Tender ID
Tender Value
₹80 L
EMD Value
₹80,000
Closing Date
20 Apr 2026, 3:00 pmClosed
Assistant General Manager (Commercial)
INVITATION TO BID For Garden Maintenance, Horticultural, and Cleaning of plant premises At 148-A Village: Mora, Post Bhatha, Opp. L&T, Surat-Hazira Road, Surat-394510 Gujarat, India
291478
GSEG/Com/CCPP/Garden Maintenance/2025-26/16
Open
Agriculture or Forestry Works
Works
Gandhinagar
2 documents required · 1 mandatory · 1 optional
₹5,900
Gujarat State Energy Generation Limited, Gandhinagar (Gujarat)
₹80,000
30 Mar 2026
30 Mar 2026
30 Mar 2026
20 Apr 2026
30 Mar 2026
Estimated Cost of the tender Rs.80 Lakhs for (2) Two
years (including GST)
Tender Fees Amount Rs.5,900/- (including 18%
Earnest Money Deposit Amount Rs. 80,000/-
Online [e-tendering ] tender/offer submission 20th April,
last date up to 15:00 hrs
Physical receipt of all the relevant documents 20th April,
last date up to 14:00 hrs
Date of opening of Envelope for Tender fee, 20th April,
EMD and technical BID physical as well as on
line opening after 16:00 hrs
Term of Services Two Years
Validity of BID 180 days from last date of
BID submission.
BIDDER need not to buy Tender from GSEG office. BIDDER can download
Tender Documents from the Web-Site and submit tender fee at the time of
submission of Tender or online. BIDDERs should be in touch with website
https://gsegtender.nprocure.com for information regarding revision/
corrigendum/ amendment in tender till due date of on line submission and
thereafter. No separate correspondence/ advertisement will be done in this
Assistant General Manager (Commercial)
GSEG, Gandhinagar
Gujarat State Energy Generation Limited
GUJARAT STATE ENERGY
GENERATION LTD.
INVITATION TO BID
Garden Maintenance, Horticultural,
and Cleaning of plant premises
148-A Village: Mora, Post Bhatha, Opp. L&T,
Surat-Hazira Road, Surat-394510
Gujarat State Energy Generation Ltd.
2nd Floor, Building no. A/78/3-8
Beside iGATE, GIDC Electronic Estate
Sector-25, Gandhinagar - 382
Tender for the Garden Maintenance Page 2 of
Gujarat State Energy Generation Limited
Tender for the Garden Maintenance Page 3 of
Gujarat State Energy Generation Limited
1. Introduction
GSEG (herein after referred to as Owner) is registered company under the
Company’s Act and is engaged in power generation by harnessing the eco-
friendly and economical natural gas in Gujarat. GSEG is inviting BIDs from
the qualified BIDDERs for Garden Maintenance, Horticultural, and Cleaning
of plant premises at its Power Plant at 148-A Village: Mora, Post Bhatha,
Opp. L&T, Surat-Hazira Road, Surat-394510, Gujarat, India for the period of
2. Scope of Enquiry
BIDs are solicited for Garden Maintenance, Horticultural, and Cleaning of
plant premises at GSEG’s Combined Cycle Power Plant at 148-A Village:
Mora, Post Bhatha, Opp. L&T, Surat-Hazira Road, Surat-394510, Gujarat,
3.1. This tender document and its contents are confidential. Accordingly,
this tender document and its contents, or any information, which shall
be made available in connection with any further queries, must be held
in complete confidence.
3.2. By accepting this tender document, the recipient acknowledges and
3.2.1. All of the information contained herein is of a highly confidential
nature and the recipient shall keep all such information and all other
information made available to the recipient in connection with any
3.2.2. None of such information shall be used by the recipient or any
employees or representatives of the recipient in any manner,
whatsoever, in whole or in part, other than in connection with its
submission of BID.
3.2.3. The recipient shall not reproduce this tender document or disclose any
particulars of this tender document in any trade or technical paper or
elsewhere, in whole or in part, and will not distribute all or any portion
of this tender document to any person other than the recipient’s
employees or representatives who have a need to know such
information for the purpose set above and who are informed by the
recipient of the confidential nature of such information.
3.2.4. Any proposed action by the recipient which shall be inconsistent in any
manner with the foregoing agreement shall require the prior written
Tender for the Garden Maintenance Page 4 of
Gujarat State Energy Generation Limited
consent of the Owner.
3.2.5. The recipient shall indemnify the Owner in case of breach of the above.
If the confidential details relating to this Contract or its contents are
received by a third party from the recipient or its employees or its
representatives and the third party makes use of these details to cause
harm or monetary loss to the Owner or use this tender document for
their personal gain / monetary gain, the recipient shall compensate the
Owner for the loss suffered as well as for the value of gain derived by
the third party. The recipient shall not use the confidential details of
the tender document for any other purpose except for the strict purpose
Tender for the Garden Maintenance Page 5 of
Gujarat State Energy Generation Limited
Tender for the Garden Maintenance Page 6 of
Gujarat State Energy Generation Limited
1. About BID DOCUMENT
1.1. Definitions
“GSEG” shall mean M/s. Gujarat State Energy Generation Ltd, having its
office at. 2nd Floor, Building no. A/78/3-8, Besides iGATE, GIDC Electronic
Estate, Sector-25, Gandhinagar - 382 016 and shall include all their legal
representatives and assignees.
“BID DOCUMENT” includes the complete set of documents attached hereto
including all Annexure(s), forms, and BID Amendments, if any.
“BIDDER” shall mean an individual or firm or their legal representative who
has received the BID DOCUMENT and is submitting the BID as per the terms
& conditions herein.
“Contractor” shall mean the successful selected Bidder / person or persons,
firm or company or corporation, whose BID has been accepted by the Owner
and includes the Contractor’s legal representative, his successors and
permitted assignees.
1.2. Contents of BID DOCUMENT
The BID Invitation Document has been prepared for the purpose of inviting
BIDs for Garden Maintenance, Horticultural, and cleaning of plant premises
at GSEG’s Combined Cycle Power Plant at 148-A Village: Mora, Post
Bhatha, Opp. L&T, Surat-Hazira Road, Surat-394510, Gujarat, India.
The BID DOCUMENT comprises of:
Section 1: Preamble
Section 2: Instruction to BIDDER
Section 3: BIDDER Qualification
Section 4: General Terms and Conditions
Section 5: Scope of Work
Annexure 1: Letter of Undertaking
Annexure 2: Information and Documentary Evidence of the BIDDER’s
Annexure 3: CA Certificate for Turn Over and Profit
Annexure 4: Details of the Assignments in Previous Years
Tender for the Garden Maintenance Page 7 of
Gujarat State Energy Generation Limited
Annexure 5: Confirmation of Submission of Price BID/ Proposal
Annexure 6: Format for online submission of price proposal
Appendix 1: Format Of Performance Bank guarantee
1.3. Intent of Inquiry
1.3.1. The inquiry is invited from reputed BIDDER for Garden
Maintenance, Horticultural, and cleaning of plant premises at GSEG’s
Combined Cycle Power Plant at 148-A Village: Mora, Post Bhatha,
Opp. L&T, Surat-Hazira Road, Surat-394510, Gujarat, India.
1.3.2. The inquiry specification comprises of Introduction and Scope of
Inquiry, Instruction to BIDDER, Conditions of Contract, Project
Information, Technical information, Annexure(s) & Schedules.
1.3.3. The inquiry specification explains in detail the scope of the Contractor.
The statements and explanations contained in this regard shall be
intended to provide a proper understanding to BIDDER but shall not
be construed as limiting Contractor’s responsibilities and / or Owner’s
right to amend / change the scope or the terms. It shall be clearly
understood that the intent of the Owner shall be that the BIDDER shall
execute this Contract as specified and as required subject to the points
explicitly identified and consequently, any omissions, conflicts or
contradictions in these specifications shall be noted, interpreted and
applied appropriately to give effect to this intent. Claims or disputes on
account of wrong interpretation or willful misinterpretation of this
intent by BIDDER after award of Contract shall not be entertained by
Owner nor shall they be legally binding on Owner.
2. Plant Location
2.1. The work/ services are to be executed/ provided at GSEG’s Combined
Cycle Power Plant at 148-A Village: Mora, Post Bhatha, Opp. L&T,
Surat-Hazira Road, Surat-394510, Gujarat, India.
3. Instruction to BIDDER
3.1. The BIDDER shall bear all costs associated with the preparation and
submission of the BID and GSEG will, in no case be responsible or liable
for these costs regardless the conduct or outcome of the process. The
BIDDER is expected to examine all instructions, forms, terms &
conditions in the BID DOCUMENT.
3.2. GSEG reserves the right to cancel any or all the BIDs as per its discretion
Tender for the Garden Maintenance Page 8 of
Gujarat State Energy Generation Limited
without assigning and giving any reason thereof. GSEG also reserves
right to rescind the process of this BID at any time before placement of
the order for the said scope of work herein.
3.3. The BIDDER shall prepare the BID based on the information furnished
and terms & conditions provided in the BID DOCUMENT. The
BIDDER shall undertake and shall be deemed to have undertaken a
thorough study of the proposed work, the job site(s) involved, the site
conditions, the labour, power, water, material and equipment
availability, transport and communication facilities and temporary
offices and accommodation quarters and all other factors, constraints and
facilities necessary for the formulation of the BID, supply of materials
and the performance of the work(s) as envisaged in this document. The
BID shall also contain all the information asked in the BID
DOCUMENT with supportive data wherever necessary.
3.4. BIDDER shall visit, inspect and examine the site(s) and its surroundings
and shall satisfy himself before submitting his BID as to the nature of
the ground present, physical conditions and all roads, approaches and
lands which may be used temporarily otherwise in connection with the
works, means of access to the site accommodation he may require and
in general shall himself obtain all necessary information as to risks,
contingencies and other circumstances which may influence or affect his
3.5. Failure to furnish all information required by the BID DOCUMENT(s)
or submission of a BID not substantially responsive to the BID
DOCUMENT(s) will be at the BIDDER’s risk and may result in the
rejection of the BID.
3.6. The BID submitted is to be signed by a person who is a duly authorized
by the company. A proof in this regard to be submitted in the Technical
3.7. This BID DOCUMENT is non-transferable. Each BIDDER shall submit
only one BID by himself. Joint Venture or Consortium BID is not
3.8. At any time prior to the deadline for submission of BID, for any reason,
whether at its sole initiative or any response to a clarification requested
by a BIDDER, GSEG may modify the BID DOCUMENT(s) by
amendment(s) thereto. The amendment(s) will be notified on
https://gsegtender.nprocure.com website. The BIDDERs are advised to
check website for the same.
Tender for the Garden Maintenance Page 9 of
Gujarat State Energy Generation Limited
3.9. The BID prepared by the BIDDER and all correspondence and
documents relating to the BID exchanged between the BIDDER and the
GSEG shall be written in English language only.
3.10. Bidder may visit at site to physical assessment of the work, if required
at its own cost and same shall not be reimbursed by the GSEG.
4. Tender Fee & Earnest Money Deposit (EMD)
4.1. The BIDDER shall deposit non refundable Tender Fee of Rs.5,900/-
(including 18% GST) in the form of an Account Payee Demand Draft
from a scheduled bank payable at Gandhinagar/Ahmedabad at the time
of submission of the physical Technical BID or online.
4.2. The BIDDER shall deposit Earnest Money Deposit (EMD) for an
amount of Rs. 80,000/- in the form of an Account Payee DD from a
scheduled bank or online. No interest shall be paid on EMD.
4.3. Demand draft in favour of “Gujarat State Energy Generation Limited,
Gandhinagar (Gujarat).” Or Online.
Details of Beneficiary:
Name of Beneficiary: GUJARAT STATE ENERGY GENERATION LTD
Name of the Bank: BANK OF BARODA
Name of the Branch: MID CORP BRANCH, AHMEDABAD
Types of Account: CC ACCOUNT
IFSC Code: BARB0MIDAHD
4.4. In case on online submission of EMD/ tender fees kindly provide the
GST details through email to [email protected]
4.5. Any BID not accompanied by Tender Fee, BID Security/ EMD shall be
rejected. Please furnish details of Tender Fee & EMD paid on the
4.6. Bidder, registered with NSIC/MSME is not exempted from payment of
Tender fee and EMD.
4.7. EMD securities of the unsuccessful BIDDERs will be returned after
expiry of the final BID validity and after award of contract to the
successful Bidder. In case of non-receipt of the such amount, kindly
send the request to: [email protected] with a copy to:
4.8. EMD of the successful BIDDER shall be released on receipt of
Performance Bank Guarantee on request by the contractor.
4.9. EMD shall be forfeited if the BIDDER withdraws his BID during the
period of BID validity. EMD shall be forfeited, if the successful
Tender for the Garden Maintenance Page 10 of
Gujarat State Energy Generation Limited
BIDDER doesn’t respond/ refuses or neglects to execute the contract on
issuance of LOI/ Work Order or non-submission of performance bank
guarantee in given time period.
5. BID Clarification/ Amendment
5.1. The prospective BIDDER requiring any clarification shall write to
GSEG on or before the last date of BID Clarification so as to ensure
submission of BID on or before the Last Date of Submission of BID and
the GSEG will notify on https://gsegtender.nprocure.com website. The
BIDDERs are advised to check website for the same. No separate
correspondence/ advertisement will be done in this regard.
5.2. At any time prior to the Last Date Of Submission of BID, GSEG, for
any reason, whether at his sole initiative or any response to a
clarification requested by a prospective BIDDER, may modify the BID
DOCUMENT(s) by amendment(s) thereto. The amendment(s) will be
notified on https://gsegtender.nprocure.com website. The BIDDERs are
advised to check website for the same. No separate correspondence/
advertisement will be done in this regard.
6. BID Validity
The BID shall be kept valid for at least 180 days from the Last Date of
BID Submission. A BID with validity for a shorter period than the above
may be rejected by GSEG. If required, GSEG may solicit the BIDDER’s
consent to an extension of the period of BID validity.
No deviations to be taken by the BIDDER to the BID Document(s). BIDs
with any deviation are liable for summarily rejection.
8.1. The price quoted by the BIDDER shall be all inclusive considering the
total scope of work as envisaged in the BID DOCUMENT.
8.2. The price should be quoted in Indian Rupees only, considering relevant
minimum wages act/ rules and all the prevailing applicable statutory
compliances. Price should be quoted online only.
9. Submission of BID
9.1. All the relevant documents as per requirement of the Bid document be
submitted physically along with the Tender Fee & EMD in sealed cover
Tender for the Garden Maintenance Page 11 of
Gujarat State Energy Generation Limited
so that the same is received in this office on OR before the due date and
9.2. BIDDERs are requested to submit price – BID on-line only and not to
submit the price BID in physical form. BIDDER to confirm submission
of online Price BID in Annexure 5. This is mandatory. Only on-line
submitted price BID will be considered for evaluation. Format for
online price bid is at Annexure
9.3. It is mandatory for all the BIDDERs to submit their Technical BID
documents physically in schedule time.
9.4. The Technical BID along with Tender Fee and EMD, prepared by the
BIDDER shall be in One Original and two copies in separate envelopes.
The envelope should be marked as “Original”, “Copy 1” & “Copy 2”
9.5. The Technical BID must contain following details / Documents. All the
documents must be stamped and self certified.
9.5.1. Tender Document with clarification/ amendments duly stamped and
9.5.2. Proof of Tender Fee in form of Account Payee DD. EMD payment, in
form of Account Payee DD, in Favour of “Gujarat State Energy
Generation Ltd.”, in separate envelope super scribing “Tender Fee
9.5.3. Annexure 1 – Letter of Confirmation with respect to understanding of
the complete scope of services as envisaged, No Deviation in the BID
9.5.4. Copy of power of Attorney / Authority to sign the BID Documents.
9.5.5. Annexure 2 – Details of the Company along with supporting
documents for various registrations to Government Authority.
9.5.6. Annexure 3 – Certificate from Practicing Chartered Accountant for the
year wise turnover and profit of previous years.
9.5.7. The List of jobs carried out by the BIDDER for allied experience in
previous years and its Documentary evidences to substantiate the same.
9.5.8. Confirmation by BIDDER for Online submission of Financial Proposal
9.6. If required the GSEG may ask for the additional information as well as
may invite the BIDDER for discussion on its BID. Failure to furnish all
information required by GSEG may result in the rejection of the BID.
9.7. The Envelopes containing information as per above instructions, must
Tender for the Garden Maintenance Page 12 of
Gujarat State Energy Generation Limited
be sealed individually with super scribed as follows:
Envelop 1 containing Tender Fee and EMD: “Tender Fee and EMD”
Envelope 2 containing Original of Technical BID: “Original:
Envelope 3 containing Copy 1 of Technical BID: “Copy 1: Technical
Envelope 4 containing Copy 2 of Technical BID: “Copy 2: Technical
All the above mentioned four envelopes are to be placed in another
bigger envelope which is to be super scribed as “BID for Garden
Maintenance, Horticultural, and cleaning of plant premises at GSEG’s
CCPP at Village: Mora, Gujarat”.
10. BID Closing Dates
10.1. The prospective BIDDER requiring any clarification shall write/ mail
to GSEG on or before the last date of BID Clarification i.e. 10th April,
2026 so as to ensure submission of BID on or before the Last Date of
Submission of BID. No queries shall be entertained thereafter.
10.2. The prospective BIDDER may send their queries seeking clarification
to: [email protected] with a copy to: [email protected]
10.3. GSEG will notify for clarification/ amendments on
https://gsegtender.nprocure.com website. The BIDDERs are advised to
check website for the same.
10.4. Last date for submission of the Technical BIDs: by 15.00 hrs of 15th
10.5. Date and time of Technical BID Opening : 16.00 hrs of 15th April,
10.6. Any BID received by GSEG after the deadline for submission of BID
prescribed by GSEG may be rejected. GSEG will not be responsible if
BID is not delivered in time by the Post or Courier or any other reason
what so ever. The responsibility of ensuring on-time submission of their
offers lies entirely with the BIDDERs.
10.7. If there is any change in the dates, it will be notified on
https://gseg.nprocure.com website accordingly. The Bidders are
advised to check website for the same. No separate correspondence/
advertisement will be done in this regard.
10.8. The Technical BID may be submitted to the Assistant General Manager
(Commercial) at following address:
Tender for the Garden Maintenance Page 13 of
Gujarat State Energy Generation Limited
Shri Ketan Parekh
Assistant General Manager (Commercial)
Gujarat State Energy Generation Ltd.
2nd Floor, Building no. A/78/3-8
Beside iGATE, GIDC Electronic Estate
Sector-25, Gandhinagar - 382 016, India
11. BID Opening and Evaluation
11.1. The authorized representatives of the GSEG will first open envelope
containing Tender Fee and EMD.
11.2. Then the authorized representatives of the GSEG will open envelope
containing Technical BID of those BIDDERs who have submitted
Tender Fee and EMD.
11.3. The BID of any BIDDER who has not complied with the conditions
prescribed herein or conditional BID is liable for rejection.
11.4. Price BID of only the technically qualified BIDDERs shall be
considered for opening and evaluation.
12. Right to Accept Any BID and to Reject Any or All BID
12.1. The right to accept in full or in part/parts the BID will rest with GSEG.
However, GSEG does not bind itself to accept the lowest BID and
reserves the right to reject any or all the BIDs or any part of a BID so
received and no compensation shall be paid for the efforts made by the
12.2. The right to abandon bidding process without assigning any reason will
rest with GSEG. No compensation shall be paid for the efforts made by
12.3. GSEG may reject to BID of the BIDDERs, if it is found that the
BIDDER/ Contractor is black listed / stop deal/ holiday list on previous
occasions by the any of the Departments/Institutions/Local
Bodies/Municipalities/Public Sector Undertakings, etc.
12.4. Bidder should not have filed Bankruptcy in last 3 years and no
insolvency case should be pending anywhere in India.
13. Evaluation of BID
The BID shall be evaluated in two stages:
13.1. Stage-I: Review of Tender Fee and EMD (BID Security)
13.1.1. On the date of BID opening as shown on above of this BID,
envelope containing Tender Fee and EMD will be opened.
Tender for the Garden Maintenance Page 14 of
Gujarat State Energy Generation Limited
13.1.2. Those who have submitted Tender Fee and EMD, their Technical
BID shall be opened.
13.1.3. Technical BIDs which are found deficient on general scrutiny will be
treated as non-responsive and may be rejected.
13.2. Stage-Il: Opening of Price BID
13.2.1. Price BIDs of Technically Qualified BIDDERs shall be opened.
13.2.2. The Price BIDs will be scrutinized for compliance with BID.
13.3. Evaluation methodology
13.3.1. The BIDDER is to submit online, rates for Garden Maintenance,
Horticultural, and cleaning of plant premises, in Indian Rupees only,
and confirm in the format as mentioned in BID document at
Annexure 5. Price BID shall be online only. Based on which the BID
will be evaluated.
13.3.2. The BID with lowest quoted online rate shall be considered as L-1.
The BID second to lowest quote shall be considered as L-2 and so on.
13.3.3. In case of tie for L-1 position for qualified bids (technical as well
as financial), L-1 bidder shall be selected through lottery system
(on nprocure). In that case, Bidder to unconditionally agree for
selection of L-1 Bidder and shall not raise any issue thereafter in
this regards. (Annexure – 5).
14. Award of Contract
14.1. GSEG will award the work order to the successful evaluated BIDDER
whose BID has been found to be responsive and who is eligible and
qualified to perform the contract satisfactorily as per the terms and
conditions incorporated in the BID DOCUMENT.
14.2. GSEG will communicate the successful BIDDER by a Work Order.
14.3. The successful Bidder shall furnish a performance security guarantee in
the form of a Bank Guarantee from a Scheduled Bank as per the format
given in Appendix 1, and shall be for an amount equal to 10% of the
value of the total Contract/Order value for the term of the contract/order
within 10 days of the issuance of Work Order. The Performance Bank
Guarantee shall remain valid for a period of Forty Five (45) days beyond
the date of completion of all contractual obligations.
14.4. Failure of the successful BIDDER to comply with the requirements of
above clauses shall constitute sufficient grounds or the annulment of the
award and forfeiture of EMD.
Tender for the Garden Maintenance Page 15 of
Gujarat State Energy Generation Limited
Tender for the Garden Maintenance Page 16 of
Gujarat State Energy Generation Limited
1. Bidders Qualifying Criteria
1.1. Bidder has paid Tender Fee of Rs.5,900 (including 18% GST) in of DD
or online and EMD of Rs. 80,000/- in form of demand draft in favour
of “Gujarat State Energy Generation Limited, Gandhinagar
(Gujarat).” Or online.
1.2. The Bidder must have experience of Garden Maintenance,
Horticultural, and cleaning of plant premises of industries/organisation
units/plants in India in last seven years as follows:
One Such Job with order value not less than Rs.32 Lakhs OR
2 such jobs with order value not less than Rs.20 Lakhs each.
3 such jobs with order value not less than Rs. 16 Lakhs each.
Copy of order/contract or proof of the same is to be provided in the
1.3. In last three years, Bidder must have the annual turnover of more than
Rs.12 Lakhs in each year. Bidder must be a profit making company in
each year with Certificate of a practicing Chartered Accountant in this
1.4. Bidders shall have to provide the original/ notarised copy of all the
supporting documents as required for qualification in the tender
1.5. Bidder must have PAN card. Copy of PAN card to be attached.
1.6. Bidder must have Registration Certificate of the Company
1.7. Bidder must have Labour registration and license.
1.8. Bidder must have GST Registration.
1.9. Bidder must have registration under EPFO.
1.10. Bidder must have registration under ESI.
1.11. Bidder must not be Black listed/ stop deal/ holiday list by any
Government Department/Autonomous bodies / PSU etc. An
undertaking that the Bidder has not been blacklisted/ stop deal/ holiday
list by any Government Department/Autonomous bodies / PSU etc. is
required to be submitted by the Bidder.
1.12. An Undertaking that the Bidder or its working employees are not
convicted by any court. Bidder should have above stated requirements
and the GSEG reserves the right to request for any additional
information and reserves the right to reject the proposal of any Bidder,
if in the opinion of the GSEG, the qualification data is incomplete or the
Tender for the Garden Maintenance Page 17 of
Gujarat State Energy Generation Limited
Bidder is found not qualified to satisfactorily perform the works.
Bidders have to submit the supporting Documents /proofs etc., duly
stamped and self- certified, for all above qualifying criteria.
1.13. Bidder must have substantial Operating base in Gujarat and must have
Controlling Office/ Head Office/ Registered Office/ Regional Office in
1.14. Bidder should not have filed Bankruptcy in last 3 years and no
insolvency case should be pending anywhere in India.
Tender for the Garden Maintenance Page 18 of
Gujarat State Energy Generation Limited
Bid Submission forms & check List
(Annexure 1 to Annexure 7)
Following checklist is intended to ensure that all information necessary to
evaluate your proposal has been included. Please indicate Yes / No or
Acceptable / Not Acceptable, whichever is not applicable.
Sr. Name of the Document Submitted Comments,
No. Yes/No If any
1 All the documents (including tender document
along with clarification/ amendments) must be
stamped and self certified, in Original and two
2 Proof of Tender Fee & EMD payment, Demand
Draft in Favour of GSEG.
3 Letter of Confirmation with respect to
understanding of the complete scope of services
as envisaged, No Deviation in the Bid
Document (Annexure – 1)
4 Copy of power of Attorney / Authority to sign
the Bid Documents.
5 Details of the Company (Annexure – 2 )
6 Certificate from Practicing Chartered
Accountant for the year wise turnover of last
three years (Annexure 3)
7 The List of jobs carried out by the Bidder in
previous years and its Documentary evidences
to substantiate the same. (Annexure –4)
8 Confirmation of submission of online Price Bid
as per Annexure 5 &
9 Copy of PAN Card
10 Copy of GST No.
11 Check whether Online Price submitted or not?
12 Copy of Labor License
13 Copy of EPF No.
14 Copy of ESI No.
Tender for the Garden Maintenance Page 19 of
Gujarat State Energy Generation Limited
(To be submitted on the Bidder‘s Organization Letterhead)
(To be included in the Envelope-2 of Technical Bid)
(Copy of the Power of Authority to sign to be submitted along with this
Assistant General Manager (Commercial)
Gujarat State Energy Generation Limited
A/78/3-8, GIDC Electronic Estate,
Near Patni Computers (iGATE), Sector
Gandhinagar 382016, Gujarat, India
Subject: Technical Proposal – Submission / Confirmation on Garden
Maintenance, Horticultural, and cleaning of plant premises at
GSEG’s Combined Cycle Power Plant at 148-A Village: Mora,
Post Bhatha, Opp. L&T, Surat-Hazira Road, Surat-394510,
Gujarat, India..
authorized person of , a
company, herewith enclose Technical Proposal for selection of my / our firm
/ organization for the Garden Maintenance, Horticultural, and cleaning of
plant premises at GSEG’s Combined Cycle Power Plant at 148-A Village:
Mora, Post Bhatha, Opp. L&T, Surat-Hazira Road, Surat-
herewith confirm that we have understood the complete Scope &
specification of work as envisaged in the Bid Document. It is also confirm
that we have visited the site and are well acquainted with scope of supply
and services along with site and surrounding condition. For whatsoever
reasons, we shall not raise any further issues for the same in future.
It is also confirmed hereby that no deviation in accordance with the Bid
Document is taken and we shall comply the Bid Document in totality.
Tender for the Garden Maintenance Page 20 of
Gujarat State Energy Generation Limited
The Bid is valid up to 180 days from the last date of Bid submission.
I/we also confirm that my/our agency has not been blacklisted/ stop deal/
holiday list by any Government Department or PSU of GOI/GOG as on the
date of submission of the Bid.
I/we also confirm that Bankruptcy has not been filed within last 3years and
no insolvency case is pending anywhere in India.
I/We also confirm that my/our company/organisation or its working
employees are not convicted by any court or any other legal authority.
I/We here by agree to abide by and fulfil all the terms and provisions of the
Bid document and contract for work/supply as applicable and in case of
default thereof to forfeit and pay to the Company the sums of money due.
I/We hereby confirm that Price is submitted online on “nProcure” website.
Yours faithfully,
Name of the Bidder
Tender for the Garden Maintenance Page 21 of
Gujarat State Energy Generation Limited
Information and Documentary Evidence of Bidder’s Qualification
1. General Information of the Bidder
1.1 Bidder’s Legal Name
1.2 Bidder’s Legal address in Country of
1.3 Address of Bidders’ Regional
Office/ Head Office/ Controlling
office in Gujarat
1.4 Bidder’s Legal status
(Proprietorship / Partnership /
Limited or Incorporated / Limited
Liability Concern / Others)
1.5 Bidder’s Business Status
1.6 Bidder’s Authorized Representative
Telephone / Fax Numbers
1.7 To mention registration no. and
attach copy of following Documents:
i. The notarized Power of
Attorney, authorizing a person
to sign the Proposal on behalf of
iv. Labour License
2. Bid Validity (Not less than 180 days from the date of Bid Closing)
The Bid is valid up to :
Tender for the Garden Maintenance Page 22 of
Gujarat State Energy Generation Limited
3. Bank Details Information of the Bidder (Copy of Cancelled Cheque to be
3.1 Bidder’s Account in the Bank
3.2 Bidder’s Account Type
3.3 Bidder’s Bank Account Number
3.4 Bidder’s Name & address of Bank
3.5 Bidder’s Bank Branch MICR code
3.6 Bidder’s Bank Branch IFSC code
Name of the Bidder
Note : Attach all the documents as mentioned above.
Tender for the Garden Maintenance Page 23 of
Gujarat State Energy Generation Limited
[On Chartered Accountant’s letter head]
This is to certify that M/s. [Name of the
Bidder ] having its office at [Address of the
Bidder ] with PAN
No……. (Insert PAN no. of the Bidder) is in the business of ............. (Insert
briefly the nature of the business), has recorded the following Turnover and
Profit in last three financial years are as follows:
Year Turnover Rs. Profit Rs. Audited Statement
2022-23 Yes/ No
2023-24 Yes/ No
2024-25 Yes/ No
All figures indicated herein are arrived from the Audit Reports of the Bidders
duly submitted to the Income Tax Department.
[FOR MSME Bidders ONLY] This is to certify that based on financials
M/s. [Name of the Bidder________________________] is valid for
MSME under the Service Category [Service Category].
Round stamp of CA [Name and Registration No. of
Chartered Accountant]
Tender for the Garden Maintenance Page 24 of
Gujarat State Energy Generation Limited
Assignments Undertaken /ongoing During Previous Years
Details of Company(ies) /organization where Garden Maintenance, Horticultural, and cleaning are
provided by the Bidder. (Including all ongoing Contracts)
Name of the Address and Date of Date of Name of the Amount of Phone No. Remarks
Sr. Company/ Location Commencement Completion Contact person Work and e-mail
No. Organization where of the Services of the of the order/ id of the
services are Services company/ Contract Contact
provided. organization to Value (Rs.) person.
Location whom services
Name of the were provided
(Please. attach copy of each contract / agreement. Letter issued by respective organization may also be attached.)
Tender for the Garden Maintenance Page 25 of
Gujarat State Energy Generation Ltd.
Confirmation by Bidder for submission of Financial Proposal online
Assistant General Manager (Commercial)
Gujarat State Energy Generation Limited
A/78/3-8, GIDC Electronic Estate,
Near Patni Computers (iGATE), Sector
Gandhinagar 382016, Gujarat, India
Subject: Online Submission of Financial / Price Proposal for Garden Maintenance,
Horticultural, and cleaning of plant premises at GSEG’s Combined
Cycle Power Plant at 148-A Village: Mora, Post Bhatha, Opp. L&T,
Surat-Hazira Road, Surat-394510, Gujarat, India
authorized person(s) of , a company, herewith
confirm that we have submitted Financial/Price Proposal, for selection of my / our
firm / organization for Garden Maintenance, Horticultural, and cleaning of plant
premises at GSEG’s Combined Cycle Power Plant at 148-A Village: Mora, Post
Bhatha, Opp. L&T, Surat-Hazira Road, Surat, online on “nProcure” website.
I/We further confirm that, the Service Charge quoted by the Bidder shall be fixed for
entire term of the Contract.
I/We further confirm that, in case of tie for L-1 position for qualified bids, L-1 bidder
to be selected through lottery system (on nprocure) and shall not raise any issue
thereafter in this regards.
Yours faithfully
Tender for the Garden Maintenance Page 26 of
Gujarat State Energy Generation Ltd.
Format for Financial Proposal for Garden Maintenance, Horticultural, and
Cleaning of plant premises, Online Submission
Sr. Service Total
No. Rs./ Charge Amount Rs./
Description Quantity Month#* (%)age Month
1 Labour for cleaning 11
3 Additional labour 6
during monsoon for
4 Total (per year excluding GST)
6 Total for two years including GST
Note: #Minimum Wages for the period from 1.10.2025 to 31.03.2026 is considered
* Following Statutory Obligations to be considered above
Sr. No. Particulars Percentage
P.F. Employer Contribution
including Admin Charges
3. Leave Salary 5.00%
Tender for the Garden Maintenance Page 27 of
Gujarat State Energy Generation Ltd.
Sr. Rs./day/ Qty (including Rs./ Month
No. Description Quantity Statutory Obligations)
2 Supervisor (474+48.5)*1.2958 =
1. Bidder to quote Service charges in percentage only.
2. Service Charges shall include Bidder’s Mark-up and all Associates Costs for
performance & administration of the Contract / Services and Equipments,
tools and tackles, tractor cum driver cost used for services as per the tender
3. GSEG shall not pay any other charges under any head apart from the
Services Charges. Bidder to quote Service Charges which should not be
less than 3.85%. Any bidder quoting less than 3.85% for the Service
Charges shall be disqualified. The percentage (%) quoted by the Bidder shall
remain fixed and firm throughout the Contract term.
4. Bidder to consider statutory obligations other than as mentioned above
5. For applicability of GST shall be based on HSN/SAC Code.
6. No Overtime shall be paid.
7. No conditions should be attached to the price proposal.
8. There shall be no change in the service charges quoted above for the entire
term of two years.
9. The manpower deployment as mentioned is indicative. Actual deployment
10.In case of tie for L-1 position for qualified bids (technical as well as
financial), L-1 bidder shall be selected through lottery system (on nprocure).
11.The quoted Service Charge & other misc. charges shall be fixed for entire
period of Contract. Basic as per minimum wages Act including weekly off
& amount of Statutory obligations shall be variable based on revision in
applicable minimum wages. Total Rate of Personnel shall be worked out on
the effective date based on formula as mentioned below.
Tender for the Garden Maintenance Page 28 of
Gujarat State Energy Generation Ltd.
12.GSEG shall require Additional 6 Labour for cleaning during Monsoon
for 4 months a year.
Tender for the Garden Maintenance Page 29 of
Gujarat State Energy Generation Ltd.
GENERAL TERMS AND
Tender for the Garden Maintenance Page 30 of
Gujarat State Energy Generation Ltd.
1. General Conditions:
That it is expressly understood and agreed between the parties to this Contract
The persons deployed by the contractor for the services mentioned herein shall
be the employees of the Contractor for all intents & purposes. Any person(s),
so deployed, shall remain under the control and supervision of the Contractor
and in no case, shall a relationship of employer and employee between the said
persons and the Owner shall accrue/arise implicitly or explicitly
On taking over the responsibility of deploying Contractor’s
Gardening/Cleaning/ Horticultural personals, the Contractor shall formulate
the mechanism and duty assignment/ deployment in consultation with
Representative from GSEG Admin department (Reporting Officer) of the
Owner or his nominee. Subsequently, the Contractor shall review work
arrangement from time to time and advise the Reporting Officer for further
streamlining the system. The Contractor shall further be bound by and carry
out the directions/instructions given to him by the Reporting Officer or the
officer designated by the Reporting Officer in this respect from time to time.
The Reporting Officer or any other person authorized by him shall be at liberty
to carry out surprise check on the persons so deployed by the Contractor in
order to ensure that persons deployed by him are doing their duties.
In case of the persons so deployed by the Contractor does not come up to the
mark or does not perform his duties properly or indulges in any unlawful
activities or riots or disorderly conduct, the Contractor shall immediately
withdraw and take suitable action against such persons on the report of the
Reporting Officer. Further, the contractor shall immediately replace the
particular person so deployed on the demand of the Reporting Officer, in case
of any of the aforesaid acts on the part of the said person.
The requirement of Gardeners or posts identified is subject to change. The
Reporting Officer shall be under no obligation to hire a particular number of
supervisors/Gardeners.
2. Obligation of the Contractor
The scope of services includes following, but is not limited to:
The scope of services as mentioned in section 5 of the BID DOCUMENT.
The contractor shall deploy sufficient manpower for performing the defined
scope of work satisfactorily.
Tender for the Garden Maintenance Page 31 of
Gujarat State Energy Generation Ltd.
The Gardening/Cleaning/Horticultural personnel deployed by the Agency shall
report to the designated official of the Owner. They shall be responsible for
Garden Maintenance, Horticultural, and cleaning of plant premises.
The Gardening/Cleaning/Horticultural Personnel provided by the Contractor
shall be physically fit with prior experience of performing such jobs, well
behaved and properly trained in the performance of the Gardening services. No
trainee supervisors/Gardeners to be deployed at GSEG plants.
The personnel provided by the Contractor shall be punctual in their duties. In
case of any complaint made by the Owner, the Contractor shall immediately
replace such personnel with new personnel.
The Contractor shall provide the personnel should be issued with I Card which
should be displayed at all times.
The Contractor shall ensure that all personnel maintain various records,
including their presence and absence of duty at any time, occurrence book, etc.
as deemed fit & relevant by the Contractor.
The Contractor shall be responsible for the payment of minimum wages and
all statutory benefits including but not limited to provident fund, medical
expenses, leave salary, bonus, gratuity, workmen compensation, etc. to the
personnel engaged by them for the work at different plants specified by the
Owner and there shall be no liability to the Owner on these accounts.
There may arise, a requirement for temporary deployment of
Gardening/Cleaning/Horticultural personnel at Owner’s plant(s)/sites, etc. The
same shall be provided and deployed by the Contractor on immediate basis.
The Contractor shall inform about the work to be carried out during the day to
the owner and shall take required work permit to do the work.
Owner shall not be responsible for providing residential accommodation/
transportation/ Lunch/ Dinner/ Snacks to any of the employee of the
Night stay inside the Owner’s premises is not permissible at any
circumstances. No night work shall also be allowed in the premises.
The Contractor shall, at its own expense, provide for accommodation and
transportation facility to the Gardening/Cleaning/Horticultural personnel. The
Gardening/Cleaning/Horticultural personnel provided by the Contractor shall
ensure compliance with HSE Policy and Safety Rules & Regulations of the
The Contractor shall provide the personnel with the Personal Protective
Tender for the Garden Maintenance Page 32 of
Gujarat State Energy Generation Ltd.
Equipments (PPE) / Safety Gears for the purpose of the safety.
The Contractor shall submit the photograph, ID to the Owner prior to its
deployment of personal at the Owner’s plant(s).
The Contractor will fulfil all the requirements of statutory provision of the
Contract Labour (Regulation & Abolition) Act and Miscellaneous Provisions
Act, Minimum Wages Act, Workman Compensation Act, Industrial Disputes
Act, Bonus Act, ESI Act and other labour laws applicable to his job at his own
risk and cost in respect of persons employed by him. The Contractor shall
maintain the records required to be maintained under various laws and Owner
is indemnified against all such risks.
The Contractor shall discharge all his obligations under the any applicable /
labour / manpower related laws / rules / guidelines so far its affects personals
in his employment. The Contractor shall also be responsible for obtaining all
necessary work permit/ statutory licenses / permissions, if any, required for the
work / manpower.
The Contractor will take comprehensive insurance policy for adequate
amounts to cover its employees against third party risks, workman’s
compensation etc. and will keep Owner indemnified against all such risks.
The Contractor will keep Owner indemnified against all losses, damages,
claims, charges, etc. arising out of this Contract on account of any reason
The Contractor shall provide an organogram of the Head office and Local
offices responsible for carrying out the assignment / deployment of
Gardening/Cleaning/Horticultural personnel Owner’s plant(s) and shall inform
about any changes promptly to the Owner.
The Contractor shall ensure that all relevant licences pertaining to provision of
Gardening services have been obtained from relevant Government Authorities
before deployment of Gardening/Cleaning/Horticultural personnel at
respective sites. Owner will not be responsible for obtaining any permission
from any statutory/Government Authorities.
The Contractor shall ensure that it has in place detailed Gardening/ Cleaning/
Horticultural Standard Operating Procedure (SOP), if any, in place and the
same should cover actions required under various exigencies. It should cover
regular training required in combating various issue of HSE. The Contractor
must also specify as to how it would keep all Gardening/Cleaning/Horticultural
etc oriented/ updated with the SOP.
Tender for the Garden Maintenance Page 33 of
Gujarat State Energy Generation Ltd.
All the Gardening/Cleaning/Horticultural personnel shall be Civilian and of
the age not less than 18 yrs. And not more than 50 years.
The Contractor shall submit every month the proof of having deposited the
amount of contribution claimed by him on account of ESI & EPF towards the
persons deployed at Owner’s plant(s) in their respective names along with the
bill for the subsequent month. In case the contractor fails to do so, the bill will
not be process and paid by the Owner.
The Contractor shall particularly abide by the provisions of Minimum Wages
The Contractor shall be required to maintain permanent attendance register/roll
at the Owner’s plant(s) premises which shall be open for inspection and
checking by the authorized officers of the Owner.
The Contractor shall make the payment of wages, etc. to the persons so
deployed in the presence of representative of Owner and shall on demand
furnish copies of wage register/muster roll, etc.
The contractor shall deploy his persons in such a way that they get weekly rest.
The working hours/leave, for which the work is taken from them, do not violate
relevant provision of shops and establishment Act. The contractor shall in all
dealings with the persons in his employment have due regard to all recognized
festivals, days of rest and religious or other customs. In the event of the
contractor committing a default or breach of any of the provisions of the
Labour Laws including the provisions of Contract Labour (Regulation
Abolition) Act, 1970 as amended form time to time or furnishing any
information, or submitting or filling any statement under the provisions of the
said regulations and rules which is materially incorrect, he shall without
prejudice to any other liability pay to the Owner a sum as may be claimed by
Owner shall not be under any obligation for providing employment to any of
the worker of the contractor after the expiry of the Contract. Owner does not
recognize any employee employer relationship with any of the workers of the
contractor. The Contractor shall ensure full compliance with tax laws of India
with regard to this contract and shall be solely responsible for the same. The
Contractor shall submit copies of acknowledgements evidencing filing of
returns every year and shall keep the Owner fully indemnified against liability
of tax, interest, penalty etc. of the contractor in respect thereof, which may
Tender for the Garden Maintenance Page 34 of
Gujarat State Energy Generation Ltd.
3. Other Terms and Conditions
The responsibility of all types of applicable and required insurance coverage
for the Bidder’s personnel and material/equipment etc. deployed for the scope
of services shall rest with the Bidder and in no way Owner shall be responsible
for any liability / damages, whatsoever it may be.
Correspondence & language:
Bidder shall correspond in hard copies as well as through E-mail & fax etc. All
correspondence, reports Documents will in the English language only.
4. Submission of Invoice
The invoice in triplicate along with all required Documents complete in all
respects shall be submitted to the person designated by GSEG. Total work shall
be final inspection and approval by GSEG’s representative regarding quality and
performance. Contractor shall provide duly certified copies of work completion
by our representative at the time of submitting the bills.
5. Terms of Payment
The rate/ fees inclusive all taxes, duties, levy, etc shall be paid in accordance with
The quoted service charges as mentioned in Annexure 6, shall remain fixed for
entire term of work.
Service Charges shall include Bidder’s Mark-up and all Associates Costs for
performance & administration of the Contract / Services and Equipments,
tools and tackles, tractor cum driver cost used for services as per the tender
Total work shall be final inspection and approval by GSEG’s representative
regarding quality and performance. Contractor shall provide duly certified
copies of work completion by our representative at the time of submitting the
TDS or any other taxes, cess, duty, levy as applicable at the given point of time
will be deducted at source at actual at the prevailing rates at the time of release
of payment towards invoices.
Payment shall be made by GSEG within 30 days after submission of the
monthly invoice by the Contractor. The payment shall be made in Indian
Rupees only. Payment to the Gardeners should be made by first week of the
Tender for the Garden Maintenance Page 35 of
Gujarat State Energy Generation Ltd.
month, irrespective of release of payment of the invoice, into the Bank Account
of the Gardeners.
The Contractor is also required to submit their registration certificate with
Provident Fund in the first bill. Documents in support of the proof of deposit
of provident funds and other statutory dues, etc. of previous month will be
submitted along with the invoice.
Amount of GST and applicable cess will be kept under retention till submission
of documentary proof of payment of GST or till reflection of payment of GST
pertain to respective bill amount in GST return after due verification.
GST applicable towards forfeiting of EMD, Security Deposit and PBG and
charging of penalty including liquidated damages in accordance with the T&C
of the contract shall be in the scope of contractor / supplier.
No additional payment in addition to the price/Fees as above shall be paid for
any visit to GSEG Corporate Office, Site, Police station, offices of Statutory
6. Mode of Payment
Invoices complete in all respects, raised by the Bidder shall be paid online
through electronic transfer within Thirty (30) Days from the date of receipt of the
same by GSEG Corporate Office.
7. Term of Work/ Contract Period
The Term for the work order of Garden Maintenance, Horticultural, and cleaning
of plant premises shall be initially for a period of one year from the date of
acceptance of the work order; with a mid-review of your performance at the end
of one year. After successful completion of one year, the work order may be
reviewed and extended for a further period of one year on the same terms and
8. Performance Bank Guarantee
The successful Bidder shall furnish a performance security guarantee in the form
of a Bank Guarantee from a Scheduled Bank as per the format given in
Appendix 1, and shall be for an amount equal to 10% of the value of the total
Contract/Order value (of two years) for the term of the contract/order (i.e. valid
for 2 years and 45 days) within 10 days of the issuance of Work Order.
Failure of the Contractor to comply with the requirements of the tender document
Tender for the Garden Maintenance Page 36 of
Gujarat State Energy Generation Ltd.
during the contract period shall constitute sufficient grounds for encashing the
performance bank guarantee.
Bidder shall hold in confidence this assignment and all activities relating to the
Project, plant and all Documents and other information etc.
10. Literature, drawings & Documents
All reports, Documents/ registers prepared in connection with the services
hereunder shall at all stages be and remain the properties of Owner and while in
the custody of the Bidder shall be fully available to Owner and its duly authorized
representatives. On completion of the assignment, the entire
data/information/reports etc. mentioned here-in-above shall be delivered by the
Bidder to the Owner.
The English language will be used in all written communications between Owner
and the Bidder with respect to the services to be performed hereunder and with
respect to all Documents procured or prepared by the Bidder in connection with
This being a service(s) assignment, considering expertise, experience and
resourcefulness of the Bidder, all the services for the Garden Maintenance,
Horticultural, and cleaning of plant premises shall be provided by the Bidder. The
obligations, rights and liabilities of the Bidder shall not be assigned or transferred
by them to any third party.
13. Additional Scope of Works
If contractor during the course of completion of scope of work as mentioned in
this tender, requires/ recommends the owner for addition in scope of works
related to existing scope; than Owner may accept/ reject the same for whatsoever
reason. If accepted, Owner may issue another work order for additional/
amendment in scope of works as per the mutual agreed rates and conditions.
The Bidder shall indemnify the Owner in all respect of all claims, damages or
Tender for the Garden Maintenance Page 37 of
Gujarat State Energy Generation Ltd.
injury or damage to any representative of Bidder and / or property deployed at
GSEG plants during the term of this contract/order.
The Contractor shall make good all damages to the building, property,
equipments and articles, how so ever arising from the execution of the said
The Contractor shall indemnify and hold harmless the client, its directors /
officials etc. against all claims in respect of injury to any person how so ever
arising out of the services provided by the contractor.
The contractor shall further keep the Owner indemnified against any loss to
the Owner’s property and assets. The Owner shall have further right to adjust
and/or deduct any of the amounts as aforesaid from the payments due to the
contractor under this contract.
15. Cancellation / Termination
The Owner at its discretion reserves the right to cancel / terminate the contract
partly or wholly or reduce the scope of services, at its discretion, by giving
(ten) days notice without assigning reasons during the tenure of the contract,
which shall be binding to the Bidder and the Bidder shall be paid fees only for
the services provided by the Bidder.
Illegal Gratification: This contract can be terminated if any bribe, commission,
gift or advantage given, promised or offered by the contractor to any employee
The Owner may terminate the contract if it is found that the contractor is black
listed/ stop deal/ holiday list on previous occasions by the any of the
Departments/ Institutions/Local Bodies/Municipalities/ Public Sector
Undertakings, etc.
16. Governing Law
The Gandhinagar / Ahmedabad courts shall be the exclusive jurisdiction. In case
of the arbitration, the place of Arbitration shall be Gandhinagar/Ahmedabad.
17. Effective Date
The respective phases of this order will be effective only after receipt of
unconditional acceptance of the work order/ Letter of Intent and submission of
the Performance Bank guarantee.
18. Change in Law
Tender for the Garden Maintenance Page 38 of
Gujarat State Energy Generation Ltd.
Change in Law means, event of enactment, bringing into effect by any
Governmental Instrumentality or statutory authority for taxes, duties charges,
levies, etc. results in any change with respect to any tax or surcharge or cess
levied or similar charges on the final product/ service to be sold to GSEG.
In case of Change in Law as defined above, results change in the Seller's selling
price of final product/ service, to the Owner, it shall be accordingly increased or
The Seller, shall provide with a certificate stating that the adjustment in the
selling price of the final product/ service, is directly as a result of the Change in
Law and shall provide supporting documents to substantiate the same and such
certificate shall correctly reflect all increases or decreases till the date of such
Tender for the Garden Maintenance Page 39 of
Gujarat State Energy Generation Ltd.
Tender for the Garden Maintenance Page 40 of
Gujarat State Energy Generation Ltd.
1. Scope of work of a Contractor under contract of Garden Maintenance,
Horticultural, and cleaning of plant premises
The scope of services includes following, but is not limited to:
1.1. Watering to all lawns and gardens, plastic flower pots, built-in-flower pots,
live hedges, plants, trees, etc., in the specified area.
1.2. Cutting/trimming of grass at regular intervals of time to give uniform look in
all lawns/ gardens.
1.3. Trimming and shaping of hedges and plants in approved pattern/ fashion/
design in all the gardens.
1.4. Removing old plants from the flower pots and planting new ones. Preparation
and maintenance of flower pots. Numbering of tress and flower plants etc.
1.5. Providing fertilizers, red earth, and chemicals for grass, plants, trees, etc. as
and when required.
1.6. Overall maintenance of all gardens, trees and pots in a very presentable
manner to give an aesthetic look to the plant premises.
1.7. All works pertaining horticulture like irrigating gardens, trimming and
shaping of hedges, plants, trees, maturing and maintenance to be carried out
and should be supervised by the contracting agency.
1.8. Weeding out wild plants, grass, shrubs, etc. from the gardens and flower pots
and other areas of plant premises. Removing of unwanted grass, plants, etc.
from the sides of the roads adjoining the gardens to keep the roads in a neat
and cleaned condition.
1.9. Spraying necessary chemicals to trees, plants, grass, etc. as and when required.
1.10. Regular removal of climber or shrubs from Plant equipment area, Plant
fencings, All buildings of plant and colony, Colony and Guest House fencing,
Plant Boundary and 220KV Towers.
1.11. Unwanted shrubs or plants removal to be carried out from all building walls
and terraces of plant.
1.12. Plant equipment areas must be clear from bushes and vegetation. Grass size
in plant or in colony or around plant office area must be lower than 2”.
1.13. Vendor should ensure to grass cut should not enter into storm water trenches
and CMB (Common Monitoring Basin). Cleaning of trenches from the grass
carried by breeze and Disposal of grass cut from site on immediate basis.
1.14. Trimming of Full-grown trees along the plant boundary and around plant
equipment or buildings or structures.
1.15. Daily work plan with resources engaged to be provided to EHS or Admin
1.16. One exclusive supervisor must be available at site for planning, supervision
Tender for the Garden Maintenance Page 41 of
Gujarat State Energy Generation Ltd.
during work execution and to coordinate with plant EHS or admin department.
1.17. Experienced staff to be engaged for grass, shrubs or bushes cutting in the plant
equipment areas for safety reasons. It is preferable that manual grass cutting
carried out in plant equipment or buildings area.
1.18. Green belt area cleaning (removal of broken branches, dry leaves etc.) to be
carried out regularly for safety reasons.
1.19. Proper cleaning of plant premises with necessary manpower, equipment, tools
1.20. Disposal of Garbage and filth at nearby area as designated by Owner.
1.21. The Contractor shall provide following machines and trained operators
amongst labour to handle this machines:
1.21.1. Honda Make or Equivalent make Bush Cutter (Min. 3Nos- ) (Heavy
Duty), liquid fuel operated
1.21.2. Honda Make or Equivalent make Hedge Trimmer (Min. 2Nos- ) (Heavy
Duty), liquid fuel operated.
1.21.3. Honda Make or Equivalent make Lawn Movers ( 1 Electric & 1 Liquid fuel operated
1.21.4. Medium Wood cutter 02 nos. liquid fuel operated and heavy wood cutter
liquid fuel operated.
1.22. The Contractor shall have the following equipments, implements, accessories
in sufficient quantities at their disposal available at site during the entire
maintenance period, but not limited to:
1. Pick axe 9. Wheel barrow
2. Spade 10. Hose pipe
3. Crow bar 11. Adjustable water spray guns
4. Gudli 12. Hard brooms
5. Cane baskets 13. Rain Coats
6. Iron pan 14. Secateurs
7. Khurpis 15. Garden Shears
8. Water cans 16. Sprayer-9L capacity
1.23. During repair or break down of any of equipment or machine, the contractor
has to replace equipment or machine on immediate basis for the period. No
excuse for non-availability of equipment or machine at any point of time
would be acceptable.
Tender for the Garden Maintenance Page 42 of
Gujarat State Energy Generation Ltd.
2. Location of Works- Plot Plan is attached separately - (Estimated total area of
dark green and light green)
Dimension in Daily Manpower
Sr.no Area Detail Sq.m Requirement
Colony Admin & Gate-1
1 outside area 13500
CW pump house to H2SO4
Hydrogen room surrounding
Air monitoring room near
2 BHEL store area 7980
Raw water area (156.1 MW)
Raw water area (351.43
Cooling tower (156.1 MW)
4 Switch yard opp. Green belt 22000
Control room to HRSG
5 DM tank 16445
TG building surrounding
DG building (351.43 MW)
6 Cooling tower (351.43 MW) 4590
7 Green Belt 48870
2.1. In addition to above,manpower-2nos. daily required for cut grass removal,
loading to tractor for disposal and cleaning the areas from dry leaves and
Tender for the Garden Maintenance Page 43 of
Gujarat State Energy Generation Ltd.
remnant grass etc.
2.2. Over and above, there is daily requirement of one supervisor from contractor
side and tractor along with driver for disposal .
2.3. Total manpower requirement will be 1.5times during monsoon (Mid June to
Mid September period) exclusive of additional supervisor or tractor driver.
2.4. Specified manpower requirement is indicative, contractor has to maintain the
total area as per the terms and conditions of tender and should include cost of
manpower , tools and tackles and cost of operation and maintenance of tools
and required safety gadgets to manpower.
3. Manpower required as below:
Sr. No. Description Quantity
1 Labour for cleaning
Additional labour during
3 monsoon for 4 months a year
Tender for the Garden Maintenance Page 44 of
Gujarat State Energy Generation Ltd.
Format of Performance Bank Guarantee
(To be stamped in accordance with Stamp Act)
Bank Guarantee No.............
[OWNER's Name & Address]
In consideration of the....... [OWNER's Name]........ (Hereinafter referred to as the
‘OWNER’ which expression shall unless repugnant to the context or meaning
thereof, include its successors, administrators and assigns) having awarded to
M/s...... [Contractor's Name]............ with its Registered /Head Office
at............................ (Hereinafter referred to as the ‘Contractor’, which expression
shall unless repugnant to the context or meaning thereof, include its successors
administrators, executors and assigns), a Contract by issue of OWNER’s
Notification of Award No. ................ dated........... and the same having been
unequivocally accepted by the Contractor, resulting into a Contract bearing
Contractor having agreed to provide a Contract Performance Guarantee for the
faithful performance of the entire Contract equivalent to 10% ( ten percent) of the
said value of the Contract to the OWNER.
We ................[Name & Address of the Bank]..........having its Head Office
at...........................(hereinafter referred to as the ‘Bank’, which expression shall,
unless repugnant to the context or meaning thereof, include its successors,
administrators, executors and assigns) do hereby guarantee and undertake to pay the
OWNER, on demand any and all monies payable by the Contractor to the extent
of ..................(*).................... as aforesaid at any time upto
.........................(@)...................... [days/month/year] without any demur,
Tender for the Garden Maintenance Page 45 of
Gujarat State Energy Generation Ltd.
reservation, contest, recourse or protest and/or without any reference to the
Contractor. Any such demand made by the OWNER on the Bank shall be conclusive
and binding notwithstanding any difference between the OWNER and the
Contractor or any dispute pending before any Court, Tribunal, Arbitrator or any other
authority. The Bank undertakes not to revoke this guarantee during its currency
without previous consent of the OWNER and further agrees that the guarantee
herein contained shall continue to be enforceable till the OWNER discharges this
The OWNER shall have the fullest liberty, without affecting in any way the liability
of the Bank under this guarantee, from time to time to extend the time for
performance of the Contract by the Contractor. The OWNER shall have the fullest
liberty, without affecting this guarantee, to postpone from time to time the exercise
of any powers vested in them or of any right which they might have against the
Contractor, and to exercise the same at any time in any manner, and either to enforce
or to forbear to enforce any covenants, contained or implied, in the Contract between
the OWNER and the Contractor or any other course or remedy or security available
to the OWNER. The Bank shall not be released of its obligations under these
presents by any exercise by the OWNER of its liberty with reference to the matters
aforesaid or any of them or by reason of any other act or forbearance or other acts of
omission or commission on the part of the OWNER or any other indulgence shown
by the OWNER or by any other matter or thing whatsoever which under law would,
but for this provision, have the effect of relieving the Bank.
The Bank also agrees that the OWNER at its option shall be entitled to enforce this
Guarantee against the Bank as a principal debtor, in the first instance without
proceeding against the Contractor and notwithstanding any security or other
guarantee that the OWNER may have in relation to the Contractor’s liabilities.
Notwithstanding anything contained hereinabove our liability under this guarantee
is restricted to .........................(*)......................... and it shall remain in force upto
and including .....................(@)...................... and shall be extended from time to
time for such period (not exceeding one year), as may be desired by M/s
.......[Contractor's Name] ............ on whose behalf this guarantee has been given.
Dated this ……………………. day of 20…… at…………………
Tender for the Garden Maintenance Page 46 of
Gujarat State Energy Generation Ltd.
(Signature) (Signature)
(Official Address) (Designation with Bank.. Stamp)
Attorney as per Power of Attorney
1. (*) This sum shall be ten percent (10%) of the total Contract Price for two
(@) This date will be forty five (45) days beyond the end of term of the
Contract as specified in the Contract.
2. The Bank Guarantee from a scheduled Bank in India is acceptable to the
3. The stamp papers of appropriate value shall be purchased in the name of
guarantee issuing Bank.
Tender for the Garden Maintenance Page 47 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2026 03 27 Tender for Garden Maintenance.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .