| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | ₹3.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.7 LRejected-AOC | ₹3.7 L | L2 | Rejected-AOC NO |
| 3 | L3₹3.8 LRejected-AOC | ₹3.8 L | L3 | Rejected-AOC NO |
| 4 | L4₹5.7 LRejected-AOC VELLAPLACKAL HOUSE VARANDARAPPILLY PO THRISSUR 680303 | THRISSUR | THRISSUR | KERALA | 680303 | ₹5.7 L | L4 | Rejected-AOC NO |
| Sl No | Description | Qty | Unit | BINSON JOSEPH L4 | SAMEER V M L3 | SAJEESH P L2 | AJITHKUMAR S. L1 |
|---|---|---|---|---|---|---|---|
| 1.00Anthikkad LIS | |||||||
| 1.00 | OD247333/2025-2026: Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed. | 1 | job | 7,500 ₹7,500 | 7,500 ₹7,500 | 7,616.17 ₹7,616.17 | 7,252.12 ₹7,252.12 |
| 1.00 | OD247334/2025-2026:Fully Comprehensive Annual Maintenance of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 2 | job | 36,000 ₹72,000 | 26,000 ₹52,000 | 26,723.56 ₹53,447.12 | 25,446.17 ₹50,892.34 |
| 1.00 | OD68614/2025-2026:Dismantling the61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint. | 1 | each | 5,616 ₹5,616 | 5,616 ₹5,616 | 6,771.52 ₹6,771.52 | 6,447.84 ₹6,447.84 |
| 1.00 | OD68683/2025-2026:Dismantling the 61-110 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil, (in case of oil starters), refitting, resetting and making the starter in good working condition. | 1 | each | 6,300 ₹6,300 | 6,300 ₹6,300 | 3,907.09 ₹3,907.09 | 3,720.33 ₹3,720.33 |
| 1.00 | OD68615/2025-2026:Refitting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 6,300 ₹6,300 | 6,300 ₹6,300 | 6,535.86 ₹6,535.86 | 6,223.45 ₹6,223.45 |
| 1.01 | OD68682/2025-2026:Overhauling 61-110HP split case pump, dismantling the pump, overhauling the same, taking out the impeller shaft assembly, detaching impeller shaft assembly, reconditioning the impeller and shaft, reconditioning the worn-out shaft and impeller by welding, metaling, cutting, grinding if necessary and dynamically balancing including providing coupling bolt, replacing the bearing etc. refitting the same in pump. | 1 | each set | 7,000 ₹7,000 | 7,000 ₹7,000 | 9,240.94 ₹9,240.94 | 8,799.22 ₹8,799.22 |
| 2.00Azhimavu LIS | |||||||
| 2.00 | OD247382/2025-2026:Fully Comprehensive Annual Maintenance contract of 1-3 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed. | 1 | job | 5,800 ₹5,800 | 5,800 ₹5,800 | 6,037.31 ₹6,037.31 | 5,748.73 ₹5,748.73 |
| 2.00 | OD247383/2025-2026: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 1 | job | 4,200 ₹4,200 | 4,200 ₹4,200 | 18,827.63 ₹18,827.63 | 17,927.67 ₹17,927.67 |
Tender Value
₹3.6 L
EMD Value
₹8,919
Closing Date
28 Jan 2026, 6:00 pmClosed
Assistant Executive Engineer
Electrical Wing Irrigation Subdivision Chalakkudy
GENERAL AMC 2025 26 Anthikkad Azhimavu Ettumuna Thottanchira and Poothrakkal LIS Fully Comprehensive Annual Maintenance Contract for the year 2025 26 General Electrical Work
2026_Irrig_827554_17
C-ETN-JAN/EL/2025-26
Open Tender
Electrical Works
365 days
Chalakkudy
Please refer Tender documents.
10 documents required · 10 mandatory
₹790
₹8,919
4 Apr 2026
19 Jan 2026
30 Jan 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
Anthikkad LIS
OD247333/2025-2026: Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed.
OD247334/2025-2026:Fully Comprehensive Annual Maintenance of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD68614/2025-2026:Dismantling the61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD68683/2025-2026:Dismantling the 61-110 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil, (in case of oil starters), refitting, resetting and making the starter in good working condition.
OD68615/2025-2026:Refitting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD68682/2025-2026:Overhauling 61-110HP split case pump, dismantling the pump, overhauling the same, taking out the impeller shaft assembly, detaching impeller shaft assembly, reconditioning the impeller and shaft, reconditioning the worn-out shaft and impeller by welding, metaling, cutting, grinding if necessary and dynamically balancing including providing coupling bolt, replacing the bearing etc. refitting the same in pump.
Azhimavu LIS
OD247382/2025-2026:Fully Comprehensive Annual Maintenance contract of 1-3 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed.
OD247383/2025-2026: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD68733/2025-2026:Dismantling the 11-30 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil, (in case of oil starters), refitting, resetting and making the starter in good working condition.
OD86347/2025-2026:Overhauling 11-30HP split case pump, dismantling the pump, overhauling the same, taking out the impeller shaft assembly, detaching impeller shaft assembly, reconditioning the impeller and shaft, reconditioning the worn-out shaft and impeller by welding, metaling, cutting, grinding if necessary and dynamically balancing including providing coupling bolt, replacing the bearing etc. refitting the same in pump.
Ettumuna LIS
OD247387/2025-2026: Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed.
OD247388/2025-2026: Fully Comprehensive Annual Maintenance of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD258406/2025-2026:Dismantling the 31-60 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil,(in case of oil starters ), refitting, resetting and making the starter in good working condition.
OD86365/2025-2026:Overhauling 31-60 HP end suction pump, dismantling the pump, overhauling the same, taking out the impeller shaft assembly, detaching impeller shaft assembly, reconditioning the impeller and shaft, reconditioning the worn-out shaft and impeller by welding, metaling, cutting, grinding if necessary and dynamically balancing including providing coupling bolt, replacing the bearing etc. refitting the same in pump.
Thottanchira LIS
OD69280/2025-2026:Dismantling the 1-3 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD69281/2025-2026:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD69284/2025-2026:Dismantling the 31-60 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil, (in case of oil starters), refitting, resetting and making the starter in good working condition.
OD69282/2025-2026: Refitting upto 1-3 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD69283/2025-2026: Refitting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Poothrakkal LIS
OD247390/2025-2026: Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed.
OD247391/2025-2026:Fully Comprehensive Annual Maintenance of 61-110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories ,panel board etc including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed.
OD247401/2025-2026:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD69331/2025-2026:Dismantling the 31-60 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil, (in case of oil starters), refitting, resetting and making the starter in good working condition.
OD69329/2025-2026: Refitting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD86373/2025-2026:Overhauling 31-60HP split case pump, dismantling the pump, overhauling the same, taking out the impeller shaft assembly, detaching impeller shaft assembly, reconditioning the impeller and shaft, reconditioning the worn-out shaft and impeller by welding, metaling, cutting, grinding if necessary and dynamically balancing including providing coupling bolt, replacing the bearing etc. refitting the same in pump.
Common Items
OD69356/2025-2026: Replacing old bearing and supply new bearing bearing no 6313 SKF/FAG OR equivalent
OD69357/2025-2026: Replacing old bearing and supply new bearing bearing no 6312 SKF/FAG OR equivalent
OD258414/2025-2026:Replacing old bearing and supply new bearing bearing no 6314 SKF/FAG OR equivalent
OD69359/2025-2026: Replacing old bearing and supply new bearing bearing no 6309 SKF/FAG OR equivalent
OD91582/2025-2026: Replacing old bearing and supply new bearing bearing no 6209 SKF/FAG OR equivalent
OD258415/2025-2026:Charges for rewinding the burnt rotor/stator - separate motor in to stator and rotor, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new stator/rotor lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running.
OD87198/2025-2026:Conveyance charge of 20-120 HP motor / pump / panel board / starter board etc pump house to workshop and bring back to pump house.
OD69363/2025-2026:Supply , Conveyance and fitting 200/250 A, HRC Fuse Base with suitable HRC Fuse
OD258418/2025-2026:S & F CURRENT TRANSFORMER -CURRENT TRANSFORMER - 150/5 A, 5 VA, accuracy class 1, Tape wound Metering CT
OD258419/2025-2026:Supply ,fixing and installation of Three Phase Ammeter accuracy class 1-digital type
OD258421/2025-2026:Supply and fixing LED indicators for all voltage ranges - Red, Green, Black, Yellow or Orange Color.
OD258424/2025-2026:Supply and fixing single phasing preventer SM 301 GIC/ L&T or equivalent and giving connections as required
OD255902/2025-2026:Supply , Conveyance and fitting 125/160 A, 2 Way neutral links in the existing Meter box.
90.14.24.3:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.3 KVAr, 3 phase, 440 V, delta connected standard duty Metalised Poly Propylene Capacitor, Cylinderical Type suitable for direct connection to motors.
90.14.24.5:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.5 KVAr, 3 phase, 440 V, delta connected standard duty Metalised Poly Propylene Cylinderical Type Capacitor suitable for direct connection to motors.
90.14.24.7:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.7.5 KVAr, 3 phase, 440 V, delta connected standard duty Metalised Poly Propylene Cylinderical Type Capacitor suitable for direct connection to motors.
90.3.21.3:Supply & installation of light fittings on 'C/U' shaped flat iron bracket Supply, conveyance, installation, testing and commissioning the light fittings of following types made from 0.5mm CRCA sheet complete with all accessories and lamps etc. directly on wall using 2 nos. 'C/U' brackets made from 20 x 3 mm MS flat, painting the flat iron bracket and giving connections with required length of 16/0.20mm 3 core copper conductor flex wire conforming to relevant ISS or extending the original wiring and giving connection etc. as required.1200 mm 1X20W LED Lamp with box type fixture
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1389594.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 0.47 MB
BOQ_1389594.xls
BOQ • 0.34 MB
Anthikkad11611NITSBDmerged.pdf
Tender Documents • 1.66 MB
Download all tender documents and submit your bid