| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.1 LAccepted-Finance | ₹44.1 L | L1 | Accepted-Finance Financially Qualify |
| 2 | L2₹44.4 L+₹26,508.29 (0.60%)Rejected-Finance | ₹44.4 L+₹26,508.29 (0.60%) | L2 | Rejected-Finance Financially Disqualify |
| 3 | L3₹44.6 L+₹48,598.53 (1.10%)Rejected-Finance | ₹44.6 L+₹48,598.53 (1.10%) | L3 | Rejected-Finance Financially Disqualify |
Tender Value
₹44.2 L
EMD Value
₹89,000
Closing Date
18 Aug 2026, 12:00 pmClosed
DGM (T)
UKAPM Board Niranjanpur Mandi Dehradun
Construction of 05 nos C type shop after replacing old constructed farmers rest house at Roorkee mandi premises. Job-02
2026_UAPMB_98686_1
E-Nivida-2026
Open Tender
Civil Works
Percentage
180 days
Roorkee
Please refer tender document
3 documents required · 3 mandatory
₹3,540
DGM (T) U.K.A.P.M.B.
₹89,000
18 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sides and ramming of
bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (2.8.1) | 140.78 | cum | 245.7 | ₹34,589.65 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (4.1.8) | 46.64 | cum | 6,429.2 | ₹2,99,857.89 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, reinforcement - All work up to plinth level : shuttering, finishing and 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lIll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (5.1.2) | 46.73 | cum | 8,537.5 | ₹3,98,957.38 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, floor piers, abutments, posts and struts etc. above plinth level up tofive
level, reinforcement :excluding cost of centering, shuttering, finishing and 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (5.2.2 ) | 11.11 | cum | 10,243.1 | ₹1,13,800.84 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chaijas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up floor five level, excluding the cost ofcentering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (5.3) | 30.03 | cum | 10,859 | ₹3,26,095.77 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (5.22.6) | 10,346.02 | kg | 101.8 | ₹10,53,224.84 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete (5.9.1 ) | 18.51 | sqm | 370.1 | ₹6,850.55 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for plinth horizontal in including beams, attached girders, pilasters, bressumers and (5.9.5) | 86.65 | sqm | 695 | ₹60,221.75 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts (5.9.6) | 123.43 | sqm | 907.3 | ₹1,11,988.04 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access
platform (5.9.3) | 9 | sqm | 875.1 | ₹7,875.9 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
DOC.pdf
Tender Documents • 1.25 MB
BOQ_116428.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .