| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.9 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED BEING L1 | |
| 2 | L2₹46.1 L+₹18,988 (0.41%)Rejected-AOC HOUSE NO 251 E BLOCK ADARSH NAGAR BALLABHGARH FARIDABAD PIN 121004 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121004 | L2 | Rejected-AOC OTHER THAN L1 | |
| 3 | L3₹48.0 L+₹2.1 L (4.60%)Rejected-AOC 303 MAHESH NANGIA 303 PRAGATI CHAMBERS RANJIT NAGAR COMMERCAIL COMPLEX RANJIT NAGAR COMMERCIAL COMPLEX | L3 | Rejected-AOC OTHER THAN L1 | |
| 4 | L4₹48.4 L+₹2.5 L (5.40%)Rejected-AOC | L4 | Rejected-AOC OTHER THAN L1 | |
| 5 | L5₹52.2 L+₹6.3 L (13.8%)Rejected-AOC | L5 | Rejected-AOC OTHER THAN L1 |
Tender Value
₹53 L
EMD Value
₹1.0 L
Closing Date
9 May 2020, 6:00 pmClosed
CWE(AF) Leh
CWE(AF) Leh
OUTSOURCING OF SERVICES FOR MANNING AND OPERATION OF WATER SUPPLY INSTALLATIONS AND HOT WATER BOILER INSTALLATIONS AT AF STN LEH
2020_MES_336622_1
81109/E8
Open Tender
Manpower Supply
Item Rate
330 days
LEH
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE (AF) Leh
₹1.0 L
Yes
11 Jun 2020
28 Mar 2020
11 May 2020
28 Mar 2020
9 May 2020
25 Apr 2020
Amount
Outsourcing of services for manning and operation of Main pump House & IB gate pump house for three shifts (round the clock) including sunday and holiday by deploying three skilled operator (One operator for 08 hrs in one shift) for operation of complete equipments / machinery i.e submersible pump sets, centrifugal pump sets & water treatment plants including distribution of water supply by operating the mandatory valves after treatment of water by operation of chlorination plant installed in the pump house complete all as specified and directed by Engineer-in-Charge. NOTES:- (i) Time for supply of water will be fixed by the department and same will be communicated to contractor by Engr in Charge. (ii) Water to be tested for residual chlorine before distribution to users and record of the same will be maintained for each test. (iii) Unserviceable state of any pump and plant installed at pump houses will be immediately intimated to department for timely rectification of the defect . (iv) The Operator deployed by the contractor must be of proper trade 10+2 pass having minimum 02 (Two) years experience/a person having 07 years experience in the relevant trade/Ex-serviceman of the relevant trade. (v) Chemical analysis of water sample of water pump collected from delivery side will be done by the contractors after six months from NABL certified Laboratory. Cost of chemical analysis deemed to the including in quoted rates.
Outsourcing of services for manning and operation of Domestic pump house and Pump House Near New Block Offrs Mess for three shifts (round the clock) including sunday and holiday by deploying three skilled operator (One operator for 08 hrs in one shift) for operation of complete equipments / machinery i.e submersible pump sets, centrifugal pump sets & water treatment plants including distribution of water supply by operating the mandatory valves after treatment of water by operation of chlorination plant installed in the pump house complete all as specified and directed by Engineer-in-Charge. NOTES:- (i) Time for supply of water will be fixed by the department and same will be communicated to contractor by Engr in Charge. (ii) Water to be tested for residual chlorine before distribution to users and record of the same will be maintained for each test. (iii) Unserviceable state of any pump and plant installed at pump houses will be immediately intimated to department for timely rectification of the defect . (iv) The Operator deployed by the contractor must be of proper trade 10+2 pass having minimum 02 (Two) years experience/a person having 07 years experience in the relevant trade/Ex-serviceman of the relevant trade. (v) Chemical analysis of water sample of water pump collected from delivery side will be done by the contractors after six months from NABL certified Laboratory. Cost of chemical analysis deemed to the including in quoted rates.
Outsourcing of services for manning and operation of 114 AHU pump house & BP-1 Pump house for two shifts including sunday and holiday by deploying two skilled operator (One operator for 08 hrs in one shift) for operation of complete equipments / machinery i.e submersible pump sets, centrifugal pump sets & water treatment plants including distribution of water supply by operating the mandatory valves after treatment of water by operation of chlorination plant installed in the pump house complete all as specified and directed by Engineer-in-Charge. NOTES:- (i) Time for supply of water will be fixed by the department and same will be communicated to contractor by Engr in Charge. (ii) Water to be tested for residual chlorine before distribution of water to users and record of the same will be maintained for each test. (iii) Unserviceable state of any pump and plant installed at pump houses will be immediately intimated to department for timely rectification of the defect . (iv) The Operator deployed by the contractor must be of proper trade10+2 pass having minimum 02 (Two) years experience/a person having 07 years experience in the relevant trade/Ex-serviceman of the relevant trade. (v) Chemical analysis of water sample of water pump collected from delivery side will be done by the contractors after six months from NABL certified Laboratory. Cost of chemical analysis deemed to the including in quoted rates.
