| 1 | L1₹5.8 CrAdmitted-Finance NEAR PWD CAMPUS LOHAGHAT DISTRICT CHAMPAWAT UTTARAKHAND | DEHRADUN | CHAMPAWAT | UTTARAKHAND | ₹5.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.4 Cr+₹1.7 Cr (28.8%)Admitted-Finance TANAKPUR ROAD PITHORAGARH UTTARAKHAND | ₹7.4 Cr+₹1.7 Cr (28.8%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | G. S. Matiyani And Sons L2 | Laxmi Datt Binwal L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation of foundation of Structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means. Ht.Up to 3.00 Mtr. | 531.63 | cum | 54 ₹28,708.02 Lowest | 55 ₹29,239.65 |
| 2.00 | Earth work in Excavation of foundation of Structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means. Ht.3.00 to 6.00 Mtr. | 531.63 | cum | 63 ₹33,492.69 Lowest | 63 ₹33,492.69 Lowest |
| 3.00 | Earth work in Excavation of foundation of Structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means. Ht.Above 6.00 Mtr. | 1,056.17 | cum | 81 ₹85,549.77 | 79 ₹83,437.43 Lowest |
| 4.00 | Earth work in Excavation of foundation of Structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means in Hard Rock. | 239.4 | cum | 549 ₹1,31,430.6 Lowest | 573 ₹1,37,176.2 |
| 5.00 | (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) PCC 1:3:6 in Foundation | 25.7 | cum | 5,823 ₹1,49,651.1 | 5,298 ₹1,36,158.6 Lowest |
| 6.00 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M 30 Using Batching Plant, Transit Mixer and Concrete Pump | 1,021.3 | cum | 11,088 ₹1,13,24,174.4 Lowest | - |
| 7.00 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications | 50.5 | Rmt. | 216 ₹10,908 Lowest | 218 ₹11,009 |
| 8.00 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications | 101 | MT | 71,478 ₹72,19,278 Lowest | 75,000 ₹75,75,000 |
| 9.00 | Supplying, Fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. (Including the Cost of Bearing Assembly) | 2 | Set | 3,40,929 ₹6,81,858 | 3,10,000 ₹6,20,000 Lowest |
| 10.00 | Furnishing and Placing Reinforced cement concrete in super-structure as per drawing and Technical Specification RCC Grade M 25 Using concrete mixture (Height above 10 Mtr) | 75.95 | cum | 13,023 ₹9,89,096.85 | 12,356 ₹9,38,438.2 Lowest |
Tender Value
₹6.9 Cr
EMD Value
₹13 L
Closing Date
20 Feb 2021, 1:00 pmClosed
S.E 3rd Circle P.W.D Pithoragarh
S.E 3rd Circle P.W.D Pithoragarh
Construction of 70 M Span Steel Girder Bridge for Connecting Mawani Darma Dhami goun over Gori River in distt pithoragarh dharchula Constituency under MM Ghosana
2021_pwd_29585_1
1040/58C 03/2021 dated 08-02-2021
Open Tender
Civil Works - Bridges
Item Rate
540 days
munsiyari
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
S.E 3rd Circle P.W.D Pithoragarh
₹13 L
office of S.E 3rd Circle P.W.D Pithoragarh
25 Feb 2021
10 Feb 2021
20 Feb 2021
11 Feb 2021
20 Feb 2021
11 Feb 2021
16 Feb 2021
Amount
Earth work in Excavation of foundation of Structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means. Ht.Up to 3.00 Mtr.
Earth work in Excavation of foundation of Structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means. Ht.3.00 to 6.00 Mtr.
Earth work in Excavation of foundation of Structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means. Ht.Above 6.00 Mtr.
Earth work in Excavation of foundation of Structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means in Hard Rock.
(Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) PCC 1:3:6 in Foundation
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M 30 Using Batching Plant, Transit Mixer and Concrete Pump
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
Supplying, Fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. (Including the Cost of Bearing Assembly)
Furnishing and Placing Reinforced cement concrete in super-structure as per drawing and Technical Specification RCC Grade M 25 Using concrete mixture (Height above 10 Mtr)
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification
Supply and fabrication of steel truss bridge as per detailed drawing attached including supply of all structural steel confirming IS 2062 - 2011 required for proper completion of the bridge including ground errection of the bridge all T&P, nuts and bolts, washers and also including supply and fixing of shop rivets required as per drawing, required equipment shall be arranged by the contractor at his own cost which shall be taken back by the contractor after satisfactory execution of the job, the rates shall include ground errection in the workshop and its dismentling after inspection, approval and removing defects, match marking of all parts, numbering and proper stacking in the premises of workshop before cartage to site of work. The work shall be executed in accordance to IS - 1915. The rates shall include cost of all material, its wastage, cutting, bending if required, welding, making holes, shop riveting, labour, T&P etc. required for proper completion of the work. including cost of cartage from workshop to Bridge Site including safe stacking of parts.
Erection of Steel Truss (Girder) Bridge (up to 60m span) as per drawing with required camber including cartage of fabricated parts from the place of stack near site including submission of launching plan by the contractor, (duly vetted by a recognised reputable institution/ consultant if required) and approved by the engineer-in-charge. Service bolts to used shall be of approved make. The rate including of cost of all labour, T&P, equipments, civil work and consumables, cost of arranging, fabricating, errecting and dismantling of erection scheme including the cost of its designing, revising, supervision by contractor's designeer at site during erection, also including cost of all safety measures and necessary insurances of bridge and labours for proper completion of the work as per MORTH specification no. 1905 with due regard of mansoon and as per directions of the engineer-incharge.
Drainage Spouts complete as per drawing and Technical specification
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Reinforced cement concrete (M-30) approach slab including formwork but excluding reinforcement steel, complete as per drawing and Technical specification
Providing and laying of strip seal expansion joint catering to maximum horizontal movement upto 70 mm ( complete as per approved drawings and standard specifications ) to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation
Painting on Steel Surfaces Providing and applying two coats of readymix paint of approved brand on steel suface after through cleaning of surface to give an even.
Supplying and fixing of rivets confirming to the latest IS Code including all labour, material, riveting gun, T&P etc. required for proper completion of the work 22 mm dia rivets
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Ston masonary in cement mortar for sub-structure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204 Random rubble masonry in cement mortar (1:5)
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Protection Work Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
G. S. Matiyani And Sons
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
bid.PDF
Tender Documents • 23.64 MB
BOQ_35126.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .