Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹66.9 L+₹1.6 L (2.44%)Admitted-Fee/PreQual/Technical/Finance KERALA KL | ALAPPUZHA | KERALA | 688548 | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹67.3 L+₹2.0 L (3.05%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹68.4 L+₹3.1 L (4.68%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹69.2 L+₹3.9 L (5.93%)Admitted-Fee/PreQual/Technical/Finance CHEKKAKONAM P O THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | AZHICODE LABOUR CONTRACT CO-OPERATIVE SOCIETY T 1544 L5 | SAMRIDHI STRUCTURES L6 | Y SANTHOSHKUMAR L7 | ANOOP R L1 | MAHABIN SAIT L4 | K. SUNIL DUTH L3 | SELVARAJ L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00specification | ||||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 102.13 | cum | 319.4 ₹32,620.96 | 300 ₹30,639.6 Lowest | 323.59 ₹33,048.89 | 301.53 ₹30,795.86 | 352 ₹35,950.46 | 310.72 ₹31,734.46 | 308.88 ₹31,546.53 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 14.97 | cum | 7,043.63 ₹1,05,414.97 | 7,300 ₹1,09,251.8 | 7,136.08 ₹1,06,798.57 | 6,649.53 ₹99,516.87 Lowest | 6,974 ₹1,04,372.88 | 6,852.26 ₹1,02,550.92 | 6,811.71 ₹1,01,944.05 |
| 1.00 | 50.6.1.7:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15 cm in : CM 1:6 ( 1 cement : 6 coarse sand ) etc complete | 6.32 | cum | 5,984.55 ₹37,810.39 | 5,900 ₹37,276.2 | 6,063.09 ₹38,306.6 | 5,649.7 ₹35,694.8 Lowest | 5,889 ₹37,206.7 | 5,821.95 ₹36,783.08 | 5,787.5 ₹36,565.43 |
| 1.00 | OD191343/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:-
All work upto plinth level | 31.08 | cum | 9,788.74 ₹3,04,273.19 | 9,700 ₹3,01,514.8 | 9,917.21 ₹3,08,266.56 | 9,241.04 ₹2,87,248.49 Lowest | 9,712 ₹3,01,887.81 | 9,522.78 ₹2,96,006.09 | 9,466.43 ₹2,94,254.51 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 85.76 | cum | 282.77 ₹24,250.36 | 250 ₹21,440 Lowest | 286.48 ₹24,568.52 | 266.95 ₹22,893.63 | 280 ₹24,012.8 | 275.09 ₹23,591.72 | 273.46 ₹23,451.93 |
| 1.01 | OD191345/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge.
All work above plinth level upto floor V level | 85.24 | cum | 11,595.17 ₹9,88,395.48 | 11,700 ₹9,97,331.4 | 11,747.35 ₹10,01,367.61 | 10,946.39 ₹9,33,092.18 Lowest | 11,481 ₹9,78,663.4 | 11,280.12 ₹9,61,539.99 | 11,213.38 ₹9,55,850.94 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 130.16 | sqm | 342.87 ₹44,627.96 | 350 ₹45,556 | 347.37 ₹45,213.68 | 323.69 ₹42,131.49 Lowest | 344 ₹44,775.04 | 333.56 ₹43,416.17 | 331.58 ₹43,158.45 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 322.82 | sqm | 853.49 ₹2,75,520.23 | 880 ₹2,84,078.08 | 864.69 ₹2,79,135.77 | 805.73 ₹2,60,102.54 Lowest | 850 ₹2,74,393.6 | 830.3 ₹2,68,034.12 | 825.38 ₹2,66,445.87 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 229.62 | sqm | 677.37 ₹1,55,536.34 | 700 ₹1,60,732.6 | 686.26 ₹1,57,577.65 | 639.47 ₹1,46,833.82 Lowest | 670 ₹1,53,844.06 | 658.96 ₹1,51,309.08 | 655.07 ₹1,50,415.86 |
Tender Value
₹79.7 L
EMD Value
₹50,000
Closing Date
30 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD Buildings Division Thiruvananthapuram
General-Construction ofm new building for Govt LPS Punkummoodu Civil work
2026_PWD_881418_1
TR/19896/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
365 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
3 Nov 2026
22 Oct 2026
3 Nov 2026
22 Oct 2026
30 Oct 2026
22 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1specification | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 102.13 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 14.97 | cum | - | - |
| 1.003 | 50.6.1.7:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15 cm in : CM 1:6 ( 1 cement : 6 coarse sand ) etc complete | 6.32 | cum | - | - |
| 1.004 | OD191343/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:-
All work upto plinth level | 31.08 | cum | - | - |
| 1.005 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 85.76 | cum | - | - |
| 1.006 | OD191345/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge.
All work above plinth level upto floor V level | 85.24 | cum | - | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 130.16 | sqm | - | - |
| 1.008 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 322.82 | sqm | - | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 229.62 | sqm | - | - |
stage.html
html • 0.03 MB
finance_1499818.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.64 MB
TenderDocuments.pdf
Tender Documents • 1.13 MB
BOQ_1499818.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .