Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 LAdmitted-Finance | ₹5.3 L | L2 | Admitted-Finance |
| 3 | L3₹6.6 LAdmitted-Finance 115 5 NADIBHAG 1ST LANE BADU ROAD MADHYAMGRAM KOLKATA 700128 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700128 | ₹6.6 L | L3 | Admitted-Finance |
| 4 | L4₹6.8 LAdmitted-Finance | ₹6.8 L | L4 | Admitted-Finance |
| 5 | L5₹7.1 LAdmitted-Finance | ₹7.1 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BURIMA CONSTRUCTION L5 | AICH CONSTRUCTION L4 | S. R. CONSTRUCTION L3 | SUKANTA DHAR L1 | SHILPI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply of unskilled labour equipped with shovel, hammer, cutter, pickaxe, basket etc necessary for encoarchment removal operation / cutting trees or branches, removal from carriageway, loading of wooden logs into tractor-trailer and unloading at the destination etc.
(Rate for 8 working hours including 1% L.W. Cess & Contractors profit) | 180 | Nos | 750 ₹1,35,000 | 800 ₹1,44,000 | 700 ₹1,26,000 | 520 ₹93,600 | 550 ₹99,000 |
| 2.00 | Supply of JCB or equivalent excavator (0.40 to 0.60 cum bucket capacity with front loader) including wages of operators & helper, cost of fuel & lubricant and all other incidental charges. | 144 | Hours | 2,200 ₹3,16,800 | 2,050 ₹2,95,200 | 2,100 ₹3,02,400 | 1,500 ₹2,16,000 | 2,050 ₹2,95,200 |
| 3.00 | Hire charges of Tractor - Trailer (90cft / 3.0 Ton capacity) including wages of operator & helper, cost of fuel & lubricant and all other incidental charges etc. | 144 | Hours | 950 ₹1,36,800 | 880 ₹1,26,720 | 850 ₹1,22,400 | 750 ₹1,08,000 | 600 ₹86,400 |
| 4.00 | Hire & labour charges of Fuel / Electrically operated Chain Shaw machine including cost of fuel & wages of operator and all other incidental charges. | 64 | Hours | 850 ₹54,400 | 800 ₹51,200 | 780 ₹49,920 | 500 ₹32,000 | 100 ₹6,400 |
| 5.00 | Hire & labour charges of Manual Shaw Cutter including wages of operator and all other incidental charges. | 64 | Hours | 800 ₹51,200 | 700 ₹44,800 | 750 ₹48,000 | 600 ₹38,400 | 50 ₹3,200 |
| 6.00 | Mobilization charges to arrange men, machinaries and all incidental factors etc. necessaryfor encoarchment removal operation / cutting of trees or branches, lifting and shifting of wooden logs or any meterial recovered from encoarchment removal operation as and when required. | 18 | Each Operation | 850 ₹15,300 | 750 ₹13,500 | 800 ₹14,400 | 550 ₹9,900 | 2,000 ₹36,000 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
23 Jun 2026, 2:00 pmClosed
Sanjoy Das, EE
Ashabari House, Krishnagar, Nadia
Mobilization and Supply of men and machineries as and when required including operation of the same in connection with removal of unauthorized encroachments and cutting or trimming and removal of uprooted or broken trees or branches under PHSD
2026_WBPWD_5015393_3
WBPWD(R)/EE/NHD-I/NIeQ-5/26-27
Open Tender
CIVIL WORKS
365 days
Nadia
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
2 Jul 2026
11 Jun 2026
25 Jun 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of unskilled labour equipped with shovel, hammer, cutter, pickaxe, basket etc necessary for encoarchment removal operation / cutting trees or branches, removal from carriageway, loading of wooden logs into tractor-trailer and unloading at the destination etc.
(Rate for 8 working hours including 1% L.W. Cess & Contractors profit) | 180 | Nos | 100 | ₹18,000 |
| 2 | Supply of JCB or equivalent excavator (0.40 to 0.60 cum bucket capacity with front loader) including wages of operators & helper, cost of fuel & lubricant and all other incidental charges. | 144 | Hours | 100 | ₹14,400 |
| 3 | Hire charges of Tractor - Trailer (90cft / 3.0 Ton capacity) including wages of operator & helper, cost of fuel & lubricant and all other incidental charges etc. | 144 | Hours | 100 | ₹14,400 |
| 4 | Hire & labour charges of Fuel / Electrically operated Chain Shaw machine including cost of fuel & wages of operator and all other incidental charges. | 64 | Hours | 100 | ₹6,400 |
| 5 | Hire & labour charges of Manual Shaw Cutter including wages of operator and all other incidental charges. | 64 | Hours | 100 | ₹6,400 |
| 6 | Mobilization charges to arrange men, machinaries and all incidental factors etc. necessaryfor encoarchment removal operation / cutting of trees or branches, lifting and shifting of wooden logs or any meterial recovered from encoarchment removal operation as and when required. | 18 | Each Operation | 100 | ₹1,800 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Tendernotice_2.pdf
PDF • 1.21 MB
BOQ_5084171.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid