentioned above. Amount of my/our tender works out as under.
*Estimated amount *Estimated amount
put to tender Rs. 14419418.06 put to tender Rs.
Deduct ____ % below Rs. _________ Add ____ % above Rs. _________
Net Rs. _________ Total Rs. _________
*( Please strike out which ever is not applicable )
Note 1:- The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
Note 2 :- The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3:- GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4:- In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore
in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned
Signature of Bidder
Deputy Executive Engineer Executive Engineer
Panchayat (R&B) Sub Division Panchayat (R&B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GRs - SBD with Index_11zon (5).pdf
5. GR Performance Bond and Bitumen date.pdf
3. SOM and Monitoring Formats (Uploading attachment).pdf
2. ESMP Table and Protection Clause.pdf
1. Clauses-Terms and Conditions of Contract-B1-04.09.2017 (1).pdf
6. GR.pdf
Environment GR_11zon.pdf
Performance Bond and Bitumen date.pdf
05-GR.pdf
6.GR.pdf
Road Testing.pdf
1. PKG-5 Schedule-BOQ.pdf
3. PKG-F SBD.pdf
4. SPECIFICATION Pkg F.pdf
PKG -F FRONT PAGE.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].