| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.2 LAccepted-AOC KUTTILAVALAPPIL HOUSE KIZHIKKARA OTHALLUR P O MALAPPURAM 679591 | MALAPPURAM | MALAPPURAM | KERALA | 679591 | 1 | Accepted-AOC aoc | |
| 2 | Rejected-Technical | - | Rejected-Technical 2 | |
| 3 | Rejected-Technical | - | Rejected-Technical 3 |
Tender Value
₹13.0 L
EMD Value
₹32,571
Closing Date
28 Dec 2023, 9:00 amClosed
Assistant Engineer
Assistant Engineer
Annual Plan PRO.NO 122 Construction of VCB in ward 17 Alamkode GP-PERUMPADAPPU BP
2023_LSGD_632133_3
01/etender/lsgd/pdp/2023-2024
Open Tender
Civil Works - Others
Item Rate
180 days
Perumpadappu
refer tender documents
8 documents required · 8 mandatory
₹2,760
Yes
₹32,571
Yes
9 Feb 2024
19 Dec 2023
30 Dec 2023
19 Dec 2023
28 Dec 2023
19 Dec 2023
Amount
VCB Construction
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD195072/2023-2024:Supplying and fixing frp channels of c profile and sill beam size 1x1x1m with f;lange 50 to 75mm depth in the grooves already arranged and as per direction of department officers
OD195074/2023-2024:Supplying and fixing frp shutters pof suitable size to withstand design and maximum water pressure as prescribed by departmental officers and installing FrP channels provided in the groove already arranged and as per direction of departmental officers
ANILKUMAR P K
NANDAKUMAR U V
Bidder Name
NANDAKUMAR U V
ANILKUMAR P K
RAFEEQUE K A
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_959810.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .