Tender Value
₹30.0 L
EMD Value
₹29,994
Closing Date
17 Jul 2026, 6:00 pmClosed
Dy.Minicipal Commissioner - West Zone
Labour Work For Laying Water Pipe Line, Leakage Repairing , Water Pollution related Work , Solving CCRS Complaints & Other Maintanance Work Relates to DI WPL Works in Stadium Ward Of West zone.
320912
1/26-27 (T.N.76)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹1,500
Municipal Commissioner, Ahmedabad
₹29,994
6 Jul 2026
6 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
I.No. Qty. Item Description Rate Per Amount
1 Transporting from AMC store and laying
spigot and socket New DI pipe line DI-k-9
pipes of various classes with CI/DI/MS specials
of following diameters. Rate includes
excavation up to minimum 1.0 mt. depth from top
of pipe / as per requirement in any soil,
refilling after laying pipe, covering and
temptation of carting surplus earth up to
mt. lead and watering and compaction.
Clearing the site. All Joints shall be made tight
& leak free etc. comp.
b 80 150 mm Ø 77.68 Rmt
c 10 200 mm Ø 93.75 Rmt
f 5 350 mm Ø 185.71 Rmt
g 5 400 mm Ø 207.14 Rmt
h 25 450 mm Ø 275 Rmt
j 5 600 mm Ø 384.82 Rmt
k 1 700 mm Ø 493.32 Rmt
l 1 900 mm Ø 675.00 Rmt
2 Only Removing & recover of existing CI/DI
pipe line & Specials, removing any type of
joint , carting it to the Muni. Stores as &
where directed as per instruction of Engg. In
charge with excavation & refilling.
a 5 80 mm Ø 63.39 Rmt
b 5 100 mm Ø 64.29 Rmt
c 10 150 mm Ø 77.68 Rmt
d 5 200 mm Ø 93.75 Rmt
e 5 250 mm Ø 113.39 Rmt
f 5 300 mm Ø 136.61 Rmt
3 Removing & relaying of existing CI/DI
pipe line & Specials, Cleaning of pipe &
Specials from Inside, including excavation,
refilling etc. comp. in line & level with any
type of joints as per instruction of engg. in
a 10 80 mm Ø 63.39 Rmt
b 15 100 mm Ø 64.29 Rmt
c 20 150 mm Ø 77.68 Rmt
d 10 200 mm Ø 93.75 Rmt
4 Labour charges for installing and jointing
Sluice Valves including loading, transporting
from owner's store, lowering in location to the
required with excavation refilling alignment by
crane/ tripod and chain block including cost of
total nos. of nuts, bolts, Necessary gaskets and
excluding fixing of tail pieces with lead & jute
etc complete as directed by Engg. in charge.
5 Labour Charges for removing and recover of
ex. C.I. Sluice valve with tail pieces and
carting it up to Muni.Store or site as per
instrction of Engg. In charge item include.
necessary Excavation, removing or making joints,
refilling etc.comp. as directed by Engg in charge.
6 Cutting of existing pipelines of following
diameters including carting of nece. specials
from AMC store to site and from site to AMC
store (recovered materials) nace. labours for
excavation, jodan & backfilling fitter,
supervisor, etc. complete. Rate also includes
electric cutter, dewatering pump fuel and
transportation of machineries, chain pulley block
if requires working at an
7 3000 Labours charges for collecting specials from 21.43 Kg
Municipals store loading , transportation,
unloading to the site, laying and fixing CI
specials inclusive of all jointing materials like
lead, spun etc.and labour, exacavation re- filling
and nece. dewatering as per instrucation of engg.
8 200 Labour charges for recovering CI specials from old 11.16 Kg
line by heating the old joints by gas / any heating
device and recovering the fittings in re-usable
condition and loading, carting, unloading them
to nearby Municipal stores.
9 10 Fixing of valve Road box incl .locating 446.43 Nos
valve, nece. excavation, Brick Masonary,PCC
work. Item also inclues cartring form AMC store to
site. Etc.Comp. as directed.
10 Labour charges for repairing of leakage in
CI/DI pipeline for following diameter at
different places including necessary
excavation manually or by machinery,
removing mud, dewatering, cleaning of pipe
and leakage portion and repairing by Inserting
lead wool including tools required for inserting
lead wool, hiring charges of excavators,
Hydra/Crane, dewatering set, fuel, operator, cost
of lead wool etc complete (including all
material but excluding cost of pipe) (GWSSB
RATE 2022-23, item no.2)
50 80 mm dia 701 No
80 100 mm dia 987 No
80 150 mm dia 1337 No
80 200 mm dia 1660 No
35 250 mm dia 2430 No
55 300 mm dia. 2713 No
50 450 mm dia. 4609 No
20 500 mm dia. 4790 No
1 600 mm dia. 6895 No
1 700 mm dia. 7910 No
1 750 mm dia. 8709 No
11 90 Excavation for trail pit of maximum 223.21 No
diamension of 1.5 mt x0.75 x 1.5 mt depth for
location of existing line including excavation
but excluding cost asphalt cutting but including
refilling, watering etc. comp as per
instruction of Engg in charge.
12 Making hole on existing CI/DI/MS water
pipe line including nacessary GI fittings
item also includes necessary excavation,
dewatering and refilling as per instruction engg.
In charge etc.comp.
150 A) 15 mm Dia 312.5 No
100 B) 20 mm Dia 401.79 No
35 C) 25 mm Dia 535.71 No
20 D) 40 mm Dia 1785.71 No
20 E) 50 mm Dia 2678.57 No
13 500 Labour for change of GI water pipe line up to 31.25 No
customer end.(in Muni.Limit)
14 80 Labour Work for temp Jodan of ex.line for 267.86 No
running water supply incl making collar
between gap of pipe & jointing with jute & day
after removing all this as per inst etc.comp as dire.
15 60 Labour charges for doing washout of water pipe 669.64 No
line at end including necessary excavation
refilling the pit. Allowing the water to flow
for 15 minutes twice or thrice as per site
condition during supply hour, dewatering the
pit and plugging with existing wooden butch.
etc. comp. as per instruction.
16 Supplying wooden taper bunches from jungle
wood (Like limda, ambo) Etc.comp.
70 (A) 15 Mm dia. to 20 MM dia. 13.39 No
15 (B) 25 Mm dia. to 37 MM dia. 17.86 No
30 (C) 50 Mm dia. 89.29 No
40 (D) 80 mm dia to 100 mm dia line 312.5 No
17 Providing , Supplying and fixing ISI mark
approved quality for ferrul connecting to
existing CI/DI pipe line of water tight joints per
inst.of engg. in charge
80 (A) 15 mm dia 223.21 No
50 (B) 20 mm dia 312.5 No
15 (C) 25 mm dia 491.07 No
10 (D) 40 mm dia 714.29 No
18 200 Removing any kind of pavement incl 12.5 Smt
stacking of serviceble material disposal of
unserviceble material with 50 meter lead and lift.
19 400 Conveyance charge of earth ,lime,murrum, 125.33 Cmt
building rubbish, manual garbage, sludge,
excavated rock , fly ash, aggregate of any kind
etc. comp.up to 5.0 Km. lead (Based on
Building SOR 2015-16, P-589 - Item code-
20 Extra rate over item of excavation of earth
for excavation of asphalt pavement of thickness up
to 0.20 meter including demolishing
the asphalt carpet,metal,soiling etc.comp.
with stacking the material as directed.
250 a) up to 0.20 meter thickness (By Manual) 71.43 Smt
150 b)Up to 0.30 meter (By Breaker Machine 178.57 Smt
including cost of operator, fuel, & transportation
50 c) 0.30 meter & above (By Breaker Machine 312.5 Smt
including cost of operator, fuel, & transportation
21 300 Supplying Pneumatic Breaker Machine for RCC 535.71 Hr
Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc.
Complete as Directed. (No payment should be
allowed for non working condition of
machinery and for pipe line excavation and
M.H. work. Allowed only for break down work)
22 200 Providing & Supplying JCB Machine on rental 535.71 HR
basis in case of emergency situation and break
down type work & also during unavoidable
condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating
charges and stacking of useful & non-useful
materials separately up to store. (No payment
should be allowed for non working condition of
machinery and for pipe line excavation and
laying work) ( Based on Previously approved
rate by C E sir
23 100 Providing and operation dewatering Pump 535.71 Shift
including fuel charges & operator Charges etc.
as directed etc. comp. (Shift for Eight Hour)
(For Each Pump Set, No payment should be
allowed for non working condition of
machinery) (Based on Previously approved rate by
24 Providing, laying and jointing in true line
and level U.P.V.C pipe (SCH - 40) of
following dia. including fittings of standard
make as approved by Engineer - in - charge. Pipe
shall be fixed on the wall with the help of clamp
at every 2000 mm centre to centre or shall be
concealed as directed including necessary
fittings etc. including testing of pipe and joints
and fixing the same with adhesive solvent,
including cost of all materials. (As per Building
25 100 Providing , Supplying and using size 15 to 50 334.82 No
mm dia .PVC pipe line up to 1 mtr length
with material like pipe, coupler, Union, Elbow
tee,end cap ,band,F.T,M.T,Tail peice,reducer ,M-
seal, solution, Excavation pr day per ward
including labour and fitter to prevent leakage
etc.and Fixing with existing PVC/DI/CI line per
inst.of Engg. in Charge.Excavation including
Labour and fitter.
26 15 Providing,Supplying and Laying diff dia 343.75 No
sluice valves Glen dory leakage reparing the
excavation in any type of soil ,refiling,
necessary nuts,bolts etc complete as engg in
27 Supplying, labour for excavation of all types
of soil at any depth including excavation of
asphalt pavement of any thickness, demolition
of brick work in CM of any proportion
including stacking of serviceable materials and
disposal of unserviceable material etc. comp. as
A 400 Unskilled Labours / Mazdoor at day /night (As per 452 No
min. Wages Circular)
B 230 Fitter/Mason/Gas operator at day / Night 474 No
28 380 Supplying of Lead as per instruction of engg. In 259.32 kg
charge (Rate As per Microtech - Item Code-
29 100 Supplying of jute (Spun Yarn) as per instruction of 79.9 kg.
engg. In charge (Rate As per Microtech - Item
30 100 Barricading the entire break down or excavated 80.36 Rmt
area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre,
C.G.I. Sheet, reflective paint / Board out side
to avoid accident & for smooth traffic diversion
& movement including cautionary board etc. Item
also includes for making temporary sufficient
nos of lighting arrangement through out the work
with necessary required arrangement. The same
shall be removed after completion of work.
31 6.00 Hiring of tractor with trolley considering 8 Hrs. as 2110.50 Day
working day hours incl.Driver (GWSSB SOR
Total Amount Rs.
Total Amount Rs.
Contractor's Sign Addl.C.E.
Mobile No :- (West Zone)
AHMEDABAD MUNICIPAL CORPORATION ENGINEER
DEPARTMENT - WESTZONE
TECHNICAL SPECIFICATION
Nameof Work :- Labour Work For Leakage Repairing , Water Pollution related Work , Solving
CCRS Complaints & Other Maintanance Work Relates to WPL in Stadium Ward Of West zone.
GeneralTechnicalSpecificationSection
FollowingtechnicalspecificationsshallbeapplicabletotherelevantitemsofBOQ
Item No.1 :-Transporting from AMC store and laying spigot and socket New DI pipe line DI-k-9 pipes of various classes with
CI/DI/MS specials of following diameters. Rate includes excavation upto minimum 1.0 mt. depth from top of
pipe / as per requirement in any soil, refilling after layingpipe, covering andtemptationofcarting surplusearth
upto30 mt.lead and watering and compaction. Clearing the site. All Joints shall be made tight & leak free etc.
Modeof measurement
MeasurementshallbepaidbyRmt.basis.
Item No.2 :-Only Removing & recover of existing CI/DI pipe line & Specials, removing any type of joint , carting it to the Muni.
Stores as & where directed as per instruction of Engg. In charge with excavation & refilling.
Labour charges for OnlyRemoving &recover of existing CI/DIpipe line & Specials, removing any type of joint
carting it to the Muni. Stores as & where directed as per instruction of Engg. In charge with excavation &
Modeof measurement
MeasurementshallbepaidbyRmt.basis.
Item No.3 :-Removing & relaying of existing CI/DI pipe line & Specials, Cleaning of pipe & Specials from Inside, including
excavation, refilling etc. comp. in line & level with any type of joints as per instruction of engg. in charge.
Labour charges for recovering & cleaning C.I. Water pipe line & relaying the same incl. excavation & refilling
and Jointing pipe in line and level etc. comp. As directed.
Modeof measurement
MeasurementshallbepaidbyRmt.basis.
Item No.4 :-Labour charges for installing and jointing Sluice Valves including loading, transporting from owner's store,
lowering in location to the required with excavation refilling alignment by crane/ tripod and chain block
including cost of total nos. of nuts, bolts, Necessary gaskets and excluding fixing of tail pieces with lead & jute
etc complete as directed by Engg. in charge.
Modeof measurement
MeasurementshallbepaidbyNo.basis.
Item No.5 :-Labour Charges forremovingand recover of ex.C.I.Sluice valve with tailpieces andcartingit up to Muni.Store or site
as per instrction of Engg. In charge item include. necessary Excavation, removing or making joints, refilling
etc.comp. as directed by Engg in charge.
Modeof measurement
MeasurementshallbepaidbyNo.basis.
Item No.6 :-Cutting of existing pipelines of following diameters including carting of nece. specials from AMC store to site and
from site to AMC store (recovered materials) nace. labours for excavation, jodan & backfilling fitter,
supervisor, etc. complete. Rate also includes electric cutter, dewatering pump fuel and transportation of
machineries, chain pulley block if requires working at an instructed specific time of day or night etc. complete.
Modeof measurement
MeasurementshallbepaidbyNo.basis.
Item No.7 :-Labours charges for collecting specials from Municipals store loading , transportation, unloading to the site, laying
and fixing CI specials inclusive of all jointing materials like lead, spunetc.andlabour,exacavation re-fillingand
nece.dewateringasper instrucationof engg. incharge.
Modeof measurement
Measurementshallbegiveninkg.Basis.
Item No.8 :-Labour charges for recovering CI specials from old line by heating the old joints by gas / any heating device and
recovering the fittings in re-usable condition and loading, carting, unloading them to nearby Municipal stores.
Modeof measurement
Measurementshallbegiveninkg.Basis.
ItemNo.9:-FixingofvalveRoadboxincl.locatingvalve,nece.excavation,BrickMasonary,PCCwork.
ItemalsoincluescartringformAMCstoretosite.Etc.Comp.asdirected.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.10 :-Labour Charges for repairing the joint leakage in the existing C.I./DI Pipe line with specials incl. required
materials such as jute and lead etc , nece. excavation in any type of soil, refilling, nacessary trust block
etc.comp. as per instruction of engg.in charge.(Joint reparied under this item should not be paid in next four
months under normal condition)
Modeof measurement
MeasurementshallbegiveninPerJointBasis.
Item No.11 :- Excavation for trail pit of maximum diamension of 1.5 mt x0.75 x 1.5 mt depth for location of existing
lineincludingexcavation but excluding cost asphalt cuttingbutincludingrefilling, watering etc. comp as per
instruction of Engg in charge.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.12 :- Making hole on existing CI/DI/MS water pipe line including nacessary GI fittings item also includes necessary
excavation, dewatering and refilling as per instruction engg. In charge etc.comp.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
ItemNo.13:-LabourforchangeofGIwaterpipelineuptocustomerend.(inMuni.Limit)
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.14 :- Labour WorkfortempJodanofex.line forrunning water supply inclmaking collarbetween gap of pipe & jointing with
jute & day after removing all this as per inst etc.comp as dire.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.15 :- Labour charges for doing washout of water pipe line at end including necessary excavation refilling the pit.
Allowing the water to flow for 15 minutes twice or thrice as per site condition during supply hour, dewatering
the pit and plugging with existing wooden butch. etc. comp. as per instruction
Modeof measurement
MeasurementshallbegiveninNo.Basis.
ItemNo.16:-Supplyingwoodentaperbunchesfromjunglewood(Likelimda,ambo)Etc.comp.
Thewooden taperplugshouldbemadefromcountrywoodasperthesample and suitable to the /dia of
pipe and should be free from cracks.
Thesizeofwoodenplugshouldtheplugcaneasilyenteredinpipeandfixedproperly
withtheconnectionofpipesothatwatermaynotteakthroughplugandcaneasily removed as and where required.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.17 :- Providing , Supplying and fixing ISI mark approved quality for ferrulconnecting to existing CI/DI pipe line of water
tight joints per inst.of engg. in charge.
P/S OF and fixing ISI mark approved quality for ferrule connecting to existing CI/DI pipe line of
water tight joints per inst. of Engg. in charge.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.18 :- Removing any kind of pavement incl stacking of serviceble material disposal ofunserviceble material with
meter lead and lift.
Modeof measurement
MeasurementshallbegiveninSmtBasis.
Item No.19 :- Conveyance charge of earth ,lime,murrum, building rubbish, manual garbage,sludge,excavated rock ,fly ash,
aggregate of any kind etc. comp.up to 5.0 Km. lead (Based on Building SOR 2015-16, P-589 - Item code- 3.2.1)
All the surplus earth etc. shall be carried away immediately from the site of work to a place within average
km distance as directed and shall be dressed as ordered by the Engineer,so as not to cause any in convenience
to the public or traffic. Failing which in view of public as safety and traffic convenience the Corporation shall
SABARMATIWARD -
carry out the work by any other agency at the contractor's risk and cost. If the instructions are not complied
within 7 days from the date of order to cart the surplus materials and clear site, the said work shall be carried
out by the Municipal Corporation at the risk and cost of the contractor and so claim or dispute entertained in
Modeof measurement
MeasurementshallbegiveninCmtBasis.
Item No.20 :- Extra rateover item ofexcavationof earth for excavationof asphalt pavement ofthickness up to 0.20 meter
including demolishing the asphalt carpet,metal,soiling etc.comp. with stacking the material as directed.
extra rate for excavation of asphalt pavement of any thickness including demolishing theasphalt
carpet, metal, soiling etc. complete with stacking the materials as directed. The road surface of
asphalt shall carefully be opened to full width as directed by the Engineer in charge Asphalt,
popada's souls, metals etc shall be separately deposited in such places as may be determined by
the Engineering-charge. In case above materials not being so deposited or being mixed up with
the excavated materials will not be allowed for refilling. The cost of materials shall be charged
from the contractor. The decision of the C.E. shall be final and binding to the contractor. The
rate per sq. mt. in this item shall be paid extra addition to the rate for excavation.
For detailed specification refer 5th revision of MORTH (2013) & also ammendment shallbe
applicable to the latest versions.
Modeofmeasurement
MeasurementshallbegiveninSmtBasis.
Item No.21 :- SupplyingPneumaticBreakerMachinefor RCCSlaborAsphaltDemolishingWorkonsiteby using Operator, fuel,
power Supply etc. Complete as Directed. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and M.H. work. Allowed only for break down work)
The Item Shall include various operation cost. Such as diesel, Driver, Salary, Electrification, etc. The Work Shall
Carried out on risk of Contractor.
TheWorkShallbedoneasperEngg.in charge.
Modeof measurement
MeasurementshallbegiveninHr.Basis.
Item No.22 :- Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down type work &
also during unavoidable condition as per instruction of engg.incharge , rate includes all nece. shifting, fuel
and operating charges and stacking of useful & non-useful materials separately up to store. (No payment
should be allowed for non workingcondition of machinery and for pipe line excavation and laying work)
(Based on Previously approved rate by C E sir.
The Item Shall include various operation cost. Such as diesel, Driver, Salary, Electrification, etc. The Work Shall
Carried out on risk of Contractor.
TheWorkShallbedoneasperEngg.in charge.
Modeof measurement
MeasurementshallbegiveninHr.Basis.
Item No.23 :-Providing and operation dewatering Pump including fuel charges & operator Charges etc. as directed etc. comp.
(Shift for Eight Hour) (For Each Pump Set, No payment should be allowed for non working condition of
machinery) (Based on Previously approved rate by C E sir )
SABARMATIWARD -
Providing and Operation Honda Pump including fuel charges & Operation as directed etc.complete as directed by
Engg. in charge.
Modeof measurement
MeasurementshallbegiveninShiftBasis.
Item No.24 :-Providing, laying and jointing in true line and level U.P.V.C pipe (SCH - 40) of following dia. including fittings of
standard make as approved by Engineer - in - charge. Pipe shall be fixed on the wall with the help of clamp
at every 2000 mm centre to centre or shall be concealed as directed including necessary fittings etc.
including testing of pipe and joints and fixing the same with adhesive solvent, including cost of all materials.
(As peruilding SOR 2015-16)
Modeof measurement
MeasurementshallbegiveninRmtBasis.
Item No.25:- Providing , Supplying and using size 15 to 50 mm dia .PVC pipe line up to 1 mtr length with
materiallikepipe,coupler,union,Elbowtee,endcap,band,F.T,M.T,Tailpeice,reducer
,M-seal,solution,Excavationprdayperwardincludinglabourandfittertopreventleakage
etc.and Fixing with existing PVC/DI/C lineper inst.of engg. in charge.Excavation including Labour and fitter.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.26 :- Providing,Supplying and Laying diff dia sluice valves Glen dory leakage reparing the excavation in any type of soil
,refiling, necessarynuts,bolts etc completeas engg in charge.
Modeof measurement
MeasurementshallbegiveninNo.Basis.
Item No.27 :-Supplying, labour for excavation of all types of soil at any depth including excavation of asphalt pavement of any
thickness, demolition of brick work in CM of any proportion including stacking of serviceable materials and
disposal of unserviceable material etc. comp. as directed.
Supplying,laborforbreakdownrepairingworkforactivitieslikeexcavation,disliting, removing debris from trench
back filling etc. comp. as directed by Eng .in charge.
Modeof measurement
MeasurementshallbegiveninNoBasis.
ItemNo.28:-SupplyingofLeadasperinstructionofengg.Incharge.
Modeof measurement
MeasurementshallbegiveninKg.Basis.
ItemNo.29:-Supplyingofjute(SpunYarn)asperinstructionofengg.Incharge.
Modeof measurement
MeasurementshallbegiveninKg.Basis.
Item No.30 :-Barricadingtheentirebreakdownor excavatedareaonrentalbasisusingwoodenballies/ M.S.angles at max.
meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to avoid accident & for smooth traffic
SABARMATIWARD -
diversion & movement including cautionary board etc. Item also includes for making temporary sufficient
nos of lighting arrangement through out the work with necessary required arrangement. The same shall be
removed after completion of work.
Modeof measurementMeasurementshallbegiveninRmtBasis.Skilled Welder per shift
Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver (GWSSB SOR 2021-22)
And All type ON SITE Material responsibility only Labour contractor.
APPLICABLE CODES:
Various operations such as transport to work sites lowering in trenches laying jointing and field testing of cast
iron pipes and fittings shall comply with all currently applicable standards. In all cases the latest revision of the
standards shall be referred to. If requirements of this specification conflict with the requirements of the standards
this specification shall grove.
(a) IS:638Specificationforsheetrubberjointingandrubberinsertingjointing.
(b) IS:782Specificationforcaulkinglead.
(c) IS:1538SpecificationforcastionfittingsforPressurepipesforwatergasandsewage.
(d) IS:3114Codeofpracticeforlayingofcast-iron.
(e) IS:3400Methodsoftestforvulcanizedrubber(Partsto20)
(f) IS:5382SpecificationforrubbersealingringforGasmainswaterandsewers.
(g) IS:6587Specificationforspun/yarn.
CARTINGANDHANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from the Municipal Stores or
contractor’s stack yard to the work sites at places along the alignment of pipeline as directed by Owner /Engineer.
The Contractor shall be responsible for the safety of pipesfittingandvales withtailpiecesintransit
loading/unloading.Everycare shallbeexercisedin handling pipes and fittings to avoid damage. While unloading the
pipes and fittings shall with steadying ropes of by any other means. Padding shall be provided between coated pipes
fittings and skidstoavoiddamagetothecoatingSuitablegapebetweenpipesshouldbelift at intervalsin order to permit
access from one side to the other. In case of spigot socket pipes care should be taken regarding orientations pipes
while unloading. As far as possible pipes shall be ulna addedon one side of the stretch only. Thepipesshallbe checked
for any visibledamage (suchas broken edges cracking or spelling of pipe) while undo adding and shall be sorted out
for reclamation any pipe which shows sufficient damage to preclude it from being used shall be discarded shall be
prohibited. Necessary warning boards and lamps should be provided in front and side of pipes to avoid any
accident.Pipesshouldbe stacked withsufficient packingtoprevent rollingof the same. Contractor will be fully
responsible for any accident due to pipes or other materials stacked on site of yard. Contractor will be fully
responsible for any legal formalities arising due to such accident and all legal charges there of shall be paid by
contractor of will be recovered from his running bill of the same or other AMC works.
SABARMATIWARD -
Each stack of pipes shall contain only pipes of same class and size, with consignment or batch number
marked on it with particulars of supplies wherever possible storage shall be done on film level and clean ground and
wedges shall be provided at the bottom layer to keep thestackstable. Thestackshallbe inpyramidshapeorthelaid
lengthwise andcrosswise inaltimeter layers.Thepyramidstackshallbe madeforsmallerdiameterpipesforconserving
spacein storing them.The height of the stock shall not exceed 1.5m. Fitting and sluice valves with tail piecesshall be
stacked under coverand separated frompipes. Rubberringsshallbe stored in clean coolstore away from windows
boiler electrical equipment and petrol oils or other chemicals Particularly in the field where the rubber nods are
being used it is desirable that they are left out on the ground in the sun or overmuch under heavy frost of snow
The Contractor shall visit the before tendering and get himself acquainted site condition and the regulations
regarding the laying of pipes in congested areas heavy traffics areas etc. The successful bidder shall take the
necessary permission and clearance of all the authorities like department of ads traffic water supply and the drainage
electricity broad telephone comp anyetc. Wherever necessary.
Roadreinstatementshallnotbeincludedinbackfillingunlessspecified.
To protect person from injury and to avoid damage to property adequate barricades construction signs red
lanterns and guards as required shall be placed and main lined during the progress of the construction work and unit
it is safe for the traffics to use the roadways. The relevant Indian standards and the rules and regulations of the local
authorities in regarded to safety provisions shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be provided by contractor at his
Suitable fencing shall be provided along the sides of trenches and pits. The post of the fencing shall be of
timber securely fixed in the ground not more then 3m.apart and they shall be less than 75 mm in diameter of less
than 1.2 m above the surface of the ground. There shall be two rails. One near the top of the post and the other
about 450 mm. Above the ground and each shall be from 50mm to 70mm in diameter and sufficiently long to run
from post to post which they shall be bound with strong rope. The method of projecting rails beyond the posts and
tying them together where they meet will not be allowed on any account. All along the edges of the excavated
trenches a bank of earth about 1.2. m high shall be formed as required by the Owner/Engineer for further protection.
The above work shall not be paid for separately and the contractor shall take into account the costs of such works
and quote accordingly.
Whole work shall done within 24 hrs. by parts or whole work so that water supply from AMC shall not be
The excavation in the foundation shall be carried out in true and level and shall have the width and depth as
required and as directed. The Contractor shall provide necessary slopes to a
safeangleorstepsasrequiredordirectedathisowncostNoextrapaymentshallbemadefor
SABARMATIWARD -
such precautionary measures taken. The bottom of the excavated area shall be leveled both longitudinally and
transversely as directed by removing excess soil and watering as required. No earth filling will be allowed for bringing
it to level if by mistake or any other reason excavation is made deeper or wider than asdirected. The extra depth or
width shallbe made up with concrete of the same proportion as specifiedfor the foundation concrete at the cost of
the contractor.The excavation up to any required depth shall be carried out under this item as required and directed
by engineer in charge.
SurfaceExcavationforRoadWork:
Excavation exceeding 1.5 mm in width and 10 sq mm on plan but not exceeding 30 cm in depth in all kinds
of soil which are specified shall be as treated as surface excavation.
Excavationintrenchesforservicelines-WatersupplyandDrainage:
Excavation in trenches shall be carried out in any material encountered on the site to enable the service
lines to be laid to the lines and levels shown and as directed. Excavation shall be made with adequate and stable side
slopes or shoring strutting if necessary. The contractor shall provide all measures to protect adjoining properties
service limes etc. The contractor shall take necessary action to keep excavation free from water.
Trenches shall be wide enough to provide sufficient space for joining and inspection. The trench bed shall be
trimmed and rammed with sprinkling of sand or murmur so that the pipes when laid to the required levels and
gradients shall be no the bottom fully supported along the entirelengthofthepipe.Thetrenchshall
bedeepenedandwidenedlocallyto receivethesockets and to permit the joint to be made and inspected.
Before excavation is started rails shall be erected at convenient places and at all changes of direction and
gradients at a definite and as far as practicable uniform height above the proposed invert level of the pipes the
center lime being clearly marked on each horizontal rail. The depth of excavation and level of the pipe invert shall be
checked by means of benching road of appropriate lengths.
DisposaloftheExcavatedStuff:
The excavated stuff of the selected type shall be used for filling the trenches and plinth or leveling the
ground in layers including ramming and watering etc. complete. The Contractor shall remove the balance of the
excavated from the site of work to a place as directed within a lead unto 50mm and for all lift.
FilingofTrenches:
As soon as the work in foundation has been completed and measured the sides of foundation shall be
cleared of all dedans brick bats mortar dropping etc. and filled with earth in layers not exceeding 15 cm Each layer
shall be adequately watered rammed well andconsolidated before the succeeding layer is laid. The earth shall be
rammed with iron rammers where feasible and with the butt ends in layer of crowbars where rammer cannot be
used. The plinth shall be similarly filled with earth in layers not exceeding 15 cm adequately watered and
consolidated by ramming with iron or wooden rammers. When filling reaches finished level the
surfaceshallbefloodedwith waterforatleast24hoursand allowedtodryandthenrammedand consolidated. The finished
level of filing shall be kept to shape and gradient intended to receive any floor finish. The excavated stuff of the
selected type only shall be allowed to be used forfilling the trenches and plinths. Under no circumstances black
cotton soil shall be used for filling the plinths.
SABARMATIWARD -
FILLINGMATERIALS:
Filling materialsmay be either excavated stuff ofselected materialsbrought fromoutside. Excavated stuff or
selected earth to be used shall be cleared of all rubbish large size stones brick batsetc. complete andbig clodsshallbe
brokendown toasizeof50mmor less. Theselectedsoil and or murmur or any other materials shall be got approved
before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the contractor shall got
checked the trenches ready for refilling.
The space between foundation masonry concrete pipe line and the sides of excavation and/or bottom of
found at ion shall be refilled to the original surface or up to plinth level with earth or selected materials in layers of
15 cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid till the final level is
reached to form a thoroughly compacted base.
Refilling on top of pipe shall be carried out carefully with selected soft stuff out of the excavated stuff. The
refilling shall be raised about 5 cams. For subsequent settlements.
Thecontractorshallberesponsibleforanysettlementduringpassageoftime ofduringmonsoon and the same shall be
refilled with stuff brought from the out side if necessary.
The process of refilling brunches in plinth watering ramming shall be carried out in such a way as not to
danger to pipe line for foundation footing plinth well etc. already laid or built up.
If watering isnot done by contractor with its own arrange meant watering charges at 20% of this item rate
shall be deducted from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The storage shall not be
exposed to direct sunlight or any heat radiating appliance. The rings shall not be allowed to come in contact with any
fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of pipes for which they
are to be used the manufacturer’s name or trademark and the month and the year of manufacture.
The rings shall comply with IS 5382 regarding their material finish tolerance in dimension and physical
The rubber rings shall be such that they shall not show any signs of deterioration for any reason during the
contract period plus the defects liability period, Entire expenses associatedwith correctingdefects inthisregard
includingreplacementof rubberringsshallbefullyborneby the contractor.
In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the contractor shall take
into account the manufacturer’s recommendations as to the methods and equipment to be used in assembling the
joints. In particular the contractor shall ensure that the
spigotendofthepipetobejointedissmoothandhasbeenproperlychamferedthattherubber
ring as per IS 5382 is correctly positioned in the socket and that the two pipes are accurately in line,beforethe joint
ismade.Therubber ringsand any recommendedlubricant shallbe obtained only through the pipe supplier or as
directed by the Engineer.
LEADCALCULATINGJOINTS
The jointing shall be done with molten lead and spun yam. Pin lead shall be of uniform quality clean and free
from foreign materials. It shall be of uniform softness capable of being easily caulked or driven. It shall conform to IS:
782 Spun yarn shall be of clean hemp and of good quality. It shall conform to IS: 6587 Its quantity shall be as follows.
QuantitiesofspunYarnforDifferentSizesofPipes
(Materialsforsinglecollarjoints)
NominalInternal SpunYarnMass
Note: Under special circumstances the Engineer-in-charge may decide the quantities of spun yarn
depending upon the site conditions. The quantity of different diameters of C.L. pipes and fittings shall
SABARMATIWARD - 31-
QUANTITIESOFLEADYARNFORDIFFERENTSIZESOFPIPES
NormalSize Lead/Joint Depthof
Note: The quantities of lead given are provisional and a variation of 20 percent is permissible either way.
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so that the molten metal
will not be chilled inbeing carried from the melting potto the joint and shallbe brought to a proper temperature so
that when stirred it will show a rapid change of color. Before pouring all scum shall be removed. Each joint shall be
one continuous pour filling of the entire joint space with solid lead. Spongy or imperfectly filled joints shall
be bunt out and repaired.
The joint runner shall fit snugly against the face of the socket and the outside of the pipe shall be dammed
with clay to from a pouring lip to provide for filling the joint flush with the face and to the top of the socket.
SABARMATIWARD - 32-
The jointed is done by first caulking in spun yam, then filling the remainder of the joint space by running in
molten lead, taking care that no dross enters the joint and then thoroughly caulking the lead. The spun yam shall be
used to center the spigot in the socket and to prevent the flow of molten lead into the bore of the pipe.
Afterthe lead hasbeen run into the joint the lead shall be thoroughly caulked. Caulking of joints shall be
done after a convenient length of the pipes has been laid and leaded. The leading ring shallfirst be removed and any
lead outsidethe socket shallbe removed with aflat chiseland then joint caulked removed with a flat chisel and then
the joint caulked around three times with caulking tools of increasing thickness and hammer of 2 kg. Weight Lead
run joints shall be preferably finished 3 mm behind the socket face. The joints shall not be covered till the pipe line
has been tested under specified hydrostatic test pressure, though the rest of the pipe line should be covered up to
prevent expansion and contraction due to variation in temperature.
Fillingavailableexcavatedearth(excludingrock)intrenchesplinthsidesoffoundationetc. in layers not exceeding
20 cams.In depth consolidating each deposited layer by ramming and watering.
The refillingwill generallyreferto refillingofpipelinetrenches,foundation trenchesupto plinth level or ground
level with excavated stuff selected soil brought from outside.
ClearingorTrenchesorGround:
The excavated trenches for foundation or ground over which filling is to be done shall be cleared off all grass
loose stones rubbish of all kinds brick bats as well as tress roots etc.
Theyshallbewellwateredbeforestuffislaid.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
SealandSignatureoftheBidder Add.CityEngineer(WestZone)
AmdavadMunicipalCorporation
SABARMATIWARD - 33-
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – œrûtK vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj
fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb
<&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu
mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk
ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu
ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf
duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytu zoh
fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe
mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. dwsht< mhfth ©b,ftuiNÕg ylu htusdth rJCtd îtht XhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2 mraJtjg ,dtk^eldh
<t.15.02.24 lt XhtJ v{btKu yusLme/¢tuLx[fxhtulu îtht ©bgtude ftgœtle studJtR vhevqKo &tg <u mwrlµ< fhJtlwk hnNu.
16. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
SABARMATIWARD - 34-
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto ctœ
24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu ftbdehe
fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb NY
fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk vwKo fhJtbtk
lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu hnuNu.
SABARMATIWARD - 35-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall
be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form
a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through
its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
Clause : 5 Schedule Of Maintanance
Contractor Should have to manage following condition for maintanance of water pipe line work as per Engineer
Sr.no. Mode Of Complaint Required machinory / Labour Remarks
Either Whatsup or Email Required as per site Condition or
3 Engineer Instruction
Complaint Received by higher
Authority / Councilor/ by Public
SABARMATIWARD - 36-
If Contractor Not Follow Schedule Of Maintanance
1. Whenever a work is allotted by Engineering staff, whether minor or major of part thereof of any amount, the
contractor shall be bound to start the works within 48 hours of intimation of work. Communication done
telephonically via SMS ,ViaWhatsapp and through letter /E-mail shall be considered legal and binding for the
2. Failure of comply to start the works in 48 hours of intimation as above by contractor the contractor shall be levied
penalty of (1) Rs.1000/-per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for tenders amounting
above 10 Lakhs and upto 30Lakhs), (3) Rs.5000 per day (for all tenders amounting above 30Lakhs).
3. Three times failures by contractor shall make contractor responsible to be blacklisted unless and otherwise justified
properly in writing/binding within 15days of last notice of penalty.
4. The Contractor shall adhere to the maintenance schedule outlined in the tender documents and comply with
the prevailing AMC circulars issued from time to time.
Contractor's Sign Addl.C.E.(westzone)
SABARMATIWARD - 37-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 76.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .