Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC BHAGWATI NAGAR JAMMU | 1 | Accepted-AOC L1 | |
| 2 | 2₹2.5 L+₹7,400 (3.01%)Rejected-AOC BHAGWATI NAGAR JAMMU | 2 | Rejected-AOC L2 | |
| 3 | 3₹2.6 L+₹16,200 (6.59%)Rejected-AOC 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 3 | Rejected-AOC L3 |
Tender Value
₹2.7 L
Closing Date
6 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowsh
Strengthening of 2.5 MVA Automatic Voltage Regulatory (AVR) alongwith allied works at L.I.S. Rajal.
2021_IFC_149637_1
111/MID/AN
Open Tender
Electrical and Maintenance Works
Item Wise
20 days
Rajal
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
11 Jan 2022
23 Nov 2021
7 Dec 2021
23 Nov 2021
6 Dec 2021
24 Nov 2021
26 Nov 2021
180 days
Strengthening / Improvement of 2.5 MVA Automatic Voltage Regulator (A.V.R) along with allied works at Lift Irrigation station Rajalby way of disconnecting the power cables from the main H.T. Transformer, also disconnecting the damaged/burnt out cables between the main transformer and the regulating unit then drawing out of VCB from the breaker chamber, isolating all the three isolating units also disconnecting & removing the burnt out auxiliary control circuit wiring of pilot motor box. Dismantling of top tank cover, taking out off hand wheel after disengaging the motor driver from the regulator, disconnecting the burnt out flexible cables from the tank terminal board, Lifting of all the three limbs (legs) along with contact bar with the help of crane and shifting the same in the main hall of Rajal Pump House, lowering the same on a drip tray and allowing it to drain reasonably. Disconnecting the burnt out interconnections among small 12 No. transformers of the regulating unit along with extracting out 03 No. damaged small transformers along with the remaining nine number transformers to the safer area. Cleaning out the nine number small transformers with the help of cleaning chemicals and varnishing with Dr. Beck’s varnish and drying out in air. The job includes extracting out burnt/ damaged& then winding out of three number burnt out small transformers and rewinding the same out of copper strips as per sample and varnishing the same with Dr. Beck’s varnish. Refitting the twelve number small Transformers after repairs/ rewinding and interconnecting the same with 35 Sq. mm Copper cable with proper thimbling as per the drawing after replacing the Bakelite sheets as per the sample in the regulating unit of the AVR. Replacing the roller assemblies which do not rotate smoothly or damaged/ worn out, carbon brushes, as and where needed. Checking that all the roller assemblies run freely on the spindle and carbon brushes on the coils with a minimum play, replacing the rotate plate locking with screws and maintaining the brush lead position. The job also involves replacement of bush rods, cups, bushes etc. of the regulating unit before make connections. Cleaning and smoothing the marked/pitted portion on coil’s surface carefully with grade ‘O’ emery cloth by rubbing gently around the coil’s surface in the direction of winding. Every precaution should be taken that no copper dust is lodged between the turns of coils and that all copper dust produced is removed from coil’s surface and frame work with clean rags and white sprit. Lifting the complete unit and lowering it in the main tank of the regulating unit with the help of crane in such a way that no part/ component is disturbed/ damaged. Refilling of oil after dehydration with providing and topping of additional oil for topping (additional oil approximately 100 litres), making of connections of flexible cables, re-fitting of tank cover, motor box after replacing the gaskets,insulators with studs, nuts and bolts, making of connections of all the control circuit wiring and then refitting the top cover. Making of all the connections of control circuit wiring, after replacing the burnt out 12 No. 185 Sq. mm Aluminium cables after proper thimbling interconnecting cables of main transformer and regulating unit. Job includes testing & commissioning on no load and on full load, Complete job includes cost of material used for strengthening of 2.5 MVA AVR with cost of additional oil required for topping, also skilled & semi skilled labour charges, also hire charges for deployement of crane,tools & tackles at site. Complete Job.
BEE AAR ENTERPRISES
NATIONAL ELECTRO-MECH COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .