| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.1 L+₹1.1 L (22.9%)Admitted-Fee/PreQual/Technical/Finance | ₹6.1 L+₹1.1 L (22.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Anoop AJ L2 | SANTHANU A S L1 |
|---|---|---|---|---|---|
| 1.00LAYING SEWER LINE | |||||
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.4 | cum | 2,222.95 ₹3,112.13 | 1,800.4 ₹2,520.56 Lowest |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 4.48 | cum | 1,881.07 ₹8,427.19 | 1,523.9 ₹6,827.07 Lowest |
| 1.00 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 7 | sqm | 120.32 ₹842.24 | 97.3 ₹681.1 Lowest |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 62.4 | cum | 598.98 ₹37,376.35 | 485.1 ₹30,270.24 Lowest |
| 1.00 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 16 | cum | 714.69 ₹11,435.04 | 578.9 ₹9,262.4 Lowest |
| 1.01 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 80 | metre | 28.29 ₹2,263.2 | 23.1 ₹1,848 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.4 | cum | 8,157.21 ₹11,420.09 | 6,610.1 ₹9,254.14 Lowest |
| 1.01 | OD13646/2025-2026:Providing protection works to the Electric post by using 3 no. of Kattadi poles and removing the same after completion of work | 2 | no | 488.87 ₹977.74 | 395.5 ₹791 Lowest |
| 1.01 | OD328207/2025-2026:Providing Steel Sheet shoring to the sides of the trenches to depths of ABOVE 2 M But Not exceeding 4 M using 6mm M>S Sheet 0.5m wide stiffen on edges with 50mm x50mmx6mm M.S angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.50m above ground level suitably braced by horizontal walling pieces at 75MMX125MMx 8MM angles on either side at intervals not exceeding 1.5M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed ,dismantling,cleaning restacking for reuse including all labour,hire charges and conveyance for equipments ,tools and plants and sundries etc .complete. | 20 | sqm | 507.44 ₹10,148.8 | 410.9 ₹8,218 Lowest |
Tender Value
₹7.1 L
EMD Value
₹17,651
Closing Date
26 Jun 2026, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer,Sewerage Sub Division, Kuriathy.
Deposit work of TVPM corporation TSS Providing connection to TVPM Corporation building RRF waste disposal unit and Yachaka Punaradhivasa kendram at Kalladimugham under sewerage section 1 706048
2026_KWA_856881_1
WRD/KWA-CE(SR)/TR/9583/2025
Open Tender
Civil Works - Others
Item Rate
120 days
Sewerage Sub Division, Kuriathy
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,560
₹17,651
Yes
30 Jun 2026
20 Jun 2026
27 Jun 2026
20 Jun 2026
26 Jun 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1LAYING SEWER LINE | |||||
| 1.001 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | cum | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.003 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | - | sqm | - | - |
| 1.004 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1 | cum | - | - |
| 1.005 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | - | - |
| 1.006 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | - | - |
| 1.007 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.008 | OD13646/2025-2026:Providing protection works to the Electric post by using 3 no. of Kattadi poles and removing the same after completion of work | - | no | - | - |
| 1.009 | OD328207/2025-2026:Providing Steel Sheet shoring to the sides of the trenches to depths of ABOVE 2 M But Not exceeding 4 M using 6mm M>S Sheet 0.5m wide stiffen on edges with 50mm x50mmx6mm M.S angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.50m above ground level suitably braced by horizontal walling pieces at 75MMX125MMx 8MM angles on either side at intervals not exceeding 1.5M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed ,dismantling,cleaning restacking for reuse including all labour,hire charges and conveyance for equipments ,tools and plants and sundries etc .complete. | - | sqm | - | - |
stage.html
html • 0.02 MB
finance_1448323.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.47 MB
NITrrf.pdf
Tender Documents • 0.88 MB
BOQ_1448323.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .