Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
7 Oct 2026, 6:00 pm
District Soil Conservation Officer
Raika Narwal Jammu
Soil and Water Conservation Work at Dharamsal Co 09 and 10, Tehsil Bari Brahmna District Samba
2026_SWCD_325557_3
eNIT No 01 of 2026-27 Dated 22.09.2026
Open Tender
Civil Works
Percentage
30 days
Soil and Water Conservation Work at Dharamsal
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Assistant Engineer (Agri), SWCD
₹4,000
22 Sept 2026
22 Sept 2026
8 Oct 2026
22 Sept 2026
7 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Renovation of Fencing | |||||
| 1.01 | Renovation of Fencing by way of removal of old damaged fence posts and barbed wire damaged and fixed new one in their place. The rates includes all material cost and labour charges for renovatiion of fencing etc | 2,130 | Cum | 26.32 | ₹56,061.6 |
| 2Construction of Percolation Pits | |||||
| 2.01 | Clearing jungle including uprooting of rank vegetation grass, brushwood, trees and saplings of girth upto 30 cm measured at height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared | 62.82 | 100sqm | 12.49 | ₹784.62 |
| 2.02 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge. (70%All kind of soil) | 81.7 | Cum | 479.3 | ₹39,158.81 |
| 2.03 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge. (30% Ordinary Rock) | 34.7 | Cum | 924.8 | ₹32,090.56 |
| 3Construction of Live Crib Structure | |||||
| 3.01 | Construction of live crib structures for control of soil erosion with a dimension of 10 feet length x 4 feet breadth x 4 feet height inclusive of all operations as per norm ( the rate includes cost of 6 No live suitable poles of 8 feet length and average mid girth of 9" to 10") to be fixed 2 feet deep in soil and 6 No willow or any other suitable plant species poles(10 feet long with average mid girth of 12' to 16" for horizontal crossing 3 Nos in each side), filling of 50 No earth filled gunny bags and planting of cutting of live brush wood material as per norms | 9 | Nos | 8,000 | ₹72,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 0.57 MB
BOQ_1100489.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .