Tender ID
Tender Value
₹38.6 L
EMD Value
₹39,000
Closing Date
11 Mar 2026, 6:00 pmClosed
Executive Engineer, Panchayat Road and Building Division, Morbi
Construction of Fabrication Bus Stand At Various Villages of Wankaner Taluka Package No.2, Dist.; Morbi (Under M.P.Grant-2025-26)26)(Shree Keshridevsinhji Zala) - Bherda ,Hasanpar, Dighaliya , Kalavadi , Kankot , Khakhana , Chandrapar , Thikariyala , Amarsar
282648
57 /2026
Open
Civil - All
Works
Morbi
8 documents required · 8 mandatory
₹1,500
Yes
Executive Engineer, Panchayat Road and Building Division, MORBI
₹39,000
Yes
3 Mar 2026
3 Mar 2026
3 Mar 2026
11 Mar 2026
3 Mar 2026
Name of work :- Construction of Fabrication Bus Stand At Various Villages of Wankaner Taluka
Package No.2, Dist.; Morbi (Under M.P.Grant-2025-26)
BILL OF QUANTITIES
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
1 Excavation for foundation upto 1.5m depth 22.50 One 267.08
including sorting out and stacking of useful Cum
materials and disposing of the excavated
stuff upto all lead. (C) Hard Murrum
2 Providing and laying cement concrete 1:2:4 1.35 One 3784.74
(1- Cement : 2Coarse sand : 4- graded stone Cum
aggregates 20 mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth
3 Providing and laying ordinary cement 6.48 One 6117.20
concrete 1:1.5:3 (1 cement, 1.50 sand, 3 Cum
graded stone aggregates 20 mm. Nominal
size) and finishing smooth with curing etc.
complete excluding cost of form work and
reinforcement for reinforced cement concrete
work in in A) Foundations, footings, base of
columns and mass concrete
4 Filling in foundation and plinth with 81.00 One 301.78
murrum or selected soil in layers of 20cm. Cum
thickness including watering, ramming and
consolidating etc. complete.
5 Brickwork using common brunt clay 11.70 One 4214.33
building bricks having crushing strength not Cum
less than 35kg/sqm in foundation and plinth
in cement mortar 1:6 (1,cemen,6,Fine sand)
Convetional Bricks.
6 Providing TMT Bar FE 500/500D 522.00 One 77.29
reinforcement for R.C.C. work including Kg.
bending, binding and placing in position
complete upto floor two level
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
7 Providing, fabricating, supplying, installing, 9.00 One 410847.80
testing, and commissioning of Powder Nos
coated MS Pick-Up Stand with Seating
Arrangement, including excavation and RCC
foundation (M25 grade concrete) with
required reinforcement steel (Fe500D) and
PCC (1:3:6) base; fixing Base plate
(300x300x10 mm) anchored by anchor bolts;
vertical supporting fabricated poles by 4MM
plate; roof rafters fabricated from 3MM
plates; purlin of RHS 40 X 20 mm; Back side
cladding frame of RHS 40 X 20mm; Back side
cladding by 1mm thick perforated sheet
(20x4 ft); side railing of RHS 40 X 20mm;
Front railing of 40 OD pipe; seating
arrangement made by 3mm plates; Name
board frame of SHS 20 X 20mm & covered by
1mm sheet (size is 3000 x 300 mm); Roofing
sheet 10mm multiwall Polycarbonate (20x7
ft) with adequate slope and aluminium patti
finishing; including all materials, labour,
transportation, loading/unloading, safety
measures, installation, testing,
commissioning, handing over, and three-
year defect liability period complete as per
Rupeesspecifications, drawings,
Thirty Eight Lakh(s) and
Sixty engineer-in-
Two Thousand Four Hundred Eighty Five And
Paise Fifty Eight Only
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow percent
( Should be written in figures and words ) of the estimated rate mentioned above. Amount of My
\ Our tender works put as under.
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Signature of Contractor.
Deputy Executive Engineer Executive Engineer
Panchayat R&B Sub Division Panchayat R&B Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 SBD BUS STAND MORBI P.02.pdf
2 SPECI. BUS STAND P02.pdf
3 Sch-B.pdf
4 Drawngs of Bus Stand.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .