| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-Finance NEAR GOVT U P SCHOOL PSARA 10 PADAMUGAL KAKKANAD KOCHI PADAMUGAL | KOCHI | ERNAKULAM | KERALA | 682030 | L1 | Accepted-Finance First lowest bidder | |
| 2 | L2₹38.9 L+₹19.4 L (99.9%)Rejected-Finance NULL | L2 | Rejected-Finance Agreement executed and site handed over to the contractor |
Tender Value
₹19.0 L
EMD Value
₹47,390
Closing Date
30 Apr 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Regional Investigation and Quality Control Laboratory, Kozhikode
KIIFB-INVESTIGATION WORK FOR THE IMPROVEMENTS TO ADIVARAM KELANMOOLA ROAD
2022_PWD_487784_1
D1/Tender-06/INV/KKD/2022 - 23
Open Tender
Civil Works - Others
Item Rate
60 days
Adivaram
Please refer Tender documents.
7 documents required · 7 mandatory
₹4,480
Yes
₹47,390
Yes
25 Jun 2022
23 Apr 2022
3 May 2022
23 Apr 2022
30 Apr 2022
23 Apr 2022
30 days
Amount
Soil Collection & Testing Observed data 1 Collection of sub-grade soil sample at 500m interval carefully by excavating pit of area 1.0*0.6m through overlying bituminous and granular layer or from subgrade of formation area as directed by the engineer in charge for laboratory test and filling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officer at site.
Observed Data 2 Conducting Soil Classification test, Modified proctor Test,and CBR test as per the IS Code guidelines and making report of one soil sample
Od26005/2017-2018: Data for inventory survey upto 12 meter wide road for survey work of collecting road inventories and recording in prescribed format attached based on chainage marking including marking chainage at 50m interval and taking details such as existing carriageway width,shoulder width, Type of shoulder ,width and location of approach road ,details of existing drains,culverts and bridges as given in the format attched,pavement conditions(details of potholes, raveling, fog seal,slurry seal edge damage etc)raod safety measures (details of road sign,crash barriers,guard stones,delineator post, hazard markers etc) and all other existing retaining structures in road,including documentation charges etc as per direction of the officers at site
56.13 Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations).
56.12.c Total station surveying and preparation of site plan - In hilly terrain For Road
56.12.b Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures. For Junctions
SubSoil investigation 56.1.a Mobilization including transportation of all necessary plant and equipments and materials for boring, field testing and sampling and demobilization after completing work-For Machine Boring
56.17.1 Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing. Bridge (5No)
56.2.a Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1 Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.5.a Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit -- In land
56.4 Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.7 Conducting standard penetration test in bore hole at any depth.
56.8 Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.6 Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.11.a Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.11.c Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos.(for 5 boreholes)
56.15.a Hydraulic(MFL,OFL,LWL,HTL,LTL) and velocity calculation of water body -River
56.14.a Cross Sectional details (longitudinal section along alignment of the culvert showing bed profile of the stream)-River
G S Infrastructure
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_700682.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .