| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance | L1 | Accepted-Finance Financial Bid Open | |
| 2 | L2₹11.6 L+₹3,429.64 (0.30%)Rejected-Finance | L2 | Rejected-Finance Financial Bid Open | |
| 3 | L3₹11.6 L+₹7,564.08 (0.65%)Rejected-Finance 00 BHADAR TIKARMAFI BAZAR SULTANPUR UTTAR PRADESH 227413 | AMETHI | UTTAR PRADESH | 227413 | L3 | Rejected-Finance Financial Bid Open | |
| 4 | Rejected-Technical | - | Rejected-Technical Check List point 10 is wrong | |
| 5 | Rejected-Technical | - | Rejected-Technical Check List point 10 is wrong |
| Sl No | Description | Qty | Unit | MEHFOOZ HASAN CONTRACTIOR L2 | M/S SUBHASH CHAND CONTRACTOR L1 | DEV ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete. | 130.52 | M3 | 64 ₹8,353.28 | 61 ₹7,961.72 Lowest | 63.5 ₹8,288.02 |
| 2.00 | Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. | 23.71 | M2 | 245 ₹5,808.95 | 241 ₹5,714.11 Lowest | 244.5 ₹5,797.1 |
| 3.00 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | 18.65 | M3 | 5,945 ₹1,10,874.25 | 5,941 ₹1,10,799.65 Lowest | 5,950.7 ₹1,10,980.56 |
| 4.00 | M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | 84.02 | M3 | 5,475.15 ₹4,60,022.1 | 5,471 ₹4,59,673.42 Lowest | 5,477 ₹4,60,177.54 |
| 5.00 | Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete. | 40.65 | M2 | 683 ₹27,763.95 | 651 ₹26,463.15 Lowest | 685.1 ₹27,849.32 |
| 6.00 | R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete. | 16.96 | M3 | 7,387.1 ₹1,25,285.22 | 7,351 ₹1,24,672.96 Lowest | 7,388 ₹1,25,300.48 |
| 7.00 | Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete | 1.4 | MT | 97,250.5 ₹1,36,150.7 | 97,211 ₹1,36,095.4 Lowest | 97,500 ₹1,36,500 |
| 8.00 | P.C.C.1:6:12 in back filling of Abutment including all cost of material, labour and T&P etccomplete. | 10.47 | M3 | 5,510 ₹57,689.7 | 5,501 ₹57,595.47 Lowest | 5,513 ₹57,721.11 |
| 9.00 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | 87.22 | M2 | 104 ₹9,070.88 | 101 ₹8,809.22 Lowest | 105 ₹9,158.1 |
| 10.00 | S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete. | 4 | No | 229 ₹916 | 201 ₹804 Lowest | 239.1 ₹956.4 |
Tender Value
₹13.1 L
EMD Value
₹26,200
Closing Date
9 Mar 2026, 12:00 pmClosed
E.E
MGCCD-3 Amroha
LOT 05 CONSTRUCTION OF V.R.B AT KM 2.256 OF HUSAINPUR MINOR OF MGC STAGE-II
2026_UPIDC_1120808_5
01/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹26,200
Yes
15 May 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
Earth work in cutting in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete.
Shuttering for P.C.C. including all cost of material, labour and T&P etc complete.
Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete.
M-100 brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete.
Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete.
R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete.
Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete
P.C.C.1:6:12 in back filling of Abutment including all cost of material, labour and T&P etccomplete.
Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete.
S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete.
S/F 25 mm thick expansion joints i/c cost of material, labour and T&P etc complete.
S/Laying Tarfelt in 3- layers for Bearing slab. i/c all cost of material, labour and T&P etc complete.
Earth work in filling for making ramp in all type soil with all lead & lead i/c all cost of labours t&p etc. complete.
Providing & Laying 1st class Brick on edge soling 110 mm thick on Diversion & Ramp i/c all cost of material, labour and T&P etc complete.
Dismantling Ist class Brick on edge soiling 110 mm thick including all cost of material, labour and T&P etc complete.
Laying Brick on edge soling with old brick including all cost of labour and T&P etc complete
C.C. ( M-20) in 1:1.5:3 wearing coat including all cost of material, labour and T&Petc complete.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.42 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.87 MB
BOQ_2085681.xls
BOQ • 0.28 MB
TD05.pdf
Tender Documents • 2.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .