Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,300
Closing Date
15 Jun 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Soil and Water Conservation office Baramu
District Soil and Water Conservation office Baramulla Bandipora
UP-GRADATION OF WATER BODY UNDER UT CAPEX BUDGET AT (CHECKI GUJRI RAFIABAD Dist. Baramulla
2022_SWCD_171808_15
ENIT NO 02 OF 2022-23 DATED 01/06/2022
Open Tender
Civil Works
Item Rate
30 days
UP-GRADATION OF WATER BODY UNDER UT CAPEX BUDGET A
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
District Soil and Water Conservation office Baramu
₹12,300
Yes
16 Jun 2022
1 Jun 2022
16 Jun 2022
1 Jun 2022
15 Jun 2022
1 Jun 2022
30 days
UP-GRADATION OF WATER BODY UNDER UT CAPEX BUDGET AT (CHECKI GUJRI RAFIABAD) Dist. Baramulla
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead up to 50 meters and lift up to 1.5 m, as directed by Engineer-in-Charge. 1x 40’-0”x30’-0”x(4’-0”+6’-0”)/2=6000 cft or 169.92cum All kind of soils @ 85%= 144.43cum
Ordinary rock @ 15% = 25.48cum
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift up to 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil 1m from cutting edge 2x(40’-0”+22’-0”)x 4’-0”x 3’-0”= 1488cft or 42.14cum
Providing and laying soling stone in horizontal including ramming ,watering but excluding cost of stones complete Qtty vide (2) = 496sft x 6”= 248cft Bed = 33’-0”x23’-0” x6”= 379.5cft Cistern= 2x6’-0”x6’-0”x6”=36cft = 8’-0”x8’-0”x6”= 32cft 695.5cft or 19.69 cum
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with a) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Qtty vide (3) = 1391sft x 4” = 459.03cft or 13.00 cum
b) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) 2x2x(6’-0”+3’-0”)x1’-6”x1’-6”= 81cft 2x(8’-0”+5’-0”)x1’-6”x2’-0”= 78cft T= 159cft or 4.50cum
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns 2x4x(6’-0”+3’-0”)x1’-6”=108sft 4x(8’-0”+5’-0”)x2’-0”= 104sft T= 212sft or 9.70sqm
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level andcuring complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand using nallah stones( kuccha/pacca) 2x(40’-0”+27’-0”)x (3’-6”x 1’-6”)/2x7’-6”= 2512.5cft or 71.15cum @ 40% = 28.46cum Steps 8x 8’-0”x 1’-0”x1’-0”= 64cft or 1.81cum T = 30.27cum
Dry random rubble masonry with hard stone in foundation and plinth: With bond stone Qtty vide (2)= 71.15cum @ 60% = 42.69cum
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete 2x(40’-0”+27’-0”)x 1’-6”= 201sft or 8.68sqm (33’-0”x23’-0”) =759sft or 70.53sqm Steps = 8’-0”x8’-0’= 64sft or 5.94sqm , Cistern =2x3’-0”x3’-0”= 9sft or 0.83sqm = 1x5’-0”x5’-0”= 25sft or 2.32sqm T = 88.3sqm
Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 100 mm dia. nominal bore(15mtr )
Carriage of different materials from source to site of work a)sand/ bajri average lead of 28km by MT & 200m HL Qtty vide (4,6,8,) = (13+4.5+30.27+88.3)= 37.14 cum
b) stone average 35km by MT & 200m HL Qtty vide (3,6,7)=90.84cum
c) cement average 8km by MT & 200m HL Qtty vide (4,6,8)= (2210+1440+2497.27+1412.8)kg = 7560.07kg or 7.56MT
ABDUL LATIEF NAIKOO
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .