Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Accepted-Technical | Accepted-Technical Qualified |
| 4 | Accepted-Technical | Accepted-Technical Qualified |
| 5 | Accepted-Technical | Accepted-Technical Qualified |
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
8 Apr 2026, 4:00 pmClosed
Executive Engineer PHE Division Kargil
Executive Engineer PHE Division Kargil
Re-activation of water supply scheme Titichumik Dumbuthang Baroo including providing laying and fitting of pipe line /distribution line by way of construction of 1 No 70000-gallon capacity SR, construction of raising main/anchor block and constructio
2026_PWD_18675_1
Fresh E-tender- 228 of PHE Division Kargil of 2025-26
Open Tender
Pipes and Pipe related activities
Item Rate
365 days
Titichumik Baroo Kargil
Refer to NIT
4 documents required · 4 mandatory
₹1,955
Payable To Executive Engineer PHE Division Kargil
₹3.9 L
10 Apr 2026
24 Mar 2026
9 Apr 2026
24 Mar 2026
8 Apr 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: (For SR) | - | - | - | - |
| - | All kind of soil 70% | - | Cum | - | - |
| - | Ordanary rock 10% | - | Cum | - | - |
| - | Hard Rock (by Chesling) 20% | - | Cum | - | - |
| - | Earth work in bulk excavation by manual means over areas (exceeding 30cm & up to 1.5mte in depth, 1.5mtr in width as well as 10sqm on plan) including Disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed. (For Pipe Line). | - | - | - | - |
| - | All kind of soil 70% | - | Cum | - | - |
| - | Ordanary rock 10% | - | Cum | - | - |
| - | Hard Rock (by Chesling) 20% | - | Cum | - | - |
| - | Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in:
(For Pipe Line). | - | - | - | - |
| - | All kind of soil 70% | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.88 MB
BOQ_44737.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .