| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | L1 | Accepted-AOC Accepted |
Tender Value
₹7.1 L
EMD Value
₹17,900
Closing Date
30 Nov 2019, 5:00 pmClosed
Assistant Executive Engineer,KIP RB Sub Dn.No,26 K
Assistant Executive Engineer,KIP RB Sub Dn.No,26 Karunagappally
Rectification of Canal
2019_Irrig_305416_2
41/AEE/KIP/KPY/2019-20
Open Tender
Civil Works - Canal
Item Rate
120 days
Vallikunnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,600
Yes
online
₹17,900
Yes
14 May 2020
11 Nov 2019
2 Dec 2019
11 Nov 2019
30 Nov 2019
11 Nov 2019
Amount
Scheme :1 Rectification work of Karunagappally branch canal between chainage 5000 M and 5050 M
od37712/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desiltingas per the direction of the departmental officers at site
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od37713/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od37714/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.as per the direction of the departmental officers at site
Scheme :2 Rectification work of Karunagappally branch canal between chainage 5050 M and 5100 M
od37712/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desiltingas per the direction of the departmental officers at site
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od37713/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od37714/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.as per the direction of the departmental officers at site
Scheme :3 Rectification work of Karunagappally branch canal between chainage 5100 M and 5150 M
od37712/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desiltingas per the direction of the departmental officers at site
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od37713/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od37714/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.as per the direction of the departmental officers at site
Scheme :4 Rectification work of Karunagappally branch canal between chainage 5150 M and 5190 M
od37712/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50m and lift up to 1.50m, disposed soil to be levelled and neatly dessed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od37713/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od37714/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme :5 Rectification work of Karunagappally branch canal between chainage 5190 M and 5240 M ( Flume)
15.56 : Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site
13.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointingas per the direction of the departmental officers at site
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Scheme :6 Rectification work of Karunagappally branch canal between chainage 5190 M and 5215 M ( Side Drain)
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soilas per the direction of the departmental officers at site
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site
Scheme :7 Rectification work of Karunagappally branch canal between chainage 5215 M and 5240 M ( Side Drain)
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)as per the direction of the departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site
Bidder Name
V. KRISHNANKUTTY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_440781.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .