Loading…
Loading…
Tender ID
Tender Value
₹67.4 L
EMD Value
₹68,000
Closing Date
10 Feb 2026, 6:00 pmClosed
Executive Engineer, Panchayat (R & B) Division Rajkot.
Construction of Minor Bridge on Sajadiyali ToRangpar Road (MDR) Km.0/000 to 0/100 Ta.Jamkandorana, Dist.; Rajkot (Package NO. RAJ/MMGSY/SCSP/2025-26/P.22)
269967
Nivida no. 35 2025-26
Open
Civil Works - Bridges
Works
Rajkot
7 documents required · 7 mandatory
₹2,400
Yes
Executive Engineer Panchayat R&B Division Rajkot
₹68,000
Yes
27 Jan 2026
27 Jan 2026
27 Jan 2026
10 Feb 2026
27 Jan 2026
Name of work :- Construction of Minor Bridge on Sajadiyali To Rangpar Road (MDR) Km.0/000
to 0/100 Ta.Jamkandorana, Dist.; Rajkot (Package NO. RAJ/MMGSY/SCSP/2025-26/P.22)
BILL OF QUANTITIES
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
1 Earthwork for embankment including 179.40 One 165.42
breaking clods, dressing with all lead and lift Cum
(Excluding watering and consolidation) (A)
Selected soil should be From borrow area
with all lead and lift and should have CBR
not less than 6.00%.
2 WBM Grading-2 24.90 One 1461.57
Providing, laying, spreading and compacting Cum
stone agg. Of 63mm to 45mm size to water
bound macadam specification including
spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-
100 KN in stage to proper grade and camber,
applying and brooming, stone
screening/binding material to fill-up the
intersties of coarse agg., watering and
compacting to the required density grading-
2 as per Technical Specification Clasue.405
By menual means.
3 Rolling and Watering of earthwork with 179.40 One 23.41
vibratory roller including filling in Cum
depression which occur during the process
and as directed.
4 Excavation of foundation in hard murrum 547.90 One 640.44
and boulders and very stiff or sticky clays Cum
and other similar strata including shorting
out and struting and dewatering as
necessary and disposing of the excavated
stuff as directed.
5 Excavation in large boulders and soft rock by 134.90 One 750.68
wedging including shoring, strutting and Cum
dewatering as necessary and disposing of
the excavated stuff as directed,
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
6 Excavation in hard rock by dry-wet blasting 60.00 One 1755.07
and chiseling including dewatering Cum
preparing foundation base by proper
benching and stepping and disposing of the
excavated stuff as directed (B) Blasting
7 Providing and fixing Mild steel dowel bar of 60.00 One 450.06
minimum 32mm dia. For anchoring by Rmt.
drilling holes in foundation strata including
necessary bending, hooking of dowel bars
and grouting the holes complete as per
detailed drawing and as directed.
8 Providing and casting in situ ordinary 80.40 One 3935.98
cement concrete M-150 mix and providing Cum
necessary pin headers including shuttering,
scafilding, laying vibrating, curing and
finishing complete Without V-Grooves For
9 Providing and filling in foundation with 68.10 One 3359.92
ordinary cement concrete M-100 mix and Cum
providing necessary vertical pin headers
incl. Formwork, vibrating, ramming and
curing complete.
10 Providing parapet of ordinary cement 49.00 One 1078.36
concrete M-200 as per detailed drawing with Rmt.
necessary reqinforcement including
shuttering laying vibrating and finishing to
line and level complete (ii) cast in situ.
11 Providing and casting in situ Controlled 535.00 One 5173.92
cement concrete M-200 for R.C.C. work in Cum
Piers, abutment, returns and riding returs as
per drawing including centering, shuttering,
scafolding where neccesary laying, vibrating
curing and finishing complete (A) For all
12 Providing and casting in situ Contolled 30.20 One 5253.75
Cement concrete M 20 mix for R.C.C. works Cum
in pier cap, abutment cap, and dirt wall
including controlled cement concrete M
bed block or pedestals for required size
below bearings as per detailed drawings,
centering, shuttering, scaffolding wherever
necessary laying, vibrating, curing and
finishing complete.
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
13 Providing and casting in situ Controlled 95.10 One 5242.73
cement concrete M 25 for R.C.C. Solid slab Cum
including centering, scaffolding, curing and
finishing complete.
14 Providing and casting in situ Contolled 54.60 One 5247.13
cement concrete- M-200 for average Cum
75/150mm thick wearing coat laid as
directed incuding. tamping, vibrating,
finishing, curring and filling in joints with
bitumen complete.
15 Providing and casting in situ Contolled 16.70 One 5105.29
cement concrete- M-200 mix for Approach Cum
slab including formwork, curing and
finishing complete.
16 Providing and casting in situ Controlled 6.20 One 4820.44
cement concrete- M-20 mix for kerbs/Kerb Cum
blocks including formwork,curing and
finishing complete.
17 Providing and laying weep hole in 35.00 One 90.82
Abutment and returns by using A.C pipe of No
100mm. Incl. fixing in proper grade and
jointing the complete as per detailed
18 Providing and laying filter media 600mm. 54.00 One 1298.37
thick directed at the back of abutments, Sqm
returns and wing walls as per detailed
specifications.
19 Providing and fixing in position Mild steel 24.00 One 341.28
dowel bars in pier cap or abutment caps for No
anchorage in fixed end as per detailed
drawings including cutting bending and
welding complete.
20 Providing and fixing in position Mild steel 24.00 One 399.69
dowel bars in pier cap or abutment caps for No
anchorage in free end as per detailed
drawings including cutting bending and
welding complete.
21 Providing and laying in Position FE - 5.300 One 73858.69
500/500D TMT bar reinforcement including MT
cutting, bending, hooking and tying
complete as per detailed drawings for the
following (A) Piers (B) Abutments (C)
Returns (D) Walls etc.
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
22 Providing and Fixing in position FE- 9.500 One 73243.01
500/500D TMT bar reinforcement including MT
cutting, bending, hooking, and tying
complete as per detailed drawaing (A)RCC
kerb (B) RCC Footpath (B) RCC Solid Slab/
App. Slab / Wearing coat.
23 Providing 12mm. Thick Pre-moulded asphalt 19.80 One 703.52
filler joints as per drawings Sqm
24 Providing G.I. 100mm. Diameter water 16.00 One 536.02
spouts including necessary iron gratings as No
25 Filling available excavated earth (excluding 341.40 One 137.47
rock ) in trenches plinth sides of foundation Cum
etc. in layers not exceeding 20cm in depth
consolidating each deposited layer by
ramming and watering.
26 Dismantling the existing structure including 162.50 One 974.66
removing and stacking the dismantled Cum
materials as and where directed. RCC Work.
27 Dismantling G.I. Pipes G.S.W. Pipes and A.C 15.00 One 80.32
Rain water pipes with fitting and clamps Rmt.
including stacking the materials with all
lead and lift (for any of pipe)
28 Providing temporary all weather and fair 75.00 One 1104.53
weather diversion suitable for traffic during Rmt.
the construction period of the bridge / Slab
drain including providing necessary drains
and all safety measures including red lamps
/ signals at night for traffic etc. complete..
29 Providing and erecting a "W" metal crash 46.00 One 3723.46
barrier comprising of 3mm thick currugated Rmt.
sheet metal beam rail, 70cm above
Road/Ground level, fixed on ISMC series
channel vertical post, 150x75x5mm spaced
2m center to center, 1.8m high, 1.1m below
ground/road level, all steel parts and
fitments to be galavanized by hot dip
process, all fittings to conform to IS:1367 and
IS:1364 metal beam rail to be fixed on the
vertical post with a spacer of channel section
150x75x5mm, 330mm long complete as per
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
Rupees Sixty Seven Lakh(s) Forty One Thousand Two Hundred Fifty Four And
Paise Eight Only
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow percent
( Should be written in figures and words ) of the estimated rate mentioned above. Amount of My
\ Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
NOTE: Amount Rs.63241/- Of Dismentalled materials shall be recovered from 1st R.A. bill of Contractor at once.
Signature of Contractor.
Deputy Executive Engineer Executive Engineer
Panchayat R&B Sub Division Panchayat R&B Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Sajadiyali-MM-SC-CtoB-Kandorna.pdf
8.GR SBD.pdf
9.Envirement MMGSY.pdf
Nivida no. 35 2025-26.pdf
Schedule B .pdf
Speci Sajadiyali-MM-SC-CtoB-Kandorna.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .