Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC CHOCHUPARAMBIL ERATTUPETTA | IDUKKI | KERALA | 685501 | ₹4.4 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹5.0 LRejected-Finance | ₹5.0 L | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹5.4 LRejected-Finance | ₹5.4 L | L3 | Rejected-Finance L3 bidder |
| 4 | L4₹5.7 LRejected-Finance 8 497 E J ARCADE VELUR KIRALUR THRISSUR 680601 | THRISSUR | THRISSUR | KERALA | 680601 | ₹5.7 L | L4 | Rejected-Finance L4 bidder |
| Sl No | Description | Qty | Unit | CITIZENS LABOUR FORCES DEVELOPMENT CO-OPERATIVE SICIETY Ltd No T-2185 L3 | ROHIT KRISHNAN L2 | NIGEL E T L4 | SHAHUL HAMEED L1 |
|---|---|---|---|---|---|---|---|
| 1.00Clearing Jungle | |||||||
| 1.01 | OD372728/2025-2026: Clearing light jungle including cutting and removing shrubs and small trees / plants of girth upto 20cm uprooting and removing roots of trees, cutting, stacking twigs/fire wood within a distance of 100m, removing all other waste materials from site and dumping at contractors own premises etc. including all hire charges of machineries, labour charges, etc complete as per the direction of Engineer in charge. | 87,735.85 | sqm | 6 ₹5.3 L | 5.52 ₹4.8 L | 6 ₹5.3 L | 4.83 ₹4.2 L |
| 1.02 | 50.2.33.5: Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 10 | each | 200 ₹2,000 | 375 ₹3,750 | 2,000 ₹20,000 | 339.28 ₹3,392.81 |
| 1.03 | 50.2.33.6: Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 300 ₹1,500 | 650 ₹3,250 | 1,950 ₹9,750 | 607.3 ₹3,036.50 |
| 1.04 | 2.33.1: Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth up to and including 60 cm girth. | 5 | each | 400 ₹2,000 | 550 ₹2,750 | 2,500 ₹12,500 | 494.84 ₹2,474.19 |
| 1.05 | 2.33.2: Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth up to and including 120 cm girth. | 2 | each | 2,000 ₹4,000 | 2,500 ₹5,000 | 1,500 ₹3,000 | 2,204.96 ₹4,409.92 |
Tender Value
₹5.3 L
EMD Value
₹13,220
Closing Date
7 Apr 2026, 3:00 pmClosed
Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Clearing Jungle
2026_SKF_847625_2
584/SKF/CE/2025-26
Open Tender
Civil Works - Others
180 days
Thiruvananthapuram
Please refer tender document
6 documents required · 6 mandatory
₹1,251
₹13,220
11 May 2026
27 Mar 2026
8 Apr 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing Jungle | |||||
| 1.01 | OD372728/2025-2026: Clearing light jungle including cutting and removing shrubs and small trees / plants of girth upto 20cm uprooting and removing roots of trees, cutting, stacking twigs/fire wood within a distance of 100m, removing all other waste materials from site and dumping at contractors own premises etc. including all hire charges of machineries, labour charges, etc complete as per the direction of Engineer in charge. | - | sqm | - | - |
| 1.02 | 50.2.33.5: Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.03 | 50.2.33.6: Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.04 | 2.33.1: Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth up to and including 60 cm girth. | - | each | - | - |
| 1.05 | 2.33.2: Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth up to and including 120 cm girth. | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1433396.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tenderdoc.pdf
Tender Documents • 1.37 MB
BOQ_1433396.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid