X.En. (RMC) Div.-I, CAD Chambal, Kota
X.En. (RMC) Div.-I, CAD Chambal, Kota
Excavation/Desilting construction of VRBS and Drainage System in Kishanpura Sub Branch in Sub Division Kota
2026_CADKO_557865_1
NIT 02/2026-27/343-60
Open Tender
Miscellaneous Works
Fixed-rate
365 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
X.En. (RMC) Div.-I, CAD Chambal, Kota
₹53,855
Yes
18 May 2026
9 May 2026
20 May 2026
9 May 2026
19 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.(a) ordinary . | 49,150 | /Sqm | 1.45 | ₹71,267.5 |
| 2 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required. | 23.92 | /sqm | 489 | ₹11,696.88 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. .(C) Hard soil mixed with Kankar / boulders, Morrum | 44.4 | /Cum | 99 | ₹4,395.6 |
| 4 | Removal of slit/soil/earth, sand, pebbles, 'Malba', debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect (c)For depth above 30 cms having (d) Extra on item 7(c) only if silt clearance is done under water and mud (WRD BSR 2023 CH. V Item no. 7 (c)(d) ) | 6,163.5 | /Cum | 93 | ₹5,73,205.5 |
| 5 | Dumpers 7-10 tonne capacity | 15 | /Day | 1,291.4 | ₹19,371 |
| 6 | upto 0.40 cum | 105 | /Hrs. | 504.4 | ₹52,962 |
| 7 | above 0.40 & upto 0.75cum | 40 | /Hrs. | 807.1 | ₹32,284 |
| 8 | Cost of Diesel | 1,752.5 | /Lit | 90.5 | ₹1,58,601.25 |
| 9 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto. (d) 20 mm | 20.55 | /Cum | 4,654 | ₹95,639.7 |
| 10 | Side shuttering including propping etc. complete (to achieve finish F 2) for : (c) Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 795.68 | /Sqm | 220 | ₹1,75,049.6 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.42 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.58 MB
BOQ_993170.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .