Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
11 Jun 2021, 6:00 pmClosed
Manager(Commercial)
Travancore Titanium Products Limited Kochuveli Trivandrum 695 021
Reducing the Height of Ilmenite Godown and its maintenance works.
2021_TTPL_423383_1
TTP/CD/CN/SR-21/Reducing Ht_Ilmenitegodown/C/21-22
Open Tender
Miscellaneous Works
Item Rate
60 days
TRAVANCORE TITANIUM PRODUCTS LIMITED
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
Yes
₹50,000
Yes
30 Jul 2021
21 May 2021
14 Jun 2021
21 May 2021
11 Jun 2021
21 May 2021
21 May 2021 - 10 Jun 2021
Reducing the height of Ilmenite Godown and its maintenance works
Labour charges for dismantling, removing and lowering damaged and corroded MS section from the building at various level up to a maximum height of 25 m including charges for conveying and dumping the same in dump yard, hire of tools and cost of cutting gas etc. complete.
Labour charges for dismantling carefully the damaged AC sheet on roof and side cladding etc.without causing any damage to the nearby sheet and structural up to a height of 24m including charges for scaffolding and dumping the waste to the dump yard etc. as per direction of the Engineer in charge
Labour charges for fabrication of steel structurals such as column, beam, staircase, purlin, trusses,bracing, bracket etc of the building at various levels up to height of 25.3 m including charges for fabricating members to size, conveying it to the site, lifting and fitting in position either by welding or by bolting, cost of welding rods, cutting gas , hire of tools and charges for scaffolding also conveying MS materials from store etc and debris to the dumpyard etc complete as per the direction of the engineer in charge.
Labour charges for fixing non asbestos cement roofing sheet/FRP Sheet on roof and side cladding with GI bolts and nuts, grease washer, rubber cap, roofing compound etc. upto a height of 25m including cost of all labours ,hire of tools,conveying, cutting the sheet into suitable size if necessary, charges for scaffloding etc. complete as per the direction of officer in charge.
Labour charges for dismantling and removing the ridges (in pair) barge board/ apron sheet etc. or the roof of building without causing any damage and re fixing the same or any ridges after repairing work including cost of all labour, hire of tools, charges for scaffolding etc. complete as per the direction of theEngineer in charge
Labour charges for cleaning the surface thoroughly by chiselling, scrapping, wire brushing, sand papering and providing protective covering over the equipments, vessels and TiO2 bags etc to prevent rust and dust falling inside including charges for all tools, scaffolding etc. complete as per the direction of theEngineer in charge.
Labour charges for painting with zinc chromate primer over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, cable trays, steel doors ,gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports etc after cleaning the surface by chiseling, scraping, wire brushing complete as per the direction of the Engineer in charge.
Labour charges for painting with rubber based paint (lighty grey) over steel structurals such as columns,beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways,pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction ofthe Engineer in charge..
Labour charges for painting with rubber based paint (dark grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction ofthe Engineer in charge.
Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charges:In cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Labour charges for plain cement concrete nominal mix 1:2:4 using 20mm/40mm metal including charges for compacting the concrete while laying, ramming, watering, curing, lifting and conveying the material from store etc complete as per direction of engineer in charge
Labour charges for reinforced cement concrete nominal mix 1:2:4/ 1:12:3 using 20mm broken stone, including charges for mixing, placing, compacting, water curing etc. also charges for conveying the material to the site from store/ TiO2 plant area, etc. complete as per direction of engineer in charge
Labour charges for reinforcement for RCC works, bending, tying and placing in position at any level including charges for conveying the material from store etc.complete as per direction of engineer in charge
Labour charges for reinforced cement concrete (above plinth level) nominal mix 1:2:4/ 1:12:3 using 20mm broken stone, including charges for mixing, placing, compacting, water curing etc. also charges for conveying the material to the site from store/ TiO2 plant area, etc. complete as per direction of engineer in charge
Centering and shuttering including strutting, etc. and removal of form for concrete
G S CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .