| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.2 LAccepted-Finance | 1 | Accepted-Finance BoQ found in order | |
| 2 | 2₹7.5 L+₹1.3 L (21.3%)Accepted-Finance | 2 | Accepted-Finance BoQ found in order | |
| 3 | Not Admitted-Fee/PreQual/Technical 2ND FLOOR MIR MALL SMC ROAD OPPOSITE DISTRICT POLICE LINES KARAN NAGAR SRINAGAR JAMMU AND KASHMIR SRINAGAR JAMMU KASHMIR 190010 | SRINAGAR | JAMMU AND KASHMIR | 190010 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.8 L
EMD Value
₹17,600
Closing Date
8 Aug 2024, 4:00 pmClosed
Vice Chancellor
Central University of Kashmir, Ganderbal-191201
Raising/repairing of existing boundary wall alongwith barbed wire at Arts Campus Ganderbal
2024_CUoK_818382_1
NIT-04-2024-Arts-Campus-Wall
Open Tender
Civil Works
Works
40 days
CUK Campus
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Central University of Kashmir
₹17,600
Yes
CUK Campus, Ganderbal
13 Jan 2025
26 Jul 2024
12 Aug 2024
26 Jul 2024
8 Aug 2024
26 Jul 2024
26 Jul 2024 - 31 Jul 2024
1 Aug 2024
Amount
Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in superstructure above plinth level up to floor V level inall shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.Cement mortar 1:3 (1 cement :3 coarse sand)
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
Structural steel work riveted, bolted or welded in built up sections, trussesand framed work, including cutting, hoisting, fixing in position andapplying a priming coat of approved steel primer all complete.
Pointing on stone work with cement mortar 1:3 (1 cement : 3 finesand) :Flush/ Ruled pointing
Pointing on brick work or brick flooring with cement mortar 1:3(1 cement : 3 fine sand): Flush / Ruled/ Struck or weathered pointing
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
M/S MALIK CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .