Tender Value
₹12.5 Cr
EMD Value
₹25.0 L
Closing Date
28 Feb 2026, 6:00 pmClosed
CE, MDA
MDA Office, Sec-13, New Moradabad
Civil Work
2026_MDA_1115276_1
24/MDA/CE/2025-26
Open Tender
Civil Works
180 days
Moradabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
CAO
₹25.0 L
12 Feb 2026
12 Feb 2026
5 Mar 2026
12 Feb 2026
28 Feb 2026
12 Feb 2026
Sector 01 - Drainage Works Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. D.S.R. 2023 Item No. 2.8.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) D.S.R. 2023 Item No. 4.1.8
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) RCC Work for Raft Footing, Drain Walls, Culverts Slab. D.S.R. Item No. 5.1.2
Steel reinforcement for R.C.C. work including straightening, cutting, bending, plascing in position and binding all complete upto plinth level mild steel & medium tensile steel bars. Analysis as per MDA
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete DSR 2023 Item No. 5.9.1
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. DSR 2023 Item No. 5.9.2
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform DSR 2023 Item No. 5.9.3
Sector 01 - Electric Trench Works Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. D.S.R. 2023 Item No. 2.8.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) D.S.R. 2023 Item No. 4.1.8
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) RCC Work for Raft Footing, Drain Walls, Culverts Slab. D.S.R. Item No. 5.1.2
Centering & shuttering including strutting propping etc. and removal of form work for walls (any thickness) including attached plateris, butteresses plinth and string couse etc. DSR 2023 S.I. 5.9.2)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, plascing in position and binding all complete upto plinth level mild steel & medium tensile steel bars. Analysis as per MDA
Sector 02 - Drainage Works Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. D.S.R. 2023 Item No. 2.8.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) D.S.R. 2023 Item No. 4.1.8
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) RCC Work for Raft Footing, Drain Walls, Culverts Slab. D.S.R. Item No. 5.1.2
Steel reinforcement for R.C.C. work including straightening, cutting, bending, plascing in position and binding all complete upto plinth level mild steel & medium tensile steel bars. Analysis as per MDA
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete DSR 2023 Item No. 5.9.1
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. DSR 2023 Item No. 5.9.2
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform DSR 2023 Item No. 5.9.3
Sector 02 - Electric Trench Works Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. D.S.R. 2023 Item No. 2.8.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) D.S.R. 2023 Item No. 4.1.8
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) RCC Work for Raft Footing, Drain Walls, Culverts Slab. D.S.R. Item No. 5.1.2
Centering & shuttering including strutting propping etc. and removal of form work for walls (any thickness) including attached plateris, butteresses plinth and string couse etc. DSR 2023 S.I. 5.9.2)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, plascing in position and binding all complete upto plinth level mild steel & medium tensile steel bars. Analysis as per MDA
Sector 03 - Drainage Works Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. D.S.R. 2023 Item No. 2.8.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) D.S.R. 2023 Item No. 4.1.8
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) RCC Work for Raft Footing, Drain Walls, Culverts Slab. D.S.R. Item No. 5.1.2
Steel reinforcement for R.C.C. work including straightening, cutting, bending, plascing in position and binding all complete upto plinth level mild steel & medium tensile steel bars. Analysis as per MDA
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete DSR 2023 Item No. 5.9.1
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. DSR 2023 Item No. 5.9.2
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform DSR 2023 Item No. 5.9.3
Sector -03 - Electric Trench Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. D.S.R. 2023 Item No. 2.8.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) D.S.R. 2023 Item No. 4.1.8
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) RCC Work for Raft Footing, Drain Walls, Culverts Slab. D.S.R. Item No. 5.1.2
Centering & shuttering including strutting propping etc. and removal of form work for walls (any thickness) including attached plateris, butteresses plinth and string couse etc. DSR 2023 S.I. 5.9.2)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, plascing in position and binding all complete upto plinth level mild steel & medium tensile steel bars. Analysis as per MDA
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
TDfor04.pdf
Tender Documents • 2.59 MB
BOQ_2069104.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid