Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.3 LAccepted-AOC GOA | 1 | Accepted-AOC Lowest 1 | |
| 2 | 2₹10.0 L−₹83.4 L (89.3%)Rejected-Finance 54 B BAMONSAI SANGUEM SOUTH GOA 403 704 | SOUTH GOA | GOA | 403704 | 2 | Rejected-Finance Lowest L2 | |
| 3 | 3₹10.8 L−₹82.6 L (88.4%)Rejected-Finance H NO 502 D LIMA WADDO ARADI SOCCORRO PORVORIM BARDEZ GOA | NORTH GOA | GOA | 403001 | 3 | Rejected-Finance Lowest L3 |
| Sl No | Description | Qty | Unit | M/S F & F CONSTRUCTIONS L2 | LAXMAN S. NAIK L1 | KILLEDAR ASSOCIATES L3 |
|---|---|---|---|---|---|---|
| 1.10 | Disconnecting the cables, decoupling the motor, removing the foundation bolts, lifting the motor from the base, shifting and loading in the vehicle, fixing it back after repairs & connecting it back.a)170 HP motor at Naikaband | 2 | Job | 46,350 ₹92,700 | 43,200 ₹86,400 | 10,000 ₹20,000 Lowest |
| 1.20 | b)100 HP motor at Pump House No.2, Valkini | 1 | Job | 20,600 ₹20,600 | 19,200 ₹19,200 | 10,000 ₹10,000 Lowest |
| 2.10 | Dismantling the motor at works, inspecting the motor, removing the burnt windings, rewinding the stator with super enameled copper wire Class F 180 as per IS specification, incorporating RTD's, baking, varnishing & assembling with new bearings.a)170 HP motor at Naikaband | 2 | Job | 1,57,590 ₹3,15,180 | 1,46,880 ₹2,93,760 Lowest | 1,50,000 ₹3,00,000 |
| 2.20 | b)100 HP motor at Pump House No.2, Valkini | 1 | Job | 87,550 ₹87,550 | 81,600 ₹81,600 Lowest | 1,40,000 ₹1,40,000 |
| 3.10 | Supply & fixing of bearings a)170 HP motor at Naikaband 6319 | 2 | Nos | 29,808.2 ₹59,616.4 | 27,782 ₹55,564 Lowest | 35,000 ₹70,000 |
| 3.20 | b)170 HP motor at Naikaband NU 319 | 2 | Nos | 31,363.5 ₹62,727 | 29,232 ₹58,464 Lowest | 35,000 ₹70,000 |
| 3.30 | c)100 HP motor at Pump House No.2, 6316 | 1 | Nos | 8,549 ₹8,549 | 7,968 ₹7,968 Lowest | 25,000 ₹25,000 |
| 3.40 | d)100 HP motor at Pump House No.2, NU 316 | 1 | Nos | 21,630 ₹21,630 | 20,160 ₹20,160 Lowest | 25,000 ₹25,000 |
| 4.10 | Supply & fixing of Space Heaters and connecting it with the panel with provision of cut off when the motor is in operation.
a)170 HP motor at Naikaband | 2 | Job | 10,300 ₹20,600 | 9,600 ₹19,200 Lowest | 22,000 ₹44,000 |
| 4.20 | b)100 HP motor at Pump House No.2, Valkini | 1 | Job | 10,300 ₹10,300 | 9,600 ₹9,600 Lowest | 18,000 ₹18,000 |
Tender Value
₹9.7 L
EMD Value
₹19,342
Closing Date
8 Sept 2025, 4:00 pmClosed
Executive Engineer WDX WRD
Works Division X ,WRD, Pajimol Sanguem Goa
Maintenance of motors at Lift Irrigation Schemes at Naikaband and Valkini PH no.2 regarding..Rewinding of 125 KW/170 HP, Kirloskar Brothers Pvt. Ltd make and 100HP, 3 Phase, 75KW, L.T. induction motor of Crompton Greaves make centrifugal pump and sup
2025_WRD_24247_1
WDX/Accts./2025-26/e-04
Open Tender
Miscellaneous Works
Item Rate
20 days
Works Division X, WRD, Pajimol Sanguem Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹19,342
12 Feb 2026
18 Aug 2025
15 Sept 2025
18 Aug 2025
8 Sept 2025
18 Aug 2025
Amount
Disconnecting the cables, decoupling the motor, removing the foundation bolts, lifting the motor from the base, shifting and loading in the vehicle, fixing it back after repairs & connecting it back.a)170 HP motor at Naikaband
b)100 HP motor at Pump House No.2, Valkini
Dismantling the motor at works, inspecting the motor, removing the burnt windings, rewinding the stator with super enameled copper wire Class F 180 as per IS specification, incorporating RTD's, baking, varnishing & assembling with new bearings.a)170 HP motor at Naikaband
b)100 HP motor at Pump House No.2, Valkini
Supply & fixing of bearings a)170 HP motor at Naikaband 6319
b)170 HP motor at Naikaband NU 319
c)100 HP motor at Pump House No.2, 6316
d)100 HP motor at Pump House No.2, NU 316
Supply & fixing of Space Heaters and connecting it with the panel with provision of cut off when the motor is in operation. a)170 HP motor at Naikaband
b)100 HP motor at Pump House No.2, Valkini
Transportation of to & fro of motor a)170 HP motor at Naikaband
b)100 HP motor at Pump House No.2, Valkini
Alignment of the motor with the pump using laser alignment and commissioning of motor etc as per the directions of the Engineer In Charge. a)170 HP motor at Naikaband
b)100 HP motor at Pump House No.2, Valkini
Supplying of Kirloskar water pump or equivalent of 1 HP including assicories, suction hose pipe of 8meter and green hose pipe of 30 meter
Supplying of Honda Make Water pump Model WBX15, 2.0 HP Self Priming size 1.5 x 1.5 mm(40mm x 40mm) Max. Discharge 200 litr./pm. Head 26 mtr suction7.5, Suction.Running on Petrol including PVC Green Hose for suction. Dry weight 15 kg
M/S F & F CONSTRUCTIONS (BID ID -52251)
KILLEDAR ASSOCIATES (BID ID -52289)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .