Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹2.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹2.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.7 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.7 L
EMD Value
₹5,436
Closing Date
12 Aug 2026, 6:00 pmClosed
Executive Engineer REW Baramulla
Executive Engineer REW Baramulla
CONSTRUCTION OF P BUND FOR GRAVEYARD AT RATHER MOHALLAH WARD NO. 5 HALQA BONIYAR BLOCK BONIYAR YEAR 2026-27SCHEME CDF
2026_RDPR_317619_24
154/Xen/Rew/Bla/2026-27 Dated 24/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹5,436
28 Aug 2026
24 Jul 2026
13 Aug 2026
24 Jul 2026
12 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc (not exceeding 1.5 m in width) and for shafts, wells , cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | 39.62 | CUM | 479.3 | ₹18,989.87 |
| - | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand)- Nallah | 22.98 | CUM | 5,402.9 | ₹1,24,158.64 |
| - | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone- Nallah | 29.3 | CUM | 2,793.8 | ₹81,858.34 |
| - | Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) | 31.69 | SQM | 297 | ₹9,411.93 |
| - | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete. | 8.55 | SQM | 346.7 | ₹2,964.29 |
| - | Carriage of sand and Bajree MT 35 km and H/l 50 mtr | 8.74 | CUM | 776.17 | ₹6,783.73 |
| - | Carriage of Stones MT 5km and H/L 50 mtr | 52.27 | CUM | 472.24 | ₹24,683.98 |
| - | P/f Inforamtion board | 1 | JOB | 2,950 | ₹2,950 |
stage.html
html • 0.02 MB
finance_1041897.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1041897.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].