Outsourcing of services for manning and operation of installation of Hot water Boiler No 01 for three shifts (round the clock) including sunday and holiday by deploying three skilled operator (One operator for 08 hrs in one shift) including de-scaling, de- carbonising of generator fortnightly with proper T & P required for maintenance, adjustment of safety devices, draining of pipeline/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladder complete all as specified and as per details given below :- (i) Hot water Boiler of Cap 100000Kcal/Hr of make THERMAX - 03 Nos. (ii) Boiler associated circulation pump set of capacity 2 HP - 03 Nos. (iii ) Booster pump set of capacity 5 HP - 01 No. (iv) LT panels and connected control switch gears. NOTES : (i) Fuel like Diesel and lubricants shall be issued under Sch'B' free for filling. (ii) The Operator deployed by the contractor must be of proper trade 10+2 pass having minimum 02 (Two) years experience/a person having 07 years experience in the relevant trade/Ex-serviceman of the relevant trade.
All as per Serial item No. 04 here in before but for one shift of 08 hours by deploying one skilled operator.
Outsourcing of services for manning and operation of installation of Hot water Boiler No 02 for two shifts by deploying two skilled Operators (One Operator in each shift of eight hours) including Sunday and Holiday including de-scaling ,de- carbonising of generator fortnightly with proper T &P required for maintenance, adjustment of safety devices, draining of pipeline/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladder complete all as specified and as per details given below :- (i) Hot water Boiler of Cap 100000Kcal/Hr - 02 Nos. (ii) Boiler associated circulation pump set of capacity 2 HP - 02 Nos. (iii ) Booster pump set of capacity 2 HP - 01 No. (iv) LT panels and connected control switch gears. NOTES : (i) Fuel like Diesel and lubricants shall be issued under Sch'B' free for filling. (ii) The Operator deployed by the contractor must be of proper trade 10+2 pass having minimum 02 (Two) years experience/a person having 07 years experience in the relevant trade/Ex-serviceman of the relevant trade.
All as per Serial item No. 06 here in before but for one shift of 08 hours by deploying one skilled operator.
Outsourcing of services for manning and operation of installation of Hot water Boiler No 03 and Hot water Boiler near 'DSC' & 'CPL and BELOW' Messes for three shifts (round the clock) including sunday and holiday by deploying three skilled operator (One operator for 08 hrs in one shift) including de-scaling, de- carbonising of generator fortnightly with proper T & P required for maintenance, adjustment of safety devices, draining of pipeline/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladder complete all as specified and as per details given below :- (i) Hot water Boiler of Cap 100000Kcal/Hr of Make : THERMAX/RAPID COOL - 07 Nos. (ii) Boiler associated circulation pump set of capacity 2 HP - 07 Nos. (iii ) Booster pump set of capacity 5 HP & 3 HP - 03 Nos. (iv) LT panels and connected control switch gears. NOTES : (i) Fuel like Diesel and lubricants shall be issued under Sch'B' free for filling. (ii) The Operator employed by the contractor must be of proper trade 10+2 pass having minimum 02 (Two) years experience/a person having 07 years experience in the relevant trade/Ex-serviceman of the relevant trade.
All as per Serial item No. 08 here in before but for one shift of 08 hours by deploying one skilled operator.
Outsourcing of services for manning and operation of installation of Tora Bora Boiler and New Block Boiler for two shifts including sunday and holidayby deploying two skilled operator (One operator for 08 hrs in one shift) including de-scaling, de- carbonising of generator fortnightly with proper T & P required for maintenance, adjustment of safety devices, draining of pipeline/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladder complete all as specified and as per details given below :- (i) Hot water Boiler of Cap 100000Kcal/Hr of Make : THERMAX/RAPID COOL - 05 Nos (03 Nos at Tora Bora and 02 Nos at New Block). (ii) Boiler associated circulation pump set of capacity 2 HP - 05 Nos. (iii ) Booster pump set of capacity 2 HP - 02 Nos. (iv) LT panels and connected control switch gears. NOTES : (i) Fuel like Diesel and lubricants shall be issued under Sch'B' free for filling. (ii) The Operator employed by the contractor must be of proper trade 10+2 pass having minimum 02 (Two) years experience/a person having 07 years experience in the relevant trade/Ex-serviceman of the relevant trade.
All as per Serial item No. 10 here in before but for one shift of 08 hours by deploying one skilled operator.
Outsourcing of services for manning and operation of installation of Boiler No. 04 for two shifts including sunday and holiday by deploying two skilled operator (One operator for 08 hrs in one shift) including de-scaling, de- carbonising of generator fortnightly with proper T & P required for maintenance, adjustment of safety devices, draining of pipeline/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladder complete all as specified and as per details given below :- (i) Hot water Boiler of Cap 100000Kcal/Hr of Make: RAPID COOL - 01 No (ii) Boiler associated circulation pump set of capacity 2 HP - 01 No. (iii ) Booster pump set of capacity 3 HP - 01 No. (iv) LT panels and connected control switch gears. NOTES : (i) Fuel like Diesel and lubricants shall be issued under Sch'B' free for filling. (ii) The Operator employed by the contractor must be of proper trade 10+2 pass having minimum 02 (Two) years experience/a person having 07 years experience in the relevant trade/Ex-serviceman of the relevant trade.
All as per Serial item No. 12 here in before but for one shift of 08 hours by deploying one skilled operator.
national engineering
Hitech Erectors Pvt. Ltd.
neelam construction co
singh traders
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .