Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.1 LAccepted-AOC KAROTTUKOCHUPARAMBIL H MOONGALAR PO IDUKKI | IDUKKI | IDUKKI | KERALA | ₹8.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹8.2 L+₹7,474.40 (0.92%)Rejected-Finance NADUPILAKAL VADIKKETH CHOTHAYIL ROAD THODIYOOR | KANNUR | KERALA | 670511 | ₹8.2 L+₹7,474.40 (0.92%) | 2 | Rejected-Finance L2 |
Tender Value
₹7.5 L
EMD Value
₹18,690
Closing Date
1 Jul 2026, 6:00 pmClosed
Deputy Director
Deputy Director, Periyar Tiger Reserve West Division , Peermade 685531
Construction of Tower for Real Time Monitoring System at Pampamala in Pachakkanam FS during 2026-27 .
2026_FD_857351_1
A3-881/26
Open Tender
Civil Works - Others
Percentage
120 days
Pachakkam in Pampa Range
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,855
Yes
₹18,690
Yes
9 Sept 2026
23 Jun 2026
3 Jul 2026
23 Jun 2026
1 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | OD47670/2026-2027:Earthwork in excavation by manual means in hill/forest terrain in hard soil mixed with small rock fragments, including excavation and incidental handling, complete, executed under restricted site conditions with no scope for mechanical means, resulting in reduced labour productivity and increased manual effort. | - | cum | 1,302.92 | - |
| 2 | 60.5.1:DOWEL BARS - Supplying and providing MS dowel bars of size 20 mm dia , 1.5m long (1m in rock and 0.5 m in concrete ) including drilling holes of 25mm dia and filling the gap with cement grout ( 0.25kg/each) etc complete | - | each | 595.67 | - |
| 3 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 8,569.14 | - |
| 4 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.4 | kilogram | 112.43 | ₹44.97 |
| 5 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 9,963.93 | - |
| 6 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 0.8 | kg | 140.41 | ₹112.19 |
| 7 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | - | kg | 194.27 | - |
| 8 | OD25922/2026-2027:Providing and threading of MS anchor rods of specified diameter including cutting to length, machining of threads to required length, finishing, and making suitable for fixing with nuts and washers, complete. | - | each | 165.99 | - |
| 9 | OD25916/2026-2027:Providing and hot dip galvanizing of structural steel members including surface preparation by degreasing, pickling in acid, rinsing, fluxing, drying and dipping in molten zinc to achieve uniform zinc coating of required thickness, including finishing, handling and transportation to and from galvanizing plant, complete as per relevant IS codes (IS 4759).
with minimum zinc coating of 610 g/sqm (or specified) | - | kg | 70.06 | - |
| 10 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | - | sqm | 252.95 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 1.08 MB
Tendernotice_3.pdf
PDF • 0.13 MB
Tendernotice_4.pdf
PDF • 0.34 MB
BOQ_1449267.xls
BOQ • 0.35 MB
Date.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .