Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹37.0 Cr
EMD Value
₹37.0 L
Closing Date
4 Dec 2026, 6:10 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Ahmedabad Urban Development Authority, Ahmedabad
Name of Work:-Construction of 6 Lane Road From Narmada Canal to Dhanaj Palasana Phase (3) is 3.50Km length in Kalol TP-16 Dhanaj - Palasana for Ahmedabad Urban Development Authority (AUDA)(RW NO.14/2026-27)
364062
RW NO.14/2026-27
Open
Miscellaneous Works
Works
Ahmedabad
1 document required · 1 mandatory
₹18,000
Ahmedabad Urban Development Authority, Ahmedabad
₹37.0 L
6 Nov 2026
6 Nov 2026
6 Nov 2026
4 Dec 2026
6 Nov 2026
Name of Work:-Construction of 6 Lane Road From Narmada Canal to Dhanaj
Palasana Phase (3) is 3.50Km length in Kalol TP-16 Dhanaj -Palasana for
Ahmedabad Urban Development Authority (AUDA)(RW NO.14/2026-27)
Special condition of contract
Ahmedabad Urban Development Authority (A.U.D.A.)
SPECIAL CONDITION OF CONTRACT
1.0 Minimum required Equipments for the work
1.1 The contractor should have minimum machinery of its own ownership as mentioned below:
1. Sensor Paver – 2 Nos. (full width paver for 4 or 6 lane road)
2. PTR – 2 Nos.
3. Vibrator Roller – 4 Nos.
4. Bitumen Sprayer – 4 Nos.
5. Air Compressor-4 No
6. Dumper – As per Requirement & Directed by engineer in chrage.
7. Metal Detector-2 No
8. Cutter Machine-2 No
9. Broomer- 2 No.
10. Thermometer- 4 No.
Note: And if any machineries would require on site for execution of work, contractor has bound
to provide as directed by Engineer-in-Charge and/or his authorized representative. And if
contractor has failed to provide minimum machineries as prescribed above and also as
suggested by Engineer-in-Charge and/or his authorized representative, then contractor
may be penalized as suggested by Engineer-in-Charge and/or his authorized
representative.
1.2 Contractor shall submit the list of above equipments along with indemnity bond of
ownership for above equipments. If the same are to be procured on rental basis, than
contractor shall have to submit the rental agreement to AUDA mentioning that all rental
machineries shall be used exclusively for this tender work of AUDA allotted to contractor.
1.3 Contractor shall submit a bond mentioning that he will deploy separate machineries for each
tender allotted to him.
1.4 Contractor shall increase & deploy required number of machineries like Sensor Paver,
Rollers, dumpers etc. to complete the work within time limit with quality as per the Priority
given by Ahmedabad Urban Development Authority (AUDA).
2.0 Batch Mix Plant
2.1 Bidder shall have own 1 Nos. batch mix plant of minimum up to 120 TPH capacity in running
and good/operational condition and within the limit of 50 km from the boundary of kalol
and vaishnodevi area (JURISIDICTION OF SECTION-4).
2.2 Bidder shall submit health certificate of that plant from the Superintending Engineer,
(Mechanical), Road & Building Department, Gujarat at the time of commencement of Batch
2.3 If the batch mix plant own by bidder is situated anywhere in the country and not within the
above-mentioned limit, Contractor shall submit Additional Security Deposit other than EMD
of Rs. 50 lakh in the form of Bank Guarantee to be submitted within 07 days from date of
LOI. Bank Guarantee shall be from approved list of banks of AUDA and the issuing branch of
bank guarantee shall be of Ahmedabad city only. The same shall be released after
establishment of Batch mix plant within 90 Days from the date of LOI within the limit of
km from boundary of AUDA .In case of late installation of the batch mix plant, the release of
this bank guarantee shall be as per the sole discretion of Chief Executive Officer (CEO),
AUDA. In case, if contractor installs the batch mix plant successfully within 90 days from LOI,
the additional security deposit shall be released. But due to emergency work of AUDA,
Ahmedabad Urban Development Authority (A.U.D.A.)
Contractor has to submit rent agreement within 15 days. After issuance of LOI and has to
start work based on rental agreement within 15 days. Along with contractor has to start
installation of batch mix plant with all necessary certificates and has to start work within
days after issuance of LOI from his own plant as per tender terms and conditions. Hence
submited rental aggrement is valid upto 90 days.Along with Tender Submission Documents,
Contractor shall submit an Undertaking on company's letter head mentioning that I/We
will submit an Additional Bank Guarantee other than EMD amounting of Rs.50.00 Lakh
within 07 days from the date of LOI and install the plant as per tender within 90 days from
the date of LOI within the limit of 50 km from boundary of AUDA. If I/We fail to establish
the above said Plant within prescribed timelimit, I/We will bound to the decision taken by
Chief Executive Officer (CEO) of A.U.D.A. and AUDA also may take necessary action against
us at its sole discretion.
2.4 In case of late installation of the batch mix plant, release of this bank
guarantee shall be as per the sole discretion of Chief Executive Officer (CEO),
3.0 Providing transportation facility for AUDA staff
(1) Project Vehicle:- For site, Minimum 1 Brand new fully loaded Vehicle- Hyundai venue
(PETROL/DIESEL only) or equivalent in mid segment latest make having min 1200 cc of
Engine with A.C. shall be provided to the employee of AUDA for site supervision of the
AUDA works. All expenses required for keeping the vehicles in smooth running
conditions such as fuel, lubrication oil & other consumable, necessary service &
maintenance, drivers having valid license, driver salary (minimum Rs. 19000), repairs &
replacement, insurance with sole responsibility etc. will be borne by contractor. All
necessary taxes for operating the vehicles shall be fully paid & all necessary papers shall
be provided as required by prevailing motor vehicles Act. With comprehensive insurance
cover for the vehicles. In the event of any vehicle being off the road for maintenance or
on account of breakdown, the contractor shall provide substitute vehicle immediately.
The vehicle shall be required anywhere and at any site of work for the use of AUDA. The
vehicle will run through out the period of contract incl. Sunday/holidays. The vehicle
must be handed over to AUDA as soon as the work order is issued till the issue of
completion certificate. Penalty of Rs.2000/day shall be levied and deducted in Running
Bill/Deposit of contractor for not providing vehicle as stipulated.
(2) The contractor shall separately provide transportation facility for AUDA staff/PMC staff
appointed on his Batch mix plant. Vehicle provided for this purpose shall be a Four
Wheeler in good operational condition with Driver. The contractor shall not be paid any
extra amount for the same.
(3) Contractor has to provide 1- All-in-One PC with colour printer of latest model “HP All-in-
One, Intel Core Ultra 7 155U(16GB DDR5, 1TB SSD) IPS, 300nits, Anti-Glare,
inch(68.6cm) FHD, Win11, M365, Office24, Shell White, 6.72kg, FHD IR tilt Camera
w/Privacy shutter, 27-cr1009in & “HP Smart Tank 580 All-in-One WiFi Colour Printer” or
equivalent model including all required installation and upto starting of system in
running condition for exclusive use of AUDA staff. All the required maintenance,
supplying of required pages & INK Refilling facility will be provided by the Contractor till
the issue of completion certificate. Contractor shall provide the whole system within
days from date of work order otherwise penalty of Rs.1000/- per day shall be imposed.
Ahmedabad Urban Development Authority (A.U.D.A.)
4.0 Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, GST/sales tax, and Govt. duties /
tax etc. on material procured for the works from any source shall be borne by the contractor.
No (P) or "C" or "D" form shall be supplied by AUDA for this purpose.
5.0 Submission of project schedule:
Contractor has to submit his work plan, methodology and Quality assurance plan to complete
the work within the time limit with the tender documents and also as and when demanded
by the AUDA during the running project to monitoring the progress of the Project only.
6.0 Reserved Rights
Chief Executive Officer (CEO) Reserves right.
(1) To waive any qualifying criteria or information in any tender as a special case and to
reject any or all tenders without assigning any reason thereof.
(2) To increase / decrease the scope of work & also split the tender in two or more
contracts without assigning any reason even after the work is awarded.
(3) To allot number of tenders to other successful bidders, in case if any contractor is
lowest in more than one tender.
(4) To collect any required documents after bid opening and also reserves the right for
rejection/acceptance of any tender.
7.0 Testing charge
For Testing Frequency, as per Goverment of Gujarat Circular No.PRCH/102007/28-Date.-
31/12/2019, and all latest Circular shall be applicable.
(1) 10% test will carryout at Goverment Laboratory i.e GERI/LDCE/IITRAM
(2) 90% test will carry out at the Plant/Field Laboratory/NABL approve lab of this work.
1. To execute the bituminous items, the contractor shall have to procure VG-40 & VG-10 VG-40
grade Bitumen on his own cost from the approved Oil Company IOCL,BPCL or HPCL only.
Contractor shall have to submit original purchase bills of Bitumen for verification at the time
of claiming for price escalation to AUDA along with sign and certificate for the originality of
the Bills. If any discrepancy found in such submitted bills then it will be Contractors
responsibility. Contractor shall have to provide such original bills and will not return to the
2. It is the responsibility of the contractor to submit the original bills of bitumen and if any
duplicate / Colour photo copy Submitted to any other department bill is found, then strict
legal action will be taken against the contractor by AUDA.
3. Price Variation AS PER SBD document.
4. Contractor will be fully responsible to verify the quality, quantity and all other aspects at the
time of receiving delivery of bitumen. No excuse in this regards will be considered after the
bitumen is received and contractor will be fully responsible for quality of work & its
performance etc.
5. For item requiring bitumen consumption, the contractor shall have to procure the bitumen
of required grade and quality only from the IOCL,BPCL or HPCL only.Contractor shall have to
provide such original bills as and when asked by AUDA or Audit Department of AUDA for
Audit Purpose.Measurement of the bitumen item will not be written in MB,if original bills
are not submitted for quantity consumed.
6. The VG-10 grade bitumen for tack coat shall be procured by the contractor. No price
Variation for that shall be given.
9.0 Production of Hot mix material
Productions of hot mix material shall be only from Batch Mix Plant of min 120 TPH/above
120 TPH capacity for the entire work. The contractor shall procure raw materials (aggregates
Ahmedabad Urban Development Authority (A.U.D.A.)
of different sizes, bitumen, etc.) as required and can stock the material well in advance to
maintain the required progress of work with prior approval of such material from Engineer-
in-Charge and/or his authorized representative. The Contractor shall manufacture Hot Mix
material as per the specification mentioned in the tender document.
All aggregates used in the Hot mix material should be confirmed to the relevant standards
and it should be procured from the approved source/region specifically from the
Sevaliya/Sayala area only is compulsory and It should be confirmed to the all technical
requirements of the specific Item/Specifications.
Contractor shall have to submit his biding letter that he will supply all the aggregates from
the source finalized by Engineer-in-Charge and/or his authorized representative along with
the Quarry names and locations. Contractor is also bound to produce all Genuine Original
bills for the supply of Aggregates submit to AUDA as well as Contractor is fully responsible
for the Originality of the all such Bills.
10.0 Laboratory at Plant
The Contractor shall setup a laboratory at all the batch mix plant along with all the calibrated
Equipments for testing of asphalt, aggregates, and Hot Mix material with the Material
Engineer in the Laboratory having experience of not less than 3 years in Laboratory testing.
The Contractor has to prepare Quality Assurance Plan (QAP) as per tender document and it
should be get approved by AUDA as well as he has to do all testing as per approved QAP and
all reports have to submit along with Running Bills duly verified by Engineer-in-Charge
and/or his authorized representative.
11.0 PRICE VARIATION CLAUSE
As per SBD Document.
Ahmedabad Urban Development Authority (A.U.D.A.)
I/We, .the contractor of this work of tender ID
Is certify that the bitumen purchase bill invoice attach herewith is original and I/We solely
responsible for the same. I/We also declare that the mention quantity of bitumen is used in said
work only and I/We don’t have submitted similar/Duplicate/copy of the same bitumen
purchase bill invoice to any other Project of AUDA or any other organisation for the same
quantity of bitumen bill invoice which used in this tender.
Name of Invoice Date Invoice Stationary Total Qty of Total Amount
Name of Invoice Date Invoice Stationary Total Qty of Total Amount
Refinery Number Number Bitumen of Invoice
I/We declared that I/We are totally responsible for any dispute raised in future about the
originality & quantity of bitumen bill invoice as above.
Seal and Signature of the contractor
12.0 Liquidated Damages
12.1 As per SBD Document.
13.0 Performance Guarantee:
As per SBD Document.
14.0 Payment of Bituminous work:
After completion of final layer of Bituminous work, only 90% amount of final layer work will
be released. Remaining 10% amount of final layer work will be released after satisfactorily
completion of raising of all Manholes & Catch pits up to finished road level. This remaining
10 % amount can be released for individual road after raising the manholes / catch pits up to
finished road levels.
15.0 Total Station Survey of Central line marking, different utilities, trees, encroachment etc :-
The contractor have to carry out total station survey of each roads included in the tender
showing central line of the road, location of Manholes, Catchpits, Trees, Temples, Power
Distribution Boards, Encroachments etc. before starting the work on site. Contractor shall
have to submit such survey report and drawing to AUDA.
Ahmedabad Urban Development Authority (A.U.D.A.)
18.0 Performance of Bidder in AUDA Work
If works carried out by the bidder in last three years are found to be inferior quality or if the
bidder is alleged for malpractice in the tenders allotted to him in last three year, then to
accept or reject his tender, shall be sole discretion of Chief Executive Officer (CEO), A.U.D.A.
i.e. Chief Executive Officer (CEO) is at his sole discretion may accept or reject the tender and
the decision of Chief Executive Officer (CEO) shall be bound to the bidder.
18.1 If the Contractor indulged into any malpractice and/or used any inferior quality and/or the
construction of road is found to be of an inferior quality under this contract than in such
case Chief Executive Officer (CEO)/AUDA has right to debar/ blacklist them permanently.
Seal and Signature of the Bidder Executive Engineer
Date: Ahmadabad Urben Development Authority (AUDA)
Ahmedabad Urban Development Authority (A.U.D.A.)
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 The Chief Executive Officer (CEO), Ahmedabad Urben Development Authority (AUDA)
(referred to as Employer in these documents) invites sealed bids for the construction of
works (as defined in these documents and referred to as “the work”) detailed in the table
given in the Invitation for Bid (hereinafter called as IFB.) from competent bidder. The bidders
may submit bids for the works detailed in the table given in IFB.
1.2 The works shall, inter alia, include the following, as specified or as directed.
1) Site clearance, removal of tree stumps and dismantling of obstructions,
encroachments etc. before commencement of the works. Also existing utility survey
before starting of work for coordination of the other agencies for shifting or removal
of hindrances of the work.
2) Bidder must carry out road work as per MoRTHS 5 th Revision and latest codal
provision of IRC notified /published at least 60 days before the last date of bid
3) True and proper setting out and layout of the works as per the instruction of
Engineer-in-Charge and/or his authorized representative at no extra cost, setting of
bench marks, provisions of all necessary labours, instruments, and appliances.
4) Widening of existing carriageway and strengthening including camber correction and
profile correction
5) Construction/Raising of existing manholes, catch pits, valve chambers, etc.
6) Providing necessary road markings, road signs for traffic diversions.
7) Provision of suitably designed protective works for road
8) Environmental measures.
9) Ensuring safe traffic movement at all times during construction
10) Any other item of work as may be required to be carried out for completing the road
works in all respects in accordance with the provisions of the contract.
11) Total Station Survey of all Roads included in this tender and submitting its drawing
as specified by AUDA.
12) All the items of BOQ will be carry out as per technical specifications mentioned in
tender document. Contractor will be fully responsible to maintain the quality of road
13) Whenever required for repairing of road work FWD test is carried out as per latest
codal provision by tenderer and agency has to submit final report of FWD test and
take necessary approval from competent authority before starting of repairing of
existing road work. No extra payment shall be made for that.
14) For new road construction, contractor has to design road as per latest IRC-37 and
proceed for approval from competent authority and execution accordingly. No extra
payment will be given to contractor for submitting design of new Road.Such road
shall be design for minimum 10 MSA traffic.
15) Before execution of any kind of work, contractor has to submit bituminous mix
design as per availability of material and environmental conditions in witness of
Engineer-in-Charge and/or his authorized representative of AUDA/PMC finalize by
AUDA and proceed further for approval of bituminous mix design from competent
Ahmedabad Urban Development Authority (A.U.D.A.)
16) Before execution of any kind of work at site, contractor has to submit quality
assurance plan and proceed for approval to competent authority and execute the
work accordingly.
17) Before execution of any kind of work at site, contractor has to submit level sheet
and finalise FRL from Engineer-in-Charge and/or his authorized representative of
AUDA/PMC execute the work accordingly.
18) Contractor has to rectify all the defects which are to be found during defect liability
period as suggested by PMC/Agency appointed by AUDA/Engineer-in-Charge and/or
his authorized representative.
19) After satisfactory completion of work in prescribed time limit, contractor has to
conduct pavement condition survey with Engineer-in-Charge and/or his authorized
representative along with prescribed format in every Six months also strictly check
after monsoon in defect liability period and submit report with colour photographs
to concern Engineer-in-Charge and/or his authorized representative.
20) After submission of report, if any road defects found in defect liability period,
contractor has to remedies the defect of road within prescribed time format as per
tender condition as suggested by Engineer-in-Charge and/or his authorized
representative with his own cost duly certified with testing certificate.
21) As suggested by Engineer-in-Charge and/or his authorized representative, third
party proof checking of work and charges of proof checking has to be borne by
contractor during work and in defect liability of work.
22) If the Bidders removes the existing speed breaker/bump approved by traffic
department, then such speed breaker/bump must be constructed by the Bidders as
per AMC norms and as per instruction of Engineer-in-charge. If the Bidders fails to
construct such speed breaker/bumps then Bidders will be responsible for any type of
23) All the correspondence with the Client and Project Management consultant shall be
done in English/Gujarati language only. If required for specific correspondence its
translation in Gujarati language may be provided whenever asked by the Authority.
24) Interested bidder shall note that the Project requires coordination with multiple
departments of forest, Street Light, Estate, as well as other service providing
agencies like Torrent, Adani Gas, BSNL, UGVCL,GETCO,ONGC,IOCL etc.. and other
communication cable agencies like Reliance Jio, TATA, Air-Tel etc.. Bidder shall
coordinate with all such departments / agencies for smooth execution of the work as
& when required.
25) Bidder shall get clearance from City/Rural Traffic Police Department for Traffic
Diversion and vehicle permit and for any other activities if required.
26) Bidder shall stack the material on site in such a way that it should not obstruct traffic
movement, and no accident occurs.
27) Bidders can work for 24 hours a day, 7 days a week.
28) Contractor has to submit monthly progress report to concern head of department.
B. Other Works - General
1) During the period of the contract, the right of way and all existing roads shall be kept
open for traffic and maintained in a safe and usable condition. Residents along and
adjacent to the works are to be provided with safe convenient access to their
properties at all times. Traffic control and traffic diversions shall be used as
necessary to protect the work and maintain them as directed by the engineer and
provided in the contract.
2) All aspects of quality assurance of various components of the work
3) Clearing of site and handing over of the works;
Ahmedabad Urban Development Authority (A.U.D.A.)
4) Rectification of the defects in the completed works during the defects liability
5) Submission of as-built drawings and other related documents with GIS mapping of
the machine holes and catchpits.
2.0 Documents comprising bid
The E bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must upload the scanned copies of following
documents along with the submission of online bidding:
• Scanned copy of Tender Fee
• Scanned Copy of EMD
• Scanned Copy of Required Registration Certificate
• Scanned copies of original documents defining the constitution or legal status, place of
registration, and principal place of business
• Scanned Copy of Solvency Certificate
• An affidavit on a Stamp Paper, duly attested from the Notary Public, that the information
furnished with the bid documents is correct in all respects.
• scanned copy of valid written power of attorney of the signatory of the Bid to commit the
Failure to submit these certificates/documents shall make the bid non-responsive.
Though, the scanned copies of above mentioned documents is required to be uploaded
during submission of e-bid on the e-tendering portal of (n) procure, however, following
original documents in physical form in two copies, one marked as “original” and other
marked as “Duplicate”, shall be submitted in a sealed envelope by 18:00 Hrs on the date of
physical submission of bid and addressed to the addressee given in the NIT duly super
scribed “Name of Work, Bid due date and time, Name and address of the bidder”
• Bid security (EMD)
• Tender Processing Fee
• Certificate of “AA” class having "Road special category I" in Road Works in PWD in Govt.
R&B/CPWD/AUDA or equivalent register with any other state Govt. or institutions.
• Bidder shall have own 1 No. batch mix plant of minimum up to 120 TPH capacity in running
and good/operational condition and within the limit of 50 km from the boundary of kalol
and vaishnodevi area (JURISIDICTION OF SECTION-4).
• Memorandum of Association/Articles of Association as filed before the Register of
• Original copy of valid written Power of Attorney of the signatory (whose digital signature
certificate is used during e-tender submission) of the bidder to commit the bid. This power
of Attorney shall not be older than 1 year from the date of last date of online submission
• If the application is made by a firm in partnership, it shall be signed by all the partners of
the firm, above their full names and current addresses or by a partner holding the power
of attorney of the firm by signing of the application in which case a certified copy of power
of attorney shall accompany the application. A certified copy of the partnership deed,
current address of the firm and the full names, and current address of all the partners of
the firm shall also accompany the application.
• If the application is made by limited company or a limited corporation, it shall be signed by
a duly authorized person holding the power of attorney for signing the application which
case, a certified copy of the power of attorney shall accompany the application. Such
limited company or corporation will be required to furnish satisfactory evidence of its
existence before the contract is awarded.
Ahmedabad Urban Development Authority (A.U.D.A.)
• Bidder shall have to submit the power of attorney for the person who will going to sign the
measurement book. In case of employee, If the holder of this power of Attorney will leave
the job, the contractor immediately shall have to submit the fresh power of Attorney for
the newly appointed person.
• Bidder's financial capability and standing over at least last three years and relevant
• Current Income Tax Clearance Certificate.
• Bidder's present commitments.
• The technical ability and qualifications of the bidder. Details of technical personnel with
their qualification & experience as per SBD Documents.
• A list of the equipment the bidder possessed and that which he proposed to acquires and
use for the purpose related to the work per SBD Documents.
• Bank Solvency Certificate.
• Affidavits duly notarized (as per the format provided)
• Notarized copy of experience certificate from concerned department not ranked below
Executive Engineer or equivalent, showing that the Bidder has successfully completed
required numbers of similar work in his own name.
• Undertakings mentioned in SBD Documents (Qualification Information).
• Audited balance sheets for last three years.
• Any other material / information required to be submitted in accordance with these
Instructions to Bidders (ITB)
• Form 26AS of last three financial year
3.1 The Contractor shall have full regard throughout execution, completion and defects liability
period to following safety aspects and shall take all necessary steps to ensure that danger to
safety is avoided all the time in respect of,
a. Safety of the works
b. Safety of the Contractor’s employees and all the persons directly or indirectly engaged
by him for the works
c. Safety of all the employees including persons working on other contracts of Employer at
the same site of the Employer and Engineers employees engaged at work site.
d. Any authorised third party persons on the site.
e. Contractor’s plant and equipment
3.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing, warning
signs, barricading, and cones; when and where necessary, or required by Engineer-in-Charge
and/or his authorized representative or by any duly constituted authority for the protection
of the works or for the safety and convenience of the public or other.
3.3 The Contractor shall take all reasonable steps to protect the environment on and off the site
and avoid damage or nuisance to persons or property of the public and others arising as a
consequence of his method of operation.
3.4 The Contractor shall maintain in good condition all work throughout execution, completion,
and defects liability period. The contractor shall be responsible for and to make good all
injuries, damages and repairs, rendered necessary by fire, rain, traffic, floods or other
3.5 All the scaffolding work, wherever required for the execution of work, shall be provided by
the contractor. Nothing extra shall be payable on this account. It shall be provided strictly
with double scaffolding system with all the accessories etc. with adjustable suitable working
platforms to access the areas, with ease for working and inspection. It shall be designed to
take all incidental loads. It should cater to the safety features for workmen. It shall be
ensured that no damage is caused to any structure due to scaffolding.
3.6 All temporary warning/ caution boards display such as “Construction Work in progress”,
“Keep Away", “No parking”, “Speed limit”, Diversion”, etc. shall be provided and displayed
Ahmedabad Urban Development Authority (A.U.D.A.)
during day as well as night time by the contractor, wherever required and as directed by the
Engineer. A signboard with project description, Name of client Project, etc. should be
displayed at proper locations as directed by the Engineer at no extra cost.
3.7 Arrangement of temporary water and electricity and telephone connection required, by him,
shall be made by the Contractor at his own cost and also necessary permissions directly from
relevant Owners shall be obtained by him under intimation to the Owner. Also all initial and
running charges and security deposit, if any in this regard shall be borne by him. The
Contractor shall abide by all the rules/ bye laws applicable in this regard and he shall be
solely responsible for any penalty on account of violation of any of the rules and byelaws in
3.8 During execution of works and in defect liability period ,In any case if any fatal accident
(major or minor) occurs due to poor work and poor safety precautions, then it will be
completely contractor’s responsibility and compensation for the same has to be paid by
tenderer. During execution of works and in defect liability period, If any news is published in
print/Electronic/Social media regarding inferior quality of work and poor safety precautions,
and due to inferior quality work any fatal injuries occurs, all the losses due to such accidents
and expenses of legal matters shall be borne by contractor.
3.9 The Contractor shall be responsible for maintenance and watch and ward of the complete
installation and shall also be responsible for any pilferage, theft, damage, penalty etc. in this
regard. The Contractor shall indemnify the Owner against any claim arising out of pilferage /
theft, damage, penalty etc. whatsoever on this account. Security deposit for the work shall
be released only after the clearance is obtained from the local authorities from whom
temporary electric/ water I telephone connection have been obtained by the contractor.
3.10 The Contractor shall depute Site Engineer & skilled workers as required for the work.
Necessary protective and safety equipments shall be provided to them by the Contractor at
his own cost and used at site.
3.11 If the contractor dose not provide experienced personnel like Plant Engineer, Site Engineer
etc, then the AUDA may impose additional penalty which will be decided by Engineer-in-
Charge and/or his authorized representative. And it will be binding to the contractor and
such penalty may be deducted from contractor bill/Payment.
4.0 Security & Traffic Arrangements
4.1 In event of any restriction being imposed by the Security Staff of Owner, Ahmedabad Urben
Development Authority (AUDA), Government or any other local governing body having
control over the project, on the working or movement of labour, materials, the Contractor
shall strictly follow all such restrictions or instructions issued regarding the same and
nothing extra shall be payable to the Contractor on account of such restrictions or
instructions. In case of loss of time on this account if any, shall have to be made up by
generating additional resources etc.
4.2 General security restrictions are given as under:
i. The movement of trucks and vehicles shall be regulated in accordance with rules
and regulations as approved by competent authorities.
ii. The Contractor shall inform in advance, if required, the truck registration numbers
ownership of the trucks, names, and addresses of the drivers for necessary action by
the security agency.
iii. As and when there will be security requirements, certain additional restrictions can
be imposed as per the requirement of the situation.
iv. No claim whatsoever will be entertained by the Owner on account of any restriction
that can be imposed as per the requirement of the situation.
Ahmedabad Urban Development Authority (A.U.D.A.)
4.3 No inflammable materials including P.O.L. shall be allowed to be stored in huge quantity at
site. However, reasonable quantity may be permitted for storage, subject to the compliance
of all rules & instructions issued by the relevant authorities and as per the direction of
Engineer -in- Charge in this regard.
4.4 Contractor shall be fully responsible for any person’s injury or death which arises during and
in consequence of the performance of the contract. Employer, Engineer, Engineer’s
representative shall not be responsible for the same.
5.0 Possession of the Site
5.1 The Contractor shall commence the work as soon as is reasonably possible on receipt of the
“Commencement of Work Notice” from the Engineer.
5.2 The Employer shall give possession of part / parts of the Site to the Contractor from time to
5.3 The site of work shall be always kept clean. The excavated material shall be disposed off as
directed by the Engineer, from the premises and all necessary permissions in this regard
from the local bodies shall be obtained by the contractor. The rubbish, construction debris
etc. shall not be allowed to be collected at site or to be disposed into any public place. The
work shall be carried out in such a way that the area is kept clean and tidy without causing
any nuisance. Nothing extra shall be payable on this account.
6.0 Avoidance to damage of roads.
The Contractor shall ensure that no damage to roads and bridges on the route to the sites
occurs due to him or his subcontractor’s traffic. He shall ensure minimum possible hindrance
to the traffic movements on public roads and bridges due to his materials, plant, temporary
works etc. No materials shall be stacked on public roads and thoroughfares. The
damaged/dug/excavated road shall be reinstating during construction within a period of
days on completion of activity to its original condition.
7.0 Transport of Contractor’s equipment
The Contractor shall specifically notify the Employer and the Engineer in case he plans to
transport materials, equipment, plant etc. which might induce such loads on roads and
bridges en route to site for which the roads and bridges are not designed. In every such case
the Contractor shall carry out all such strengthening works as may be necessary to ensure
the safety of the roads/ bridges. All such works should be approved by the Engineer in
writing. The Contractor, despite the strengthening measures and written approval by the
Engineer, shall be responsible for the safety of the roads and bridges as well as his own
plant, materials and equipments.
8.0 Opportunities and Facilities for other Contractors Opportunities:
8.1 The Contractor shall afford all reasonable opportunities to,
a. any other contractor and his workmen engaged by the Employer
b. the Workmen of the Employer
c. Workmen of any other agency permitted by the Employer to work in or around the site
8.2 Facilities:
d. Make available any roads or ways for the maintenance of which the Contractor is
e. Permit the use of any temporary works or Contractors Equipment on site. (to be charged
wherever applicable).
Ahmedabad Urban Development Authority (A.U.D.A.)
f. Provide any other services of whatsoever nature (to be chargeable wherever applicable.)
9.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All wreckage
rubbish, excess materials, temporary works no longer required will be removed from site
10.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus materials,
rubbish, temporary works of every kind, except those Contractors equipment, surplus
materials, rubbish, temporary works that may be required by him during the Defects Liability
period and leave the site clean and in a workmanlike condition to the satisfaction of the
Engineer on issue of the Taking Over Certificate.
Ahmedabad Urban Development Authority (A.U.D.A.)
Ahmedabad Urban Development Authority (A.U.D.A.)
This work shall consist of cutting, removing and disposing of all materials such as trees, bushes,
shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 300 mm in thickness, rubbish
etc., which in the opinion of the Engineer arc unsuitable for incorporation in the works, from,
the area of road land containing road embankment, drains, cross-drainage structures and such
other areas as may be specified on the drawings or by the Engineer. It shall include
necessary excavation, backfilling of pits resulting from uprooting of trees and stumps to required
compaction, handling, salvaging, and disposal of cleared materials. Clearing and grubbing
shall be performed in advance of earthwork operations and in accordance with the
requirements of these specifications.
Preservation of Property/Amenities
Roadside trees, shrubs, any other plants, pole lines, fences, signs, monuments, buildings, pipelines,
sewers and all highway facilities within or adjacent to the highway which are not to be disturbed
shall be protected from injury or damage. The Contractor shall provide and install at his
own expense, suitable safeguards approved by the Engineer for this purpose.
During clearing and grubbing, the Contractor shall take all adequate precautions against soil
erosion, water pollution, etc., and where required, undertake additional works to that effect
vide Clause 306. Before start of operations, the Contractor shall submit to the Engineer for
approval, his work plan including the procedure to be followed for disposal of waste
materials, etc. and the schedules for carrying out temporary and permanent erosion
control works as stipulated in Clause 306.3.
Methods, Tools and Equipments
Only such methods, tools and equipment as are approved by the Engineer and which will not
affect the property to be preserved shall be adopted for the Work. If the area has thick
Ahmedabad Urban Development Authority (A.U.D.A.)
vegetation/roots/trees, a crawler or pneumatic tyred dozer of adequate capacity may be used
for clearance purposes. The dozer shall have ripper attachments for removal of tree stumps. All
trees, stumps, etc., failing within excavation and fill lines shall be cut to such depth below
ground level that in no case these fall within 500 mm of the subgrade. Also, all vegetation
such asroots,under-growth, grass and other deleterious matter unsuitable for incorporation in
the embankment/subgrade shall be removed between fill lines to the satisfaction of the
Engineer. On areas beyond these limits, frees and stumps required to be removed as
directed by the Engineer shall be cut down to 1 m below ground level so that these do not
present an unsightly appearance.
All branches of trees extending above the roadway shall be trimmed as directed by the
All excavations below the general ground level arising out of the removal of trees, stumps, etc.,
shall be filled with suitable material and compacted thoroughly so as to make the surface at
these points conform to the surrounding area.
Ant-hills both above and below the ground, as are liable to collapse and obstruct free subsoil
water flow shall be removed and their workings, whichmay extend to several metres shall be
suitably treated.
Disposal of Materials
All materials arising from clearing and grubbing operations shall be the property of
Government and shall be disposed of by the Contractor as hereinafter provided or directed by
Trunks,branches and stumps of trees shall be cleaned of limbs and roots and stacked. Also
boulders, stones and other materials usable in road construction shall be neatly stacked as
directed by the Engineer. Stacking stumps, boulders, stones etc., shall be done at specified
spots with all lifts and upto a lead of 1000 m.
All products of clearing and grubbing which, in the opinion of the Engineer, cannot be used or
auctioned shall be cleared away from the roadside in a manner as directed by the Engineer.
Care shall be taken tosee that unsuitable waste materials are disposed of in such a manner
thatthere is no likelihood of these getting mixed up with the materials meant for embankment,
subgrade and road construction.
Measurements for Payment
Clearing andgrubbing for road embankment, drains and cross-drainage structures shall be
measured on area basis in terms of Hectare. Clearing and grubbing of borrow areas shall be
deemed to be a part of workspreparatory to embankment construction and shall be deemed
10 have been included in the rates quoted for the embankment construction item and no
separate payment shall be made for the same. Cutting oftrees upto 300 mm in girth including
removal of stumps and roots, and trimming of branches of trees extending above the roadway
shall be considered incidental to the clearing and grubbing operations. Removal of stumps left
over after trees have been cut by any other agency shall also be considered incidental to
the clearing and grubbing operations.
Cutting, including removal of stumps and roots of trees of girth above 300 mm and backfilling
to required compaction shall be measured in terms of number according to the sizes given
Ahmedabad Urban Development Authority (A.U.D.A.)
i) Above 300 mm to 600 mm
ii) Above 600 mm to 900 mm
iii) Above 900 mm to 1800 mm
iv) Above 1800mm
For this purpose, the girth shall be measured at a height of 1 metre above ground or at the
top of the stump if the height of the stump is less than one metre from the ground.
206.6.1 The Contract unit rates for the various items of clearing and grubbing shall
be payment in full for carrying out the required operations including full compensation for
all labour, materials, tools, equipment and incidentals necessary to complete the work. These
will also include removal of stumps of trees less than 300 mm in girth as well as stumps left
over after cutting of trees carried out by another agency, excavation and back-filling to
required density, where necessary and handling, salvaging, piling and disposing of the
cleared materials with all lifts and upto a lead of 1000 m.
The Contract unit rate for cutting (including removal of stumps and roots) of trees of girth
above 300 mm shall include excavation and backfilling to required compaction, handling,
salvaging piling and disposing of the cleared materials with all lifts and uptoa lead of
Where a Contract does not include separate items of clearing and grubbing, the same shall be
considered incidental to the earth work items and the Contract unit prices for the same
shall be considered including clearing and grubbing operations.
Loosening of soils by meachanical means including rolling and watering with power roller and
filling depressions which occur during process etc.comp as directed.
PreparationofCutFormation
The cut formation, which serves as a sub-grade, shall be prepared to receive the
sub-base/ base course as directed by the Engineer.
Where the material in the subgrade has a density less than specified in Table 300-
1, the same shall be loosened to a depth of 200 mm and compacted in layers in
accordance with the requirements of Clause 305 adding fresh material, if any
required, to maintain the formation level as shown on the drawings. Any
unsuitable material encountered in the subgrade level shall be removed as
directed by the Engineer, replaced with suitable material and compacted in
accordance with Clause
MeasurementsforPayment
Works involved in the preparation of cut formation
Looseningandrecompactingtheloosenedmaterialatsubgrade. The work measure in squremeter of
the area loosened and compacted.
Ahmedabad Urban Development Authority (A.U.D.A.)
The Contract unit rate for loosening and recompacting the loosened materials at
subgrade shall include full compensation for loosening to the specified depth,
including breaking clods, spreading in layers, watering where necessary and
compacting to the requirements.Rate is inclusive of all labour, materials, tools,
equipment., safety measures, testingand incidentals necessary to complete the
work to Specifications.
Dismantling the following including loading, unloading and disposal of unserviceable
material for all lead or as directed by Engineer-In-Charge and stacking the serviceable
material and backfilling the resulting trenches and pits complete.
a. central verge -kerb stone.
b. Dismantling tiled or stone floors laid in mortar including stacking of serviceable material
and disposal of unserviceable material with all lead and lifts.
c. Demolition & disposal of unserviceable material with all lead and lift for unreinforced
d. Demolition of brick work & stone masonry including stacking of serviceable materials
and disposal of unserviceable materials with all lead and lift (1) In cement mortar.
e. Demolition including stacking of serviceable materials and disposal of unserviceable
materials with all lead and lift. (I) R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified or
shown in the drawings. Demolition implies taking up or down or breaking up. This shall consist of
demolishing whole or part of work including all relevant item as specified or shown in the drawings.
The demolition shall always be planned before hand and shall be done in reverse order of the one in
which the structure was constructed. Contractor is fully responsible for proper and safe demolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work
or property, which is to be left intact, before dismantling and demolishing is taken up and the work
shall be carried out in such a way that no damages is caused to the adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be
damaged by dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled
first. The dismantled articles shall be properly stacked as directed.
All materials obtained from demolition shall be the property of Government unless otherwise d shall
be kept in safe custody until handed over to the Engineer-in-charge.
Ahmedabad Urban Development Authority (A.U.D.A.)
Any serviceable materials, obtained during dismantling or demolition shall be separated out and
stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b
stacked as directed by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition dismantling and no
allowance for increase in bulk shall be allowed. The demolition of lime concrete shall be measured
under this item. Specification for deduction for voids, openings etc. shall be on same basis as that
employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following limits,
unless otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b)
Area shall be worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be worked out
to the nearest 0.01 Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and dismantling
including scaffolding. The rate shall also include the charges for separating out and stacking the
serviceable materials properly and disposing the unserviceable materials with all lead and lift. The
rate also includes for temporary storing for the safety of the portion not required to be pulled down
or of adjoining property and providing temporary enclosures or partitions where considered
The rate shall be for a unit of one cubic metre.
For Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on
mortars shall be done Dismantling implies carefully taking up or down or these are fixed by nail
screws bolts etc. the shall be taken out with proper tools.
Mode of measurement &Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate shall
include stacking the unserviceable materials as directed will lead and lift.
The rate shall be for a unit of one sq. meter.
Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including demolishing the asphalt carpet, metal, soiling/cutting
Reinforcement etc. comp. with stacking the material as directed.
The Item shall be carried out as per Item description and as per instruction of Engineer-in-Charge
and/or his authorized representative.
Ahmedabad Urban Development Authority (A.U.D.A.)
The rate includes the cost of excavation of bituminous macadam i.e. bituminous layers only
like DBM, BC etc including the labours, tools, equipment and all other incidental expenses.
Non Bituminous Sub-layer/Sub base are not considered in this item.
Work shall be carried out manually or by Machinery as per site requirements.
The mode of payment for this item shall be on Smt. Basis.
Barricading the entire break down or excavated area on lumsum rental basis using
wooden ballies / M.S. angles at max. 2.0 meter center to center, C.G.I sheet, reflective
paint out side to avoided accident and for smooth traffic diversion and movement
including cautionary board etc. the same shall be removed after completion of work.
The height of the barricades should be minimum 1.20 mt from the ground level. The Item shall be
carried out as per Item description and as per instruction of Engineer-in-Charge and/or his
authorized representative. After removal of barricades, all material related to barricading shall be
property of the contractor.
The mode of payment for this item shall be on Rmt. Basis.
Earthwork in cutting in all sorts of soil and soft murrum including conveying and spreading the
stuff, embankment as and where directed within 200meters from the end of the cutting with all
required lead and lifts .
The sub grade / sub base / base to receive the water bound macadam course shall be
prepared to the specified grade and camber and made of dust and other extraneous
materials. Any nets of soft places shall be corrected in on approved manner and rolled until
Cutting shall be paid on cross section area as established by the longitudinal level and cross
sections for this purpose. The work shall be started after the initial longitudinal section of
the ground and cross sections are taken and recorded.
The final surface shall confirm to proper profile, camber and super elevation etc. as directed
by the Engineer including rolling for making base for subgrade layer / grade layer as the case
may be. The earthwork shall be paid on sectional measurements, cross sectional etc. taken.
No allowance or payments shall be made for materials excavated prior to the taking of level
by the Engineer.
The rate is inclusive of cutting in all soil and murrum including removal of all shrubs, jungle
cutting, cutting stuff in slopes, side drain bank, rolling for making base etc. complete.
This item also includes the clearing the sides and demarking the line as per requirement and
cutting out the existing tress on the road side, not extra payment will be paid for.
At the time of preparing final bill, the road formation in embankment and cutting shall have
be perfect condition true to grade, camber and side slope duly dressed and damages due to
rain cuts etc. during entire working period shall have to be done by the contractor.
Ahmedabad Urban Development Authority (A.U.D.A.)
The work taken in length shall be completed in all respects viz. width, grades, camber, side
drains, side slopes, rolling for making base etc. and measurements for incomplete work shall
not be taken otherwise.
1.0 Mode of Measurement &Payment :
The unit rate box cutting shall include the cost of all materials, tools and plant required for
excavation in all type of soils in grade and camber, line and levels and finishing as per
direction of the Engineer-in-charge, excavation and all other incidental expenses for
producing item of box cutting of specified breadth and depth and grade to complete the
item or its components including rolling for making base and also including depositing the
excavated earth in case to be used for road work formation with rolling etc. complete as
directed by Engineer in charge.
The box cutting shall be measured for its cross section area and compacting volumes in
cubic metres by the method of average areas.
The rate will be made on Cubic Meter basis of the finished work.
Earth work for embankment including breaking of clods, dressing with all lead and lift including
watering and consolidation from borrow area within all lead and lift.
EMBANKMENT CONSTRUCTION
Description: These Specifications shall apply to the construction of embankments including
sub grades, earthen shoulders and miscellaneous backfills with approved materials obtained
from roadway and drain excavation, borrow pits or other sources. All embankments, sub
grades, earthen shoulders and miscellaneous backfills shall be constructed in accordance
with the requirements of these specifications and in conformity with the lines, grades and
cross-sections shown on the drawings or as directed by the Engineer.
Materials and General Requirements
Physical requirements :
The materials used in embankments, sub grades, earthen shoulders and miscellaneous
backfills shall be soil, murrum, gravel, a mixture of these or any other material approved by
the Engineer. Such materials shall be free of logs, stumps, roots, rubbish or any other
ingredient likely to deteriorate or affect the stability of the embankment sub grade.
The following types of material shall be considered unsuitable for embankment:
Materials from swamps, marshes and bogs;
Peat, log, stump and perishable material; and soil that classifies as OL,OI,OH or Pt in
accordance with IS:1498;
Materials susceptible to spontaneous combustion;Materials in a frozen condition;
Clay having liquid limit exceeding 70 and plasticity index exceeding 45; and
Materials with salts resulting in leaching in the embankment.
Expansive clay exhibiting marked swell and shrinkage, properties (“free swelling index”
exceeding 50 percent when tested as per IS:2720-Part 40) shall not be used as a fill material.
Where an expansive clay with acceptable “free swelling index” value is used as a fill
material, sub grade and top 500mm portion of the embankment just below sub grade shall
be non-expansive in nature.
Ahmedabad Urban Development Authority (A.U.D.A.)
Any fill material with a soluble sulphate content exceeding 1.9 grams of sulphate (expressed
as SO3) per liter when tested in accordance with BS:1377 Test 10, but using a 2:1 water-soil
ratio shall not be deposited within 500 mm or other distance described in the Contract, of
concrete, cement bound materials or other cementations materials forming part of the
Permanent Works.
Materials with a total sulphate content (expressed as SO3) exceeding 0.5 per cent by mass,
when tested in accordance with BS: 1377 Test 9 shall not be deposited within 500 mm or
other distances described in the contract, of metallic items forming part of the Permanent
The size of the coarse material in the mixture of earth shall ordinarily not exceed 75mm
when being placed in the embankment and 50 mm when placed in the sub grade. However,
the Engineer may at his discretion permit the use of material coarser than this also if he is
satisfied that the same will not present any difficulty as regards the placement of fill
material and its compaction to the requirements of these specifications. The maximum
particle size shall not be more than two-thirds of the compacted layer thickness.
General Requirements:
The materials for embankment shall be obtained from approved sources with preference
given to materials becoming available from nearby roadway excavation or any other
excavation under the same Contract.
The work shall be so planned and executed that the best available materials are saved for
the sub grade and the embankment portion just below the sub grade.
Borrow materials: Where the materials are to be obtained from designated borrow areas,
the location, size and shape of these areas shall be as indicated by the Engineer and the
same shall not be opened without his written permission. Where specific borrow areas are
not designated by the Employer/the Engineer, arrangement for locating the source of supply
of materials for embankment and sub grade as well as compliance to environmental
requirements in respect of excavation and borrow areas as stipulated, from time to time by
the Ministry of Environment and Forests, Government of India and the local bodies, as
applicable, shall be the sole responsibility of the Contractor.
Borrow pits along the road shall be discouraged. If permitted by the Engineer, these shall
not be dug continuously. Ridges of not less than 8 m width should be left at intervals not
exceeding 300m.Small drains shall be cut through the ridges to facilitate drainage. The
depth of the pits shall be so regulated that their bottom does not cut an imaginary line
having a slope of 1 vertical to 4 horizontal projected from the edge of the final section of
the bank, the maximum depth in any case being limited to 1.5 m. Also no pit shall be dug
within the offset width from the toe of the embankment required as per the consideration
of stability with a minimum width of 10 m.
Haulage of material to embankments or other areas of fill shall proceed only when sufficient
spreading and compaction plant is operating at the place of deposition.
No excavated acceptable material other than surplus to requirements of the Contract shall
be removed from the site. Should the contractor be permitted to remove acceptable
material from the site to suit his operational procedure, then he shall make good any
consequent deficit of material arising therefore.
Ahmedabad Urban Development Authority (A.U.D.A.)
Where the excavation reveals a combination of acceptable and unacceptable materials, the
Contractor shall, unless otherwise agreed by the Engineer, carry out the excavation in such a
manner that the acceptable materials are excavated separately for use in the permanent
works without contamination by the unacceptable materials. The acceptable materials shall
be stockpiled separately.
The Contractor shall ensure that he does not adversely affect the stability of excavation or
fills by the methods of stockpiling materials, use of plants or sitting of temporary buildings
The Contractor shall obtain representative samples from each of the identified borrow areas
and have these tested at the site laboratory following a testing programme approved by the
Engineer. It shall be ensured that the sub grade material when compacted to the density
requirements as in Table 300-2 shall yield the design CBR value of the sub grade.
Construction Operations :
Setting Out: After the site has been cleared to Clause 201, the work shall be set out to
Clause 301.3.1.The limits of embankment/sub grade shall be marked by fixing batter pegs on
both sides at regular intervals as guides before commencing the earthwork. The
embankment/sub grade shall be built sufficiently wider than the design dimension so that
surplus material may be trimmed, ensuring that the remaining material is to be desired
density and the position specified and conforms to the specified side slopes.
Dewatering: If the foundation of the embankment is in an area with stagnant water, and in
the opinion of the Engineer it is feasible to remove it, the same shall be removed by bailing
out or pumping, as directed by the Engineer and the area of the embankment foundation
shall be kept dry. Care shall be taken to discharge the drained water so as not to cause
damage to the works, crops or any other property. Due to any negligence on the part of the
Contractor, if any such damage is caused, it shall be the sole responsibility of the Contractor
to repair./restore it to original condition or compensate the damage at his own cost.
If the embankment is to be constructed under water, Clause 305.4.6 shall apply.
Stripping and Storing topsoil: In localities where most of the available embankment
materials are not conducive to plant growth, or when so directed by the Engineer, the
topsoil from all areas of cutting and from all areas to be covered by embankment foundation
shall be stripped to specified depths not exceeding 150 mm and stored in stockpiles of
height not exceeding 2 m for covering embankment slopes, cut slopes and other disturbed
areas where re-vegetation is desired. Topsoil shall not be unnecessarily trafficked either
before stripping or when in a stockpile. Stockpiles shall not be surcharged or otherwise
loaded and multiple handling shall be kept to a minimum.
Compacting ground supporting embankment/Sub grade:
Where necessary, the original ground shall be leveled to facilitate placement of first layer of
embankment, scarified, mixed with water and then compacted by rolling.
Where so directed by the Engineer, any unsuitable material occurring in the embankment
foundation shall be removed and replaced by approved materials laid in layers to the
required degree of compaction.
Embankment or sub grade work shall not proceed until the foundations for
embankment/sub grade have been inspected by the Engineer for satisfactory condition and
Spreading material in layers :
Ahmedabad Urban Development Authority (A.U.D.A.)
The embankment and sub grade material shall be spread in layers of uniform thickness not
exceeding 200mm compacted thickness over the entire width of embankment by mechanical
means, finished by a motor grader and compacted.
Moisture content of the material shall be checked at the site of placement prior to
commencement of compaction; if found to be out of agreed limits, the same shall be made
good. Where water is required to be added in such constructions, water shall be sprinkled
from a water tanker fitted with sprinkler capable of applying water uniformly with a
controllable rate of flow to variable widths of surface but without any flooding. The water
shall be added uniformly and thoroughly mixed in soil by balding, dicing or barrowing until a
uniform moisture content is obtained throughout the depth of the layer.
If the material delivered to the roadbed is too wet, it shall be dried, by aeration and
exposure to the sun, till the moisture content is acceptable for compaction. Should
circumstances arise, where owing to wet weather, the moisture content can not be reduced
to the required amount by the above procedure, compaction work shall be suspended.
After adding the required amount of water, the soil shall be processed by means of graders,
harrows, rotary mixers or as otherwise approved by the Engineer until the layer is uniformly
Clods or hard lumps of earth shall be broken to have a maximum size of 75 mm when being
placed in the embankment and a maximum size of 50 mm when being placed in the sub
Embankment and other areas of fill shall, unless otherwise required in the Contract or
permitted by the Engineer, be constructed evenly over their full width and their fullest
possible extent and the Contractor shall control and direct construction plant and other
vehicular traffic uniformly over them. Damage by construction plant and other vehicular
traffic shall be made good by the Contractor with material having the same characteristics
and strength as the material had before it was damaged.
Embankments and other areas of unsupported fills shall not be constructed with steeper
side slopes, or to greater widths than those shown in the Contract, except to permit
adequate compaction at the edges before trimming back, or to obtain the final profile
following any settlement of the fill and the underlying material.
Whenever fill is to be deposited against the face of a natural slope, or sloping earthworks
face including embankments, cutting, another fills and excavations steeper than 1 vertical
on 4 horizontal, such faces shall be benched as per Clause 305.4.1 immediately before
placing the subsequent fill.
All permanent faces of side slopes of embankments and other areas of fill formed shall,
subsequent to any trimming operations, be reworked and sealed to the satisfaction of the
Engineer by tracking a tracked vehicle, considered suitable by the Engineer, on the slope or
any other method approved by the Engineer.
Compaction: Only the compaction equipment approved by the Engineer shall be employed
to compact the different material types encountered during construction. Vibratory rollers
of suitable size and capacity as approved by the Engineer shall be used for the different
types and grades of materials required to be compacted either individually or in suitable
The compaction shall be done with the help of power roller of 80 to 100 kN static weight
with plain or pad foot drum or heavy pneumatic tyred roller of adequate capacity capable of
achieving required compaction.
Ahmedabad Urban Development Authority (A.U.D.A.)
The Contractor shall demonstrate the efficacy of the equipment he intends to use by
carrying out compaction trials.
When density measurements reveal any soft areas in the embankments / subgrade / earthen
shoulders, further compaction shall be carried out as directed by the Engineer. If inspite of
that the specified compaction is not achieved, the material in the soft areas shall be
removed and replaced by approved material, compacted to the density requirements and
satisfaction of the Engineer.
Drainage :The surface of the embankment/subgrade at all times during construction shall be
maintained at such a cross fall (not flatter than that required for effective drainage of an
earthen surface) as will shed water and prevent ponding.
Repairing of damages caused by rain/spillage of water :
The soil in the affected portion shall be removed in such areas as directed by the Engineer
before next layer is laid and refilled in layers and compacted using appropriate mechanical
means such as small vibratory roller, plate compactor or power rammer to achieve the
required density in accordance with Clause 305.3.6 If the cut is not sufficiently wide for use
of required mechanical means for compaction, the same shall be widened suitably to permit
their use for proper compaction. Tests shall be carried out as directed by the Engineer to
ascertain the density requirements of the repaired area. The work of repairing the damages
including widening of the cut, if any, shall be carried out by the Contractor at his own cost,
including the arranging of machinery/equipment for the purpose.
Finishing operations:
Finishing operations shall include the work of shaping and dressing the shoulders/verge/
roadbed and side slopes to conform to the alignment, levels, cross sections and dimensions
shown on the drawings or as directed by the Engineer subject to the surface tolerance
described in Clause 902. Both the upper and lower ends of the side slopes shall be rounded
off to improve appearance and to merge the embankment with the adjacent terrain.
The topsoil, removed and conserved earlier (Clause 301.3.2 and 305.3.3) shall be spread
over the fill slopes as per directions of the Engineer to facilitate the growth of vegetation.
Slopes shall be roughened and moistured slightly prior to the application of the topsoil in
order to provide satisfactory bond. The depth of the top soil shall be sufficient to sustain
plant growth, the usual thickness being from 75 mm to 150 mm.
Where directed, the slopes shall be turfed with sods in accordance with Clause 307. If
seeding and mulching of slopes is prescribed, this shall be done to the requirement of Clause
Construction of Embankment and subgrade under special conditions.
Earthwork for widening existing road embankment :
When an existing embankment and/or subgrade is to be widened and its slopes are steeper
than 1 vertical on 4 horizontal , continuous horizontal benches, each at least 300 mm wide,
shall be cut into the old slope for ensuring adequate bond with the fresh embankment /
subgrade material to be added. The material obtained from cutting of benches could be
utilized in the widening of the embankment/subgrade. However when the existing slope
against which the fresh material is to be placed is flatter than 1 vertical on 4 horizontal, the
slope surface may only be ploughed or scarified instead of resorting to benching.
Ahmedabad Urban Development Authority (A.U.D.A.)
Where the width of the widened portions is insufficient to permit the use of conventional
rollers, compaction shall be carried out with the help of small vibratory rollers/plate
compactors/power rammers or any other appropriate equipment approved by the Engineer.
End dumping of material from trucks for widening operations shall be avoided except in
difficult circumstances when the extra width is too narrow to permit the movement of any
other types of hauling equipment.
Earthwork for embankment and subgrade to be placed against sloping ground:-
Where an embankment /subgrade is to be placed against sloping ground, the latter shall be
appropriately benched or ploughed/scarified as required in Clause 305.4.1 before placing
the embankment/subgrade material. Extra earthwork involved in benching or due to
ploughing / scarifying etc. shall be considered incidental to the work.
For wet conditions, benches with slightly inward fall and subsoil drains at the lowest point
shall be provided as per the drawings, before the fill is placed against sloping ground.
Where the contract requires construction of transverse subsurface drain at the cut-fill
interface, work on the same shall be carried out to Clause 309 in proper sequence with the
embankment and subgrade work as approved by the Engineer.
Earthwork over existing road surface:-
Where the embankment is to be placed over an existing road surface, the work shall be
carried out as indicated below:-
If the existing road surface is of granular or bituminous type and lies within 1 m of the new
subgrade level, the same shall be scarified to a depth of 50mm or more if specified, so as to
provide ample bond between the old and new material ensuring that at least 500 mm
portion below the top of new subgrade level is compacted to the desired density.
If the existing road surface is of cement concrete type and lies within 1 m of the new
subgrade level the same shall be removed completely.
If the level difference between the existing road surface and the new formation level is
more than 1 m. the existing surface shall be permitted to stay in place without any
Embankment and subgrade around structures :-
To avoid interference with the construction of abutments, wing walls or return walls of
culvert/bridge structures, the Contractor shall, at points to be determined by the Engineer
suspend work on embankment forming approaches to such structures, until such time as the
construction of the latter is sufficiently advanced to permit the completion of approaches
without the risk of damage to the structure.
Unless directed otherwise, the filling around culverts, bridges and other structures upto a
distance of twice the height of the road from the back of the abutment shall be carried out
independent of the work on the main embankment. The fill material shall not be placed
against any abutment or wing wall, unless permission has been given by the Engineer but in
any case not until the concrete or masonry has been in position for 14 days. The
embankment and subgrade shall be brought up simultaneously in equal layers on each side
of the structure to avoid displacement and unequal pressure. The sequence of work in this
regard shall be got approved from the Engineer.
Where it may be impracticable to use conventional rollers, the compaction shall be carried
out by appropriate mechanical means such as small vibratory roller, plate compactor or
Ahmedabad Urban Development Authority (A.U.D.A.)
power rammer. Care shall be taken to see that the compaction equipment does not hit or
come too close to any structural member so as to cause any damage to them or excessive
pressure against the structure.
Construction of embankment over ground incapable of supporting construction equipment.
Where embankment is to be constructed across ground which will not support the weight of
repeated heavy loads of construction equipment, the first layer of the fill may be
constructed by placing successive loads of material in a uniformly distributed layer of a
minimum thickness required to support the construction equipment as permitted by the
Engineer. The Contractor, if so desired by him, may also use suitable geosynthetic material
to increase the bearing capacity of the foundation. This exception to normal procedure will
not be permitted where, in the opinion of the Engineer, the embankments could be
constructed in the approved manner over such ground by the use of lighter or modified
equipment after proper ditching and drainage have been provided. Where this exception is
permitted, the selection of the material and the construction procedure to obtain an
acceptable layer shall be the responsibility of the Contractor. The cost of providing suitable
traffic conditions for construction equipment over any area of the Contract, will be the
responsibility of the Contractor and no extra payment will be made to him. The remainder of
the embankment shall be constructed as specified in Clause 305.3.
Embankment construction under water :
Where filling or backfilling is to be placed under water, only acceptable granular material or
rock shall be used unless otherwise approved by the Engineer. Acceptable granular material
shall consist of graded, hard durable particles with maximum particle size not exceeding
75mm. The material should be non-plastic having uniformity coefficient of not less than
The material placed in open water shall be deposited by end tipping without compaction.
Earthwork for high embankment :-
In the case of high embankments, the Contractor shall normally use the material from the
specified borrow area. In case he desires to use different material for his own convenience,
he shall have to carry out necessary soil investigations and redesign the high embankment at
his own cost. The contractor shall then furnish the soil test data and design of high
embankment for approval of the Engineer, who reserves the right to accept or reject it.
If necessary, stage construction of fills and any controlled rates of filling shall be carried out
in accordance with the Contract including installation of instruments and its monitoring.
Where required, the contractor shall surcharge embankments or other areas of fill with
approved material for the periods specified in the Contract. If settlement of surcharged fill
results in any surcharging
Material, which is unacceptable for use in the fill being surcharged, laying below formation
level, the Contractor shall remove the unacceptable material and dispose it as per direction
of the Engineer. He shall then bring the resultant level upto formation level with acceptable
Settlement period :- Where settlement period is specified in the Contract, the embankment
shall remain in place for the required settlement period before excavating for abutment,
wing wall, retaining wall, footings, etc. or driving foundation piles. The duration of the
required settlement period at each location shall be as provided for in the contract or as
directed by the Engineer.
Plying of Traffic :
Ahmedabad Urban Development Authority (A.U.D.A.)
Construction and other vehicular traffic shall not use the prepared surface of the
embankment and/or subgrade without the prior permission of the Engineer. Any damage
arising out of such use shall, however be made good by the Contractor at his own expense
as directed by the Engineer.
Surface Finish and Quality Control of Work :-
The surface finish of construction of subgrade shall conform to the requirements of Clause
902. Control on the quality of materials and works shall be exercised in accordance with
Subgrade Strength :-
It shall be ensured prior to actual execution that the borrow area material to be used in the
subgrade satisfies the requirements of design CBR.
Subgrade shall be compacted and finished to the design strength consistent with other
physical requirements. The actual laboratory CBR values of constructed subgrade shall be
determined on undisturbed samples cut out from the compacted subgrade in CBR mould
fitted with cutting shoe or on remoulded samples, compacted to the field density at the field
moisture content.
Measurements for Payment :-
Earth embankment/subgrade construction shall be measured separately by taking cross
sections at intervals in the original position before the work starts and after its completion
and computing the volumes of earthwork in cubic metres by the method of average end
The measurement of fill material from borrow areas shall be the difference between the net
quantities of compacted fill and the net quantities of suitable material brought from
roadway and drainage excavation. For this purpose, it shall be assumed that one cu.m. of
suitable material brought to site from road and drainage excavation forms one cu.m. of
compacted fill and all bulking or shrinkage shall be ignored.
Construction of embankment under water shall be measured in cu.m.
Construction of high embankment with specified material and in specified manner shall be
measured in cum.
Stripping including storing and reapplication of topsoil shall be measured in cu.m.
Work involving loosening and recompacting of ground supporting embankment/subgrade
shall be measured in cu.m.
Removal of unsuitable material at embankment/subgrade foundation and replacement with
suitable material shall be measured in Cu.m.
Scarifying existing granular/bituminous road surface shall be measured in Square metres.
Dismentaling and removal of existing cement concrete pavement shall be measured vide
Filter medium and backfill material behind abutments, wing walls and other retaining
structures shall be measured as finished work in position in cu.m.
The Contract unit rates for the items of embankment and subgrade construction shall be
payment in full for carrying out the required operations including full compensation for :
Cost of arrangement of land as a source of supply of material of required quantity for
construction unless provided other wise in the contract.
Ahmedabad Urban Development Authority (A.U.D.A.)
Compacting ground supporting embankment/subgrade except where removal and
replacement of unsuitable material or loosening and recompacting is involved;
Scarifying or cutting continuous horizontal benches 300mm wide on side slopes of existing
embankment and subgrade as applicable;
Cost of watering or drying of material in borrow areas and/or embankment and subgrade
during construction as required;
Spreading in layers, bringing to appropriate moisture content and compacting to
specification requirements;
Shaping and dressing top and slopes of the embankment and subgrade including rounding of
Restricted working at sites of structures;
Working on narrow width of embankment and subgrade;
Excavation in all soils from borrow pits/designated borrow areas including clearing and
grubbing and transporting the material to embankment and subgrade site with all lifts and
leads unless otherwise provided for in the contractor.
All labour, material, tools, equipment and incidentals necessary to complete the work to the
Specifications;
Keeping the embankment/completed formation free of water as per Clause
In case the Contract unit rate specified is not inclusive of all leads, the unit rate for
transporting material beyond the initial lead, as specified in the contract for construction of
embankment and subgrade shall be inclusive of full compensation for all labour, equipment,
tools and incidentals necessary on account of the additional haul or transportation involved
beyond the specified initial lead.
Measurement shall be taken and paid in Cu.m.
Collecting carting, stacking , spreading and levelling coarse sand in 150 mm thick compacted layer
including watering up to OMC ,rolling and consolidation with power roller etc complete as
1. Material for the purpose shall be of approved quality of 150 mm thick coarse sand which is
found inferior shall be rejected and the contractor shall remove such rejected material from the site
at his own cost. The material shall be collected from source approved by the Executive Engineer. The
material shall be granular and gritty.
2. The material shall be got approved by the Executive Engineer prior to collection on site It
shall be free from all rubbish, dust and any organic materials as well as clods of black cotton soils
Materials shall not be allowed to be collected from within the road boundary. Material to be used as
crust and for side shoulders shall be as per (CBR not less than 10%) report and that to be use
blindage in W.B.M. road construction shall have P.I. value of less than 6 as determined in accordance
with IS 2720 (Part-V). The material to be used should be got tested prior to its use in road
construction. Testing charges shall be borne by the contractor.
Ahmedabad Urban Development Authority (A.U.D.A.)
3. River or nala or sea sand required for the work shall be clear, sound, properly, graded, free
from organic materials silt clay etc. (CBR not less than 10%) and shall be got approved by the
Engineer-m-charge. The sand shall be obtained and brought from the source approved by the
Engineer-in-charge. The sand shall be well graded. The payment shall be made on Cubic Metre basis
4. For road work completed stacking of sand as per requirement shall be carried out in 2 K.M.
length before spreading. The collection shall always, be commenced at one end of the K.M. and-be
carried continuously toward the other end unless the Engineer-in-charge shall direct otherwise.
Spreading sand :
The sand shall be spread uniformly and evenly upon the prepared sub grade/sub-base/ base
to profile. Sand placed at locations which are inaccessible to the spreading equipment may be
spread in one or more layers by any approved means so as to achieve the specified results.
The spreading shall be done from stockpiles-along, the side of the roadway.
The surface of the sand spread shall be carefully checked with templates and all high or low spots
remedied by removing or adding sand as may be required. The surface shall be checked frequently
with a straight edge while spreading and rolling so as to (ensure a finished surface as par drawings.
The sand shall not normally be spread more than 3 days in advance of the subsequent construction
Immediately following the spreading of the sand, rolling shall be started with vibratory
rollers. The type of roller to be used shall be approved by the engineer based on trial run.
Except on super elevated portions where the rolling shall proceed from inner edge to the
outer, rolling shall begin from the edges gradually progressing towards the centre. First the
edge/edges shall be compacted with roller running forward and backward. The roller shall then
move inward parallel to the centre line of the road, in successive passes uniformly lapping preceding
tracks by at least one half width.
During rolling, slight sprinkling of water may be done, if necessary. Rolling shall not be done when
the sub grade is soft or yielding or when it causes a wave-like motion in the sub grade or sub base
The rolled surface shall be checked transversely and longitudinally, with templates and any
irregularities corrected by loosening the surface, adding or removing necessary amount of
aggregates and re-rolling until the entire surface conforms to desired cross fall (camber) and grade.
In no case shall the use of screenings be permitted to make up depressions.
Material which gets crushed excessively during compaction or becomes segregated shall be removed
and replaced with suitable aggregates.
5. The payment shall be made on cubic meter basis without deduction for voids. The
contractor shall maintain all stacks in regular and proper size till the whole materials are collected,
measured and finally accepted by the Department. The spreading of materials shall not be allowed
till the materials are fully stacked and completed kilometer wise,
6. The rate includes cost of collection, conveyance to the site with all lead and lift, spreading &
compacting with vibratory rollers including all labour, tools, equipment and other incidental
7. The rate quoted is inclusive of all shall such tools, duties, fees, royalties, taxes etc.
Ahmedabad Urban Development Authority (A.U.D.A.)
Construction of granular sub base for hard side shoulders by providing coarse graded quarry spall
material, spreading in uniform layers on prepared surface, mixing by mechanical means and
placing with rotavator at OMC and compacting with vibratory roller to achieve the desired density
complete as per Clause 400.1 grade-I.
Construction of granular sub-base(GSB-III) by providing coarse sand in 150mm thick compacted
layer including leveling, watering upto OMC, rolling and consolidation with vibratory roller etc.
complete as directed
Construction of 300mm ThickGrannular sub base(GSB-I) by providing coarse graded material using
B.T Metal 53 mm to 26.50 mm @ 35 % ,26.50 mm to 4.75mm 45% & Coarse sand below 2.36 mm
20 % in uniform layer with motor grader on prepared surface mxing by mix in place method with
vibratory roller to achive the desired density complete as per close 401. (RA-4)
This work shall consist of laying and compacting natural sand, natural gravel material on prepared
sub grade. The material shall be laid in one or more layers as sub-base or lower sub-base and upper
sub-base as directed by the Engineer.
Maximum particle size of the corresponding grading for the natural sand, gravel materials are given
at Table 9-1. The grading to be adopted for a project shall be as specified in the Contract. If the
thickness of GSB layer is more than 150 mm then the sub-base is required to laid in two layers as
upper sub-base and lower sub-base.
Table 15-1 : Grading for Granular Sub-base Materials
IS Sieve Percent by Weight Passing the IS Sieve
Designation Grading I Grading II Grading III
Table 15-2 : Physical Requirements for Materials for Granular Sub-base
Ahmedabad Urban Development Authority (A.U.D.A.)
Aggregate Impact Value (AIV) IS:2386(Part4) or Maximum
Liquid Limit IS:2720 (Part 5) Maximum
Plasticity Index IS:2720 (Part 5) Maximum
CBR at 98% dry density (at IS:2720 (Part 5) Minimum
IS:2720-Part 8)
Construction Operations :-
Preparation of Sub-grade
Immediately prior to the laying of sub-base, the subgrade already finished shall be prepared by
removing all vegetation and other extraneous matter, lightly sprinkled with water, rolled with two
passes of 80-100 kN smooth wheeled roller.
Spreading and Compacting
The sub-base material of the grading specified in the Contract shall be spread on the prepared sub
grade with the help of a motor grader of adequate capacity, its blade having hydraulic controls
suitable for initial adjustment and for maintaining the required slope and grade during the
operation, or other means as approved by the Engineer.
Manual mixing shall be permitted only where the width of laying is not adequate for mechanical
operations as in small sized jobs. The equipment used for mix-in-place construction shall be a
rotavator or similar approved equipment capable of mixing the material to the desired degree. If so
desired by the Engineer, trial runs with the equipment shall be carried out to establish its suitability
Moisture content of the loose material shall be checked in accordance with IS:2720 (Part 2) and
suitably adjusted by sprinkling additional water from a truck mounted or trailer mounted water tank
and suitable for applying water uniformly and at controlled quantities to variable widths of surface
or other means approved by the Engineer so that, at the time of compaction, it is from 1 per cent
above to 2 per cent below the optimum moisture content corresponding to IS: 2720 (Part 8). While
adding water, due allowance shall be made for evaporation losses. After water has been added, the
material shall be processed by mechanical or other approved means like disc harrows, rotavators
until the layer is uniformly wet.
Immediately after spreading the mix, rolling shall be done by an approved roller. If the thickness of
the compacted layer does not exceed 100 mm, a smooth wheeled roller of 80 to 100 kN weight may
be used. For a compacted single layer upto 200 mm the compaction shall be done with the help of a
vibratory roller of minimum 80 to 100 kN static weight capable of achieving the required
Ahmedabad Urban Development Authority (A.U.D.A.)
compaction. Rolling shall commence at the lower edge and proceed towards the upper edge
longitudinally for portions having unidirectional cross fall or on super elevation. For carriageway
having cross fall on both sides, rolling shall commence at the edges and progress towards the crown.
Each pass of the roller shall uniformly overlap not less than one-third of the track made in the
preceding pass. During rolling, the grade and cross fall (camber) shall be checked and any high spots
or depressions which become apparent, corrected by removing or adding fresh material. The speed
of the roller shall not exceed 5 km per hour.
Rolling shall be continued till the density achieved is at least 98 percent of the maximum dry density
for the material determined as per IS:2720 (Part 8). The surface of any layer of material on
completion of compaction shall be well closed, free from movement under compaction equipment
and from compaction planes, ridges, cracks or loose material. All loose, segregated or otherwise
defective areas shall be made good to the full thickness of layer and re-compacted.
Surface Finish and Quality Control of Work :-
CONTROL OF ALIGNMENT, LEVEL AND SURFACE REGULARITY
All works performed shall conform to the lines, grades, cross sections and dimensions shown on the
drawings or as directed by the Engineer, subject to the permitted tolerances described herein-after.
Horizontal Alignment
Horizontal alignment shall be reckoned with respect to the centre line of the carriageway as shown
on the drawings. The edges of the carriageway as constructed shall be correct within a tolerance of ±
10 mm therefrom. The corresponding tolerance for edges of the roadway and lower layers of
pavement shall be ± 25 mm.
The levels of the subgrade and different pavement courses as constructed, shall not vary from those
calculated with reference to the longitudinal and cross-profile of the road shown on the drawings or
as directed by the Engineer beyond the tolerances mentioned in below Table.
Table: Tolerances in Surface Levels
1) Subgrade ±20 mm
a) Flexible pavement ±10 mm
b) Concrete pavement ±6 mm
3) Base-course for flexible pavement
Ahmedabad Urban Development Authority (A.U.D.A.)
a) Bituminous Base/Binder course ±6 mm
i) Machine laid ±10 mm
ii) Manually laid ±15 mm
4) Wearing course for flexible pavement
a) Machine laid ±6 mm
b) Manually laid ±10 mm
5) Cement concrete pavement ±5 mm
Provided, however, that the negative tolerance for wearing course shall not be permitted in
conjunction with the positive tolerance for base course, if the thickness of the former is thereby
reduced by more than the following limits:
• 4 mm for bituminous wearing course of thickness 40 mm or more
• 3 mm for bituminous wearing course of thickness less than 40 mm
• 5 mm for concrete pavement slab
For checking compliance with the above requirement for subgrade, sub-base and base course,
measurements of the surface levels shall be taken on a grid of points placed at 6.25 m longitudinally
and 3.5 m transversely. For any 10 consecutive measurements taken longitudinally or transversely,
not more than one measurement shall be permitted to exceed the tolerance as above, this one
measurement being not in excess of 5 mm above the permitted tolerance.
For checking the compliance with the above requirement for bituminous wearing courses and
concrete pavements, measurements of the surface levels shall be taken on a grid of points spaced at
6.25 m along the length and at 0.5 m from the edges and at the centre of the pavement. In any
length of pavement, compliance shall be deemed to be met for the final road surface, only if the
tolerance given above is satisfied for any point on the surface.
Surface Regularity of Pavement Courses
The longitudinal profile shall be checked with a 3 metre long straight edge/moving straightedge as
directed by the Engineer at the middle of each traffic lane along a line parallel to the centre line of
The maximum permitted number of surface irregularities shall be as per given Table
Table : Maximum Permitted Number of Surface Irregularities
Surfaces of Surfaces of Laybys, Service
Carriageways and Paved Areas and all Bituminous
Ahmedabad Urban Development Authority (A.U.D.A.)
Shoulders Base Courses
Irregularity 4 mm 7 mm 4 mm 7 mm
Number of Surface 15 9 2 1 40 18 4
Irregularities on National
Highways/ Expressways*
Number of Surface 40 18 4 2 60 27 6
Irregularities on Roads of
lower Category*
* Category of each section of road as described in the Contract.
The maximum allowable difference between the road surface and underside of a 3 m straightedge
when placed parallel with, or at right angles to the centre line of the road at points decided by the
Engineer shall be:
for pavement surface (bituminous and cement concrete) 3 mm
for bituminous base courses 6 mm
for granular sub-base/base courses 8 mm
for sub-bases under concrete pavements 10 mm
for subgrade 15 mm
Where the surface regularity of subgrade and the various pavement courses fall outside the
specified tolerances, the Contractor shall be liable to rectify these in the manner described below
and to the satisfaction of the Engineer.
i) Subgrade: Where the surface is high, it shall be trimmed and suitably compacted. Where the
same is low, the deficiency shall be corrected by scarifying the lower layer and adding fresh material
and recompacting to the required density. The degree of compaction and the type of material to be
used shall conform to the requirements of tender document.
ii) Granular Sub-base: Same as at (i) above, except that the degree of compaction and the type
of material to be used shall conform to the requirements of tender document.
iii) Lime/Cement Stabilized Soil Sub-base: For lime/cement treated materials where the surface
is high, the same shall be suitably trimmed while taking care that the material below is not disturbed
due to this operation. However, where the surface is low, the same shall be corrected as described
herein below. For cement treated material, when the time elapsed between detection of irregularity
and the time of mixing of the material is less than 2 hours, the surface shall be scarified to a depth of
50 mm, supplemented with freshly mixed materials as necessary and recompacted as per the
relevant specification. When this time is more than 2 hours, the full depth of the layer shall be
Ahmedabad Urban Development Authority (A.U.D.A.)
removed from the pavement and replaced with fresh material to Specification. This shall also apply
to lime treated material except that the time criterion shall be 3 hours instead of 2 hours.
iv) Water Bound MacadamA/Vet Mix Macadam Sub-base/Base: Where the surface is high or
low, the top 75 mm shall be scarified, reshaped with added material as necessary and recompacted
v) Bituminous Constructions: For bituminous construction other than wearing course, where
the surface is low, the deficiency shall be corrected by adding fresh material over a suitable tack
coat, if needed, and recompacting as per specifications. Where the surface is high, the extra
thickness in the affected layer shall be removed and replaced with fresh material and compacted to
Specifications. For wearing course, where the surface is high or low, the full depth of the layer shall
be removed and replaced with fresh material and compacted to specifications. In all cases where the
removal and replacement of a bituminous layer is involved, the area treated shall not be less than
m in length and not less than 3.5 m in width.
If deemed necessary by the Engineer, any section of the slab which deviates from the specified levels
and tolerances shall be demolished and reconstructed at the Contractor's cost.
The riding quality of bituminous concrete wearing surface, as measured by a standard towed fifth
wheel bump integrator, shall not be more than 2000 mm per Km.
Control on the quality of materials and works shall be exercised by the Engineer as per Table 400-3.
Table 15-3 : Test and Frequency for Materials for Granular Sub-base
Type of Test Frequency (As per IS Code
Construction Circular No. 66)
Granular Gradation One test per 400 Cu.m. IS:2386, Part-I-
Atterberg Limits One test per 400 Cu.m. IS:2720, Part-V
(Liquid Limit, Plasticity
Moisture content prior One test per 400 Cu.m. IS:2720, Part-II
Density of compacted One test per 1000 sq.m IS:2720, Part-VIII
CBR As required IS:2720, Part-XVI
Arrangements for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor
shall take all necessary measures for the safety of traffic during construction and provide, erect and
maintain such barricades, including signs, marking, flags, lights and flagmen as per instruction of the
Engineer-in-charge.
Measurements for Payment
Ahmedabad Urban Development Authority (A.U.D.A.)
The rate shall be for a unit of one cubic meter.
Providing & laying WBM 100 mm compacted thickness of using B.T. Crushed metal of size 45 mm
to 90 mm @ 1.21Cum material for 10 sqm, stone screening Grading Type A 13.2 mm @ 0.27 cum
per 10 sqm,Stone dust @ 0.1 Cum per 10 Sqm, including spreading ,watering & consolidation by
vibratory roller etc complete and as directed by Engineer in Charge.
Providing & laying WBM 100mm compacted thickness of using B.T. Crushed metal of size 45 mm
to 63 mm @ 1.21 Cum material for 10 sqm, stone screening Grading Type B 11.2 mm @ 0.26 cum
per 10 sqm,Stone dust @ 0.13 Cum per 10 Sqm, including spreading ,watering & consolidation by
vibratory roller etc complete and as directed by Engineer in Charge..
This work shall consist of clean, machine crushed B.T. stone aggregates mechanically
interlocked by rolling and bonding together with screening, binding material where necessary and
water laid on a properly prepared sub grade/ sub bases base or existing pavement, as the case may
be and finished in accordance with the requirements of these specifications and in close conformity
with the lines, grades, cross-sections and thickness as per approved plans or as directed by the
404-2. Materials
404.2.1 Coarse aggregates
Coarse aggregates shall be either crushed or broken stone, crushed slag, overburnt (Jhama)
brick aggregates or any other naturally occurring aggregates such as kankar and laterite of suitable
quality. Materials other than crushed gravel / shingle is used, not less than 90 percent by weight of
the gravel / shingle pieces retained on 4.75mm sieve shall have at least two fractured faces. The
aggregates shall conform to the physical requirements set forth in Table 400-8. The type and size
range of the aggregate shall be specified in the contract or shall be as specified by the Engineer. If
the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test
shall be carried out on the material delivered to site as per IS:2386 (Part-5).
TABLE 400-8. PHYSICAL REQUIREMENTS OF COARSE AGGREGATES FOR
WATER BOUND MACADAM FOR SUB-BASE / BASE COURSES
S.No. Test Test Method Requirement
1. *** Los Angeles IS:2386 40 percent (Max)
Abrasion value (Part-4)
Aggregate IS: 2386 30 percent (Max)
Impact value (Part-4) or
Ahmedabad Urban Development Authority (A.U.D.A.)
Flakiness and IS:2386 30 percent (Max)
Elongation - (Part- 1)
Indices (Total)**
* Aggregate which get softened in presence of water shall be tested for impact value under wet
conditions in accordance with IS:5640.
** The requirement of flakiness index and elongation index shall be enforced only in the case of
Crushed broken stone and crushed slag.
*** In case water bound macadam is used for sub-base, the requirements in respect of Los Angeles
Value and Aggregate impact value shall be relaxed to 50 percent and 40 percent maximum
404.2.2 Crushed or broken stone
The crushed or broken stone shall be hard, durable and free from excess flat, elongated, soft
and disintegrated particles, dirt and other deleterious material.
404.2.3. Crushed slag :
Crushed slag shall be made from air-cooled blast furnace slag. It shall be of angular shape,
reasonably uniform in quality and density and generally free from thin, elongated and soft pieces,
dirt or other deleterious materials. The weight of crushed slag shall not be less than 11.2 kN per m
and the percentage of glossy material shall not be more than 20. It should also comply with the
following requirements:
(i) Chemical stability : To comply with requirement of appendix of
(ii) Sulphur content : Maximum 2 per cent
(iii) Water absorption : Maximum 10 per cent
404.2.4. Overburnt (Jhama) Brick aggregates :
Jhama brick aggregates shall be made from overburnt bricks or brick bats and be free from
dust and other objectionable and deleterious materials. This shall be used only for road stretch
when traffic is low.
404.2.5. Grading requirement of Coarse aggregates :
The coarse aggregates shall conform to one of the Gradings given in Table 400-9 as specified.
404.2.6. Screenings:
Screenings to fill voids in the coarse aggregate shall generally consist of the same material as
the coarse aggregate. However, where permitted, predominantly non-plastic material such as murrum
or gravel (other than rounded river borne material) may be used for this purpose provided liquid limit
and plasticity index of such material are below 20 and 6 respectively and fraction passing 75 micron
sieve does not exceed 10 per cent.
TABLE 400-9 : GRADING REQUIREMENTS OF COARSE AGGREGATES
Grading Size Range IS Sieve Per cent by
No. Designation weight passing
Ahmedabad Urban Development Authority (A.U.D.A.)
Note : The compacted thickness for a layer shall be 100mm.
Screenings shall conform to the grading set forth in Table 400–10. The quantity of screenings
required for various grades of stone aggregates are given in Table 400–11. The table also gives the
quantities of materials (loose) required for 10 m2 for sub-base / base compacted thickness of
The use of screenings shall be omitted in the case of soft aggregates such as brick metal, kankar,
laterites etc. as they are likely to get crushed to a certain extent under rollers.
404.2.7 Binding Material :
Binding material to be used for water bound macadam as a filler material meant for preventing
ravelling, shall comprise of a suitable material approved by the Engineer having a Plasticity Index (PI)
value of less than 6 as determined in accordance with IS:2720 (Part 5).
The quantity of binding material where it is to be used will depend on the type of screening.
Generally, the quantity required for 75 mm compacted thickness of water bound macadam will be
TABLE 400 – 10. GRADING FOR SCREENINGS
Grading Size of IS Sieve Per cent by weight
Classification Screenings Designation passing the IS sieve
180 micron 0-10
180 micron 5-25
TABLE 400 – 11. APPROXIMATE QUANTITIES OF COARSE AGGREGATES AND SCREENINGS
REQUIRED FOR 75 MM COMPACTED THICKNESS OF WATER BOUND MACADAM (WBM) SUB-BASE
/ BASE COURSE FOR 10 M2AREA
Class Screenings
ificat Size Range Crushable type such
thickness Qty. Stone screening
ion as murrum or gravel
Ahmedabad Urban Development Authority (A.U.D.A.)
Grading For WBM sub- Grading
classification base / base classificati Loose
and size course (loose on and Qty.
Grad 90mm to 100 mm 1.21 to Type A 13.2 0.27to 0.30 m3 No 0.3 to
ing 1 45 mm 1.43m3 mm uniform 0.32 m3
Grad 63mm to 75 mm 0.91 to Type A 11.2 0.20 to 0.22 m3 No 0.22 to
ing 2 45 mm 1.07m3 mm uniform 0.24 m3
The above mentioned quantities should be taken as a guide only, for estimation of quantities for
construction etc.
Application of binding materials may not be necessary when the screenings used are of crushable
type such as murrum or gravel.
404.3 Construction Operations
404.3.1 Preparation of base :
The surface of the sub grade sub-base/base to receive the water bound macadam course
shall be prepared to the specified grade and camber and cleaned of dust, dirt and other extraneous
material. Any ruts or soft yielding places shall be corrected in an approved manner and rolled until
firm surface is obtained.
Where the WBM is to be laid on an existing metalled road, damaged area including
depressions and potholes shall be repaired and made good with the suitable material. The existing
surface shall be scarified and re-shaped to the required grade and camber before spreading the
coarse aggregate for WBM.
As far as possible, laying water bound macadam course over an existing bituminous layer may be
avoided since it will cause problems of internal drainage of the pavement at the interface of two
courses. It is desirable to completely pick out the existing thin bituminous wearing course where
water bound macadam is proposed to be laid over it.
404.3.2 Inverted Choke / Sub surface Drainage layer
If water bound macadam is to be laid directly over the subgrade, without any other intervening
pavement course, a 25 mm course of screenings (Grading B) or coarse sand shall be spread on the
prepared subgrade before application of the aggregates is taken up. In case of a fine sand or silty or
clayey subgrade, it is advisable to lay 100 mm insulating layer of screening or coarse sand on top of
Fine grained soil, the gradation of which will depend upon whether it is intended to act as a drainage
layer as well. As a preferred alternative to inverted choke, appropriate geosynthetics performing
functions of separation and drainage may be used over the prepared subgrade as directed by the
Engineer. Section 700 shall be applicable for use of geosynthetics.
404.3.3 Lateral Confinement of Aggregates
For construction of WBM, arrangement shall be made for the lateral confinement of aggregates. This
shall be done by building adjoining shoulders along with WBM layers. The practice of constructing
WBM in a trench section excavated in the finished formation must be completely avoided.
Where the WBM course is to be constructed in narrow widths for widening of an existing pavement,
the existing shoulders should be excavated to their full depth and width upto the sub grade level
except where widening specifications envisages laying of a stabilised sub base using in situ
operations in which case the same should be removed only upto the sub base level.
404.3.4 Spreading coarse aggregates:
Ahmedabad Urban Development Authority (A.U.D.A.)
The coarse aggregates shall be spread uniformly and evenly upon the prepared sub grade/sub-base/
in the required quantities from the stock piles to proper profile by using templates placed across the
road about. 6 m apart, in such quantities that the thickness of each compacted layer is not more
than 75 mm. In no case shall these be dumped in heaps directly on the area where there are to be
laid nor shall their hauling over a partly completed base be permitted. Wherever possible approved
mechanical devices such as aggregate spreader shall be used to spread the aggregates uniformly so
as to minimize the need for manual rectification afterwards.
No segregation of coarse aggregate shall be allowed and the coarse aggregates, as spread shall be of
uniform gradation with no pockets of fine material.
The surface of the aggregate spread shall be carefully checked with templates and all high or low
spots remedied by removing or adding aggregates as may be required. The surface shall be checked
frequently with a straight edge while spreading and rolling so as to ensure a finished surface as per
approved drawings.
The coarse aggregate shall not normally be spread more than 3 days in advance of the subsequent
construction operations.
404.3.5 Rolling:
Immediately following the spreading of the coarse aggregate, rolling shall be started with
three wheeled power rollers of 80 to 100 kN capacity or tandem or vibratory rollers of 80 to 100 kN
static weight. The type of roller to be used shall be approved by the Engineer based on trial run.
Except on super elevated portions and carriageway with unidirectional cross-fall, where the
rolling shall proceed from inner edge to the outer, rolling shall begin from the edges gradually
progressing towards the centre. First the edge/edges shall be compacted with roller running forward
and backward. The roller shall then move inward parallel to the centre line of the road, in successive
passes uniformly overlapping preceding tracks by at least one half width.
Rolling shall be carried out on courses where coarse aggregates of crushed / broken stone are used,
till the road metal is partially compacted. This will be followed by application of screening and
binding material where required in Clauses 404.3.6 and 404.3.7.
However, where screenings are not to be applied as in the case of aggregates like brick metal laterite
and kankar for the sub base construction, the compaction shall be continued until the aggregates are
thoroughly keyed. Rolling shall be continued and light sprinkling of water shall be done till the
surface is well compacted. Rolling shall not be done when the sub grade is soft or yielding or when it
causes a wave-like motion in the sub grade or sub base course.
The rolled surface shall be checked transversely with templates and longitudinally with 3 m. straight
edge. Any irregularities exceeding 12mm shall be corrected by loosening the surface, adding or
removing necessary amount of aggregates and re-rolling until the entire surface conforms to desired
camber and grade. In no case shall the use of screenings be permitted to make up depressions.
Material which gets crushed excessively during compaction or becomes segregated shall be removed
and replaced with suitable aggregates.
404.3.6 Application of screenings:
After the coarse aggregate have been rolled to Clause 404.3.5, screenings to completely fill the
interstices shall be applied gradually over the surface. These shall not be damp or wet at the time of
application. Dry rolling shall be done while the screenings are being spread so that vibrations of the
roller cause them to settle into the voids of the coarse Aggregate. The screenings shall not be
dumped in piles but be spread uniformly in successive thin layers either by the spreading motion &
of hand shovels or by mechanical spreaders or directly from tipper with suitable grit spreading
Ahmedabad Urban Development Authority (A.U.D.A.)
arrangement Tipper operating for spreading the screenings shall be equipped with pneumatic tyres
and operated so as not to disturb to coarse aggregates.
The screenings shall be applied at a slow and uniform rate (in three or more applications) so as to
ensure filling of all voids. This shall be accompanied by dry rolling and brooming with mechanical
brooms, hand brooms or both. In no case shall the screenings be applied so fast and thick as to form
cakes or ridges on the surface in such a manner as would prevent filling of voids or prevent the
direct bearing of the roller on the coarse aggregate. These operations shall continue until no more
screenings can be forced into the voids of the coarse aggregate.
The spreading, rolling and booming of screenings shall be carried out in only such lengths of the road
which could be completed within one day's operation.
404.3.7 Sprinkling of water and grouting :
After application of screenings, the surface shall be copiously sprinkled with water, swept and rolled.
Hand brooms shall be used to sweep the wet screenings into voids and to distribute them evenly.
The sprinkling, sweeping and rolling operation shall be continued, with additional screenings applied
as necessary until the coarse aggregate have been thoroughly keyed, well-bonded and firmly set in
its full depth and a grout has been formed of screenings. Care shall be taken to see that the sub base
or sub grade does not get damaged due to the addition of excessive quantities of water during
In case of lime treated soil sub-base, construction of water bound macadam on top of it shall be
taken up after curing as per Clause 402.3.9 and as directed by the Engineer.
Application of binding material :After the application of screenings in accordance with Clauses
404.3.6 and 404.3.7, the binding material where it is required to be used (Clause 404.2.7) shall be
applied successively in two or more thin layers at a slow and uniform rate. After each application,
the surface shall be copiously sprinkled with water, the resulting slurry swept in with hand brooms
or mechanical brooms to fill the voids properly and rolled during which water shall be applied to
the wheels of the rollers if necessary to wash down the binding material sticking to them. These
operations shall continue until the resulting slurry after filling of voids, form a wave ahead of the
wheels of the moving roller.
404.3.8 Setting and drying :
After the final compaction of water bound macadam course, the pavement shall be allowed to dry
overnight. Next morning hungry spots shall be filled with screenings or binding material as directed,
lightly sprinkled with water if necessary and rolled. No Traffic shall be allowed on the road until the
macadam has set. The Engineer shall have the discretion to stop hauling traffic from using the
competed water bound macadam course, if in his opinion it would cause excessive damage to the
The compacted water bound macadam course should be allowed to completely dry and set before
the next pavement course is laid over it.
404.4 Surface Finish and Quality Control of Work
404.4.1 The surface finish of construction shall conform to the requirements of Clause
404.4.2 Control on the quality of materials and works shall be exercised by the Engineer in
accordance with Section
404.4.3 The water bound macadam work shall not be carried out when the atmospheric
temperature is less than 10 C in the shade.
404.4.4 Reconstruction of defective macadam :
Ahmedabad Urban Development Authority (A.U.D.A.)
The finished surface of water bound macadam shall conform to the tolerance of surface
regularity as prescribed in Clause 902. However, where the surface irregularity of the course exceeds
the tolerances or where the course is otherwise defective due to sub grade soil mixing, with the
aggregates, the course to its full thickness shall be scarified over the affected area, reshaped with
added material or removed and replaced with fresh material as applicable and re-compacted. The
area treated shall not be less than 10 sq.m. In no case shall depressions be filled up with screenings
or binding material.
404.5 Arrangement for Traffic
During the period of construction, the arrangement for traffic shall be done as per Clause 112 of
404.6 Mode of Measurement & payment
Water bound macadam shall be measured as finished work in position in cubic meters.
The Contract unit rate for water bound macadam sub-base/base course shall be payable in full for
carrying out the required operations including full compensation for all components listed below
including arrangement of water used in the work as approved by the Engineer.
(i) Making arrangements for traffic to Clause 112 of morth except for initial treatment to
verges, shoulders and construction of diversions;
(ii) Supplying all materials to be incorporated in the work including all royalties, fees, rents
where applicable with all leads and lifts,
(iii) All labour, tools, equipment and incidental to complete the work to the Specifications
(iv) Carrying out the work in part widths of the road where required and
(v) Carrying out the required tests for quality control.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant carriage
of mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well
prepared surface and compacting with vibratory roller to achieve the desired density etc
Production & Supply of WMM to site of works
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular
material, premixed with water, to a dense mass on a prepared sub-grade/sub- base/ base or existing
pavement as the case may be in accordance with the requirements of these Specifications. The
material shall be laid in one or more layers as necessary to lines, grades and cross-sections shown on
the approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When
vibrating or other approved types of compacting equipment are used, the compacted depth of a
single layer of the sub-base course may be upto 200 mm with the approval of the Engineer.
Ahmedabad Urban Development Authority (A.U.D.A.)
Physical Requirements
Coarse aggregates shall be crushed stone. The aggregates shall conform to the physical
requirements set forth in Table 10-1. Sevaliya special aggregate is only acceptable.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test
shall be carried out on the material delivered to site as per IS:2386 (Part-5).
Table 16-1 : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base
S. No. Test Test Method Requirements
1. Los Angeles Abrasion value or IS:2386 (Part-4) 40 percent (Max.)
Aggregate Impact value
IS:2386 (Part-4) or 30 percent (Max.)
2. Combined Flakiness and IS:2386(Part-1) 35 percent (Max.)*
Elongation indices (Total)
* To determine this combined proportion, the flaky stone from a representative sample should
first be separated out. Flakiness index is weight of flaky stone metal divided by weight of stone
sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal.
Elongation index is weight of elongated particles divided by total non-flaky particles. The values of
flakiness index and elongation index so found are added up
Grading Requirements
The aggregates shall conform to the grading given in Table 10-2.
Table 16-2 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600 micron 8-22
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not
vary from the low limit on one sieve to the high limit on the adjacent sieve or vice versa.
Construction Operations:-
Ahmedabad Urban Development Authority (A.U.D.A.)
Preparation of Base
The surface of the sub-grade/sub-base/base to receive the Wet mix macadam course shall be
prepared to the specified grade and camber and cleaned of dust, dirt and other extraneous material.
Any ruts or soft yielding places shall be corrected in an approved manner and rolled until firm
surface is obtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including
depressions and potholes shall be repaired and made good with the suitable material. The existing
surface shall be scarified and re-shaped to the required grade and camber before spreading the
coarse aggregate for Wet mix macadam.
Preparation of Mix
Wet Mix Macadam should be prepared in an approved mixing plant of suitable capacity having
provision for controlled addition of water and forced/positive mixing arrangement like pugmill or
pan type mixer of concrete batching plant. For small quantity of wet mix work, the Engineer may
permit the mixing to be done in concrete mixers.
Quantity of water should not vary from OMC determined as per IS : 2720 (part VIII) by more than
agreed limit. The mixed material should be uniformly wet and no segregation should be permitted.
Spreading of mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared
subgrade/sub-base/base in required quantities. In no case should these be dumped in heaps directly
on the area where these are to be laid nor shall their hauling over a partly completed stretch be
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-
in-Charge and/or his authorized representative. For portions where mechanical means cannot be
used, manual means as approved by the Engineer shall be used. The motor grader shall be capable
of spreading the material uniformly all over the surface. Its blade shall have hydraulic control
suitable for initial adjustments and maintaining the same so as to achieve the specified slope and
The paver finisher shall be self-propelled, having the following features:
(i) Loading hoppers and suitable distribution mechanism
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it
is spread without rutting or otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished
surface is free from surface blemishes.
The surface of the aggregate shall be carefully checked with templates and all high or low sports
remedied by removing or adding aggregate as may be required. The layer may be tested by depth
Ahmedabad Urban Development Authority (A.U.D.A.)
blocks during construction. No segregation of layer and fine particles should be allowed. The
aggregates as spread should be of uniform gradation with no pockets of fine materials.
After the mix has been laid to the required thickness, grade and crossfall/camber the same shall be
uniformly compacted, to the full depth with suitable roller. If the thickness of single compacted layer
does not exceed 100 mm, smooth wheel roller of 80 to 100 kN weight may be used. For a compacted
single layer upto 200 mm, the compaction shall be done with the help of vibratory roller of minimum
static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not exceed
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower
edge and progress gradually towards the upper edge. Thereafter, roller should progress parallel to
the centre line of the road, uniformly over-lapping each preceding track by at least one third width
until the entire surface has been rolled. Alternate trips of the roller shall be terminated in stops at
least 1 m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward
until the edges have been firmly compacted. The roller shall then progress gradually towards the
centre parallel to the centre line of the road uniformly overlapping each of the preceding track by at
least one-third width until the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other
cause shall be corrected at once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly
compacted with mechanical tampers or a plate compactor. Skin patching of an area without
scarifying the surface to permit proper bonding of the added material shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like
motion in the sub-base/base course or subgrade. If irregularities develop during rolling which exceed
12 mm when tested with a 3 metre straight edge, the surface should be loosened and premixed
material added or removed as required before rolling again so as to achieve a uniform surface
conforming to the desired grade and crossfall. In no case should the use of unmixed material be
permitted to make up the depressions. Rolling shall be continued till the density achieved is at least
98 per cent of the maximum dry density for the material as determined by the method outlined in IS
After completion, the surface of any finished layer shall be well-closed, free from movement under
compaction equipment or any compaction planes, ridges, cracks and loose material. All loose,
segregated or otherwise defective areas shall be made good to the full thickness of the layer and
Setting and drying:
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam
surface till it has dried and the wearing course laid.
Ahmedabad Urban Development Authority (A.U.D.A.)
Surface Finish and Quality Control of Work
Surface evenness:
The surface finish of construction shall conform to the requirements of Clause in Item No.
Quality control:
Control on the quality of materials and works shall be exercised by the Engineer as per Table 10-3.
Table 16-3 : Test and Frequency for Materials for Wet Mix Macadam
Type of Test Frequency (As per IS Code
Construction Circular No. 66)
Wet Mix Gradation One test per 200 Cu.m. IS:2386, Part-I-
Aggregate Impact One test per 1000 Cu.m. IS:2386, Part-IV
Combined Flakiness One test per 500 Cu.m. IS:2386, Part-I
and Elongation Indices
Atterberg Limits of One test per 200 Cu.m. IS:2720, Part-V
portion of aggregates
passing 425 micron
Density of compacted One set of three tests IS:2720, Part-VIII
layer per 1000 sq.m
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances
or where the course is otherwise defective due to subgrade soil getting mixed with the aggregates,
the full thickness of the layer shall be scarified over the affected area, reshaped with added
premixed material or removed and replaced with fresh premixed material as applicable and
recompacted. The area treated in the aforesaid manner shall not be less than 5 m long and 2 m
wide. In no case shall depressions be filled up with unmixed and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for the traffic shall be provided. The Contractor
shall take all necessary measures for the safety of traffic during construction and provide, erect and
maintain such barricades, including signs, marking, flags, lights and flagmen as per instruction of the
Engineer-in-charge.
Ahmedabad Urban Development Authority (A.U.D.A.)
Measurements for Payment
Providing and laying 50 mm thick compectedBitumenous Grout Base Course Using BT Aggregate
0.66 Cmt per MT as per ‘Gradation’ using asphalt VG-40 (60/70)grade mixing with aggregate at
the rate of 1.99 % i.e.19.90 Kg/MT of total Mix & bitumen for tack coat at 2.50 kg. / 10 sq.m.on
WMM Surface incl.cleaning& heating the aggregate and asphalt by contineous batching of Drum
mix plant and spreading the same by paver finisher and consolidation with vibratory roller
including providing all materials , equipment ,tools and plants, oil, kerosene, firewood, labour
charges etc.complete using contracter's own machinaries Drum mix plant and paver finisher etc.
The work shall consist of construction, in a single course of compacted
crushed aggregates premixed with a bituminous binder, to serve as base/binder course, laid
immediately after mixing, on a base prepared previously in accordance with the
requirement of these Specifications and in conformity with the lines, grades and cross-
sections shown on the drawing or as directed by the Engineer. Thickness of the course shall
be 50mm materials.
Bitumen: The bitumen shall be paving bitumen of suitable viscositygradeVG-40 (60/70) as per IS:73.
The actual grade of bitumen to be used shall be decided by the Engineer appropriate to the region,
traffic, rainfall and other environmental conditions. Guidelines on selection of the grade of bitumen
are given in Appendix-4.
Viscosity Grade (VG) Bitumen Specification as per IS 73 :
Characteristics VG - 10 VG-20 VG-40 VG-40
Absolute Viscosity 60C, poises, min 800 1600 2400
Kinematic Viscosity 135C CSI, min 250 300 350
Flash point, C, min 220 220 220
Solubility in trichloroethylene, % min 99.0 99.0 99.0
Penetration at 25C 80-100 60-80 50-70 40-60
Softening point, C min 40 45 47
Test on residue from thin film oven test / RTFOT :
(A) Viscosity ration at 60C, max 4.0 4.0 4.0
(B) Ductility at 25C, cm, min after thin film over 75 50 40
The aggregates shall consist of crushed stone, crushed gravel/shingle or other stones. They shall be
clean, strong, durable, of fairly cubical shape and free from disintegrated pieces, organic or other
deleterious matter and adherent coating. The aggregates shall preferably be hydrophobic and of low
porosity. If hydrophilic aggregates are to be used, the bitumen shall preferably be treated with anti-
stripping agents of approved quality in suitable dose as per Appendix-5. The aggregates shall satisfy
the physical requirements set forth in Table 500-3.
TABLE 500-3. PHYSICAL REQUIREMENTS OF AGGREGATES FOR
BITUMINOUS GROUT
Ahmedabad Urban Development Authority (A.U.D.A.)
S. No. Test Test Method Requirement
1 Los Angeles Abrasion Value IS:2386 (Part - 4) 40 percent
2 Aggregate Impact Value* -do- 30 percent Maximum
3 Flakiness and Elongation IS: 2386 (Part - 1) 30 percent Maximum
Indices (Total)**
4 Coating and Stripping ofAASHTO T 182 Minimum retained
Bitumen Aggregate Mixtures coating 95 per cent
(i) Loss with Sodium IS: 2386 (Part – 5) 12 percent Maximum
(ii) Loss with Magnesium 18 per cent Maximum
6 Water absorption IS: 2386(Part - 3) 2 per cent Maximum
* Aggregates may satisfy requirements for either ofthe twotests.
** To determine this combined proportion, the flaky stone from representative sample should
first be separated out. Flakiness index is weight of flaky stone metal divided by weight of stone
sample. Only the elongated particle be separated out from the remaining (non flaky) stone metal.
Elongation index is weight of elongated particles divided by total non flaky particles. The value of
flakiness index and elongation index so found are added up.
Proportioning of materials:
The bitumen content for premixing shall be 1.99 % (percent) byweight of the total mix except when
otherwise directed by the Engineer.
The maximum compacted thickness of a layer shall be 50mm.
The quantities of aggregates to be used shall be sufficient to yield the specified thickness after
AGGREGATE GRADING FOR BITUMINOUS GROUT
IS Sieve Percent by weight passing the sieve
Variation in proportioning of materials :The Contractor shall have the responsibility for ensuring
proper proportioning of materials and producing a uniform mix. A variation in binder content +0.3
Ahmedabad Urban Development Authority (A.U.D.A.)
per cent by weight of total mix shall however be permissible for individual specimens taken for
quality control tests vide Section
Material consumption for 10 smtof the work is as under.
Material for 10 smt and0.66 cmt
1) Metal 25 to 40 mm (75%)
2) Kapchi 12 to 20 mm (15%)
3) Grit 6 to 10 mm (10%)
Construction Operations:
Weather and seasonal limitations : The work of laying shall not be taken up during rainy or foggy
weather or when the base course is damp or wet, or during dust storm or when atmospheric
temperature in shade is 10 degree C or less.
Preparation of base : This work shall consist of preparing an existing granular or black topped
surface bituminous course. The work shall be performed on such widths and lengths as shown in
application drawing or as directed by the Engineer. The existing surface shall be firm and clean and
treated with prime or tack coat as shown on the drawings as otherwise stated in the contract.
For scarifying and re-laying the granular surface: The materials used shall be coarse aggregates
salvaged from scarification of the existing granular base course supplemented by fresh coarse
aggregates and screenings so that aggregates and screening thus supplemented correspond to
Clause 404. Water Bound Macadam or Clause 406. Wet Mix Macadam, as the case may be.
For patching potholes and sealing cracks : Where the existing surface to be overlaid is bituminous,
any existing potholes and cracks shall be repaired and sealed in accordance with Clauses 3004.2 and
3004.3 or as directed by the Engineer.
For Profile Corrective Course : A profile corrective course for correcting the existing pavement
profile shall be laid to varying thickness as shown on the Drawings, or as indicated in the Contract
Documents. The profile corrective course shall be laid to tolerances and densities as specified for
wearing course if a single layer, or base course, if it is to be covered with a wearing course layer.
Profile corrective course and its application: The type of material for use as a profile corrective
course shall be as shown on the drawing. If it is to be laid as part of the overlay/strengthening
course, the profile corrective course material shall be of the same specification as that of the
overlay/strengthening course. However, if provided as a separate layer, it may be of the same
specification as the layer over which it is to be laid or intermediate between underlying layers, as
shown on the Drawing.
Surface Levels:
The levels of the sub grade and different pavement courses as constructed shall not vary from those
calculated with reference to the longitudinal and cross-profile of the road shown on the drawings or
as directed by the engineer beyond the tolerances mentioned in Table 900-1.
Bituminous material shall not be applied to a wet surface or during a dust storm or when the
weather is foggy, rainy or windy or when the temperature in the shade is less than 10DC. Where the
tack coat consists of emulsion the surface shall be slightly damp, but not wet. Where the tack coat is
of cut back bitumen the surface shall be dry.
Construction Equipment:
Ahmedabad Urban Development Authority (A.U.D.A.)
The tack coat distributor shall be self propelled or towed bitumen pressure sprayer, quipped for
spraying the material uniformly at a specified rate. Hand spraying of small areas inaccessible to the
distributor or in narrow strips shall be sprayed with a pressure and sprayer or as directed by the
Engineer 503.4.2 of MORTH specification. Preparation of base : The surface on which the tack coat is
to be applied shall be clean and free from dust, dirt and any extraneous material, and be otherwise
prepared in accordance with the requirements of Clauses 501.8 and 902 as appropriate. Immediately
before the application of the tack coat, the surface shall be swept clean with a mechanical broom,
and high pressure air jet, or by other means as directed by the Engineer.
Application of tack coat:
The application of tack coat shall be at the rate specified in the Contract, and shall be applied
uniformly. If rate of application of Tack Coat is not specified in the contract then it shall be at the
rate specified in TABLE 500-2 of MORTH specification. The normal range of spraying.
TABLE 500-2 RATE OF APPLICATION OF TACK COAT:
The emulsion asphalt at the rate of 2.5 kg per 10 sq.m. shall be used for tack coat temperature for a
bituminous emulsion shall be 20°C to 70°C and for a cut back 50°C to 80°C if RC-70/MC-70 IS used.
Where geosynthetic IS proposed for use, the provisions of Clauses 703.3.2, and 703.4.4 of MORTH
specification shall apply. The method of application of the tack coat will depend on the type of
equipment to be used, size of nozzles, pressure at the spray ban and speed of forward movement.
The Contractor shall demonstrate at a spraying trial, that the equipment and method to be used is
capable of producing a uniform spray, within the tolerances specified.
Where the material to receive an overlay is a freshly laid bituminous layer, that has not been
subjected to traffic, or contaminated by dust, a tack coat is not mandatory where the overlay is
completed within two days.
Curing of tack coat: The tack coat shall be left to cure until all the volatiles have evaporated before
any subsequent construction is started. No pant or vehicles shall be allowed on the tack coat other
than those essential for the construction.
Quality Control of Work :
TOLERANCES IN SURFACE LEVELS
1. Sub grade + 20mm
2. Sub-base 4 - 10 mm
(a) Flexible pavement - 20mm
(b) Concrete pavement + 6mm
[Dry clean concrete or Rolled concrete] - 10mm
3. Base - course for flexible pavement + 6mm
(a) Bituminous course - 6mm
(b) Other than bituminous + 10mm
(i) Machine laid - 10mm
(ii) Manually laid + 15mm
4. Wearing course for flexible pavement
Ahmedabad Urban Development Authority (A.U.D.A.)
(a) Machine laid + 6mm
(b) Manually laid + 10mm
5. Cement concrete pavement + 5mm
This work shall consist of the application of a single coat of high viscosity liquid bituminous material
to an existing bituminous road surface preparatory to the superimposition of a bituminous mix,
when specified in the Contract or instructed by the Engineer.
The binder used for tack coat shall be bitumen emulsion complying with IS:8887 (rapid setting) of a
type and grade as specified in the Section 500 of MORTH specification Contract or as directed by the
Engineer. The use of cut back bitumen as per IS:217 shall be restricted only for sites at sub-zero
temperatures or for emergency applications as directed by the Engineer.
Weather and Seasonal Limitations:
For control of the quality of materials supplied and the works carried out for relevant provisions of
Section 900 shall apply.
Specification: The rate shall cover the provision of tack coat at 0.25 kg per square meter with
provision that the variation in actual quantity of bitumen used will be assessed and the payment
adjusted accordingly.
Preparation and transport of mix:
Bituminous grout mix shall be prepared in a batch mix plant of adequate capacity and capable of
yielding a mix of proper and uniform quality with thoroughly coated aggregates.
The plant shall be batch mix type. The plant shall have coordinated set of essential units capable of
producing uniform mix within the job mix formula such as laid down in Appendix 'A'.
(a) In case of batch mix plant, the cold feed system shall have variable speed conveyors/ or other
suitable devices for regulating the accurate proportion of aggregate in to an even flood flow
automatically from a control operation/Control Cabin.
(b) Bitumen Control Unit: Capable of measuring/metering and spraying required quantity of
bitumen at specified temperature with automatic synchronization of bitumen and aggregate feed.
(c) Filler System : A fines feeder system suitable to receive bagged or bulk supply of filler materials
and its incorporation to the mix in the correct quantity shall be necessary audiliary.
(d) Dust Control : A suitable built in Dust Control Equipment for the dryer to contain the exhaust of
fine dust in the atmosphere for environmental control wherever so specified by the Engineer.
(e) Suitable auxiliary Bitumen Boiler of Adequate capacity with self heating arrangement and
temperature control device. The boiler should be fitted with temperature indicating instruments.
The temperature of binder at the time of mixing shall be in range of 150 Degree C to 163 degree and
that of the aggregate in the range of 155 degree C - 163 degree C provided that the difference in
temperature between the binder and aggregate at no time exceeds 14 Degree C.
Ahmedabad Urban Development Authority (A.U.D.A.)
Mixing shall be thorough to ensure that a homogeneous mixture is obtained in which all particles of
the aggregates are coated uniformly and the discharge temperature of mix shall be between
Degree C to 160 degree C.
The mixture shall be transported from the mixing place to the point of use in suitable tipper vehicles.
The vehicles employed for transport shall be clean and be covered in transit if so directed by the
Engineer. Any tipper causing excessive segregation of materials by its spring suspension or other
contributing factors or that which shows undue delay shall be removed from the work unit such
conditions are corrected.
Spreading: The mix transferred from the tipper at site to the paver shall be spread immediately by
means of self-propelled mechanical paver with suitable screeds capable of spreading, tamping and
finishing the mix true to the specified lines, grades and cross sections. The paver finisher shall have
the following essential features:
(a) Loading hoppers and suitable distributing mechanism.
(b) All drives having hydrostatic drive/control.
(c) The machine shall have a hydraulically extendable screed the appropriate width
(d) The screed shall have tamping and vibrating arrangement for initial compaction to the layer
as it is spread without rutting of otherwise marring the surface. It shall have adjustable amplitude
and variable frequency.
(e) The paver shall be equipment with necessary control mechanism so as to ensure that the
finished surface is free from surface blemishes.
(f) The paver shall be fitted with an electronic sensing device for automatic leveling and profile
control within the specified tolerances.
(g) The screed shall have the internal heating arrangement.
(h) The paver shall be capable of laying either 2.5 to 4.0 m width or 4.0 to 7.0 m width as
stipulated in the Contract.
(i) The paver shall be so designed as to eliminate skidding/slippage of the tyres during
However, in restricted locations and in narrow widths where the available plant cannot be operated
in the opinion of the Engineer, he may permit manual laying of the mix.
The temperature of the mix at the time of laying shall be in the range of 120°C to 160°C. In multi-
layer construction, the longitudinal joint in one layer shall offset that in the layer below by about
mm. However, the joint in the top-most layer shall be at the lane line of the pavement.
Longitudinal joints and edges shall be constructed true to the delineating line parallel to the centre
line of the road. All joints shall be cut vertical to the full thickness of the previously laid mix and the
surface painted with hot bitumen before placing fresh material. Longitudinal and transverse joints
shall be offset by at least 250 mm from those in the lower courses and the joint on the top-most
layer shall not be allowed to fall within the wheel path. All transverse joints shall be cut vertically to
the full thickness of the previously laid mix with asphalt cutter/pavement breaker and surface
painted with hot bitumen before placing fresh material. Longitudinal joints shall be preferably hot
joints. Cold longitudinal joints shall be properly heated with joint heater to attain a suitable
temperature of about 80C before laying of adjacent material.
Compaction: After the spreading of mix, rolling shall be done by 80 to 100 kN vibratory roller. Rolling
shall start as soon as possible after the material has been spread deploying a set of rollers as the
rolling is to be completed in limited time frame. The roller shall move at a speed not more than
km/h. Rolling shall be done with care to avoid unduly roughening of the pavement surface.
Ahmedabad Urban Development Authority (A.U.D.A.)
Rolling of the longitudinal joints shall be done immediately behind the paving operation. After this,
the rolling shall commence at the edges and progress towards the centre longitudinally except that
on super relevated and uni-directional cambered portions, it shall progress from the lower to the
upper edge parallel to the centre line of the pavement.
The initial or break-down rolling shall be done with 80-100 kN static weight smooth wheel roller (3
wheels or tandem) as soon as it is possible to roll the mix without cracking the surface or having the
mix pick up on the roller wheels. The second or intermediate rolling shall follow the break-down
rolling with vibratory roller of 80 to 100 kN static weight or pneumatic tyred roller of 150 to 250 kN
weight, with minimum 7 wheels and minimum tyre pressure of 0.7 MPa as closely as possible to the
paver and be done while the paving mix is still at a temperature that will result in maximum density.
The final rolling shall be done while material is still workable enough for removal of roller marks with
60 - 80 kN tandem roller. During the final rolling, vibratory system shall be switched off. The joints
and edges shall be rolled with a 80 to 100 kN static roller.
When the roller has passed over the whole area once, any high spots or depressions which become
apparent shall be corrected by removing or adding mix material. The rolling shall then be continued
till the entire surface has been rolled to 95 per cent of the average laboratory density (obtained from
Marshall specimens compacted as defined in Table 500-10), there is no crushing of aggregates and
all roller marks have been eliminated. Each pass of the roller shall uniformly overlap not less than
one-third of the track made in the preceding pass. The roller wheel shall be kept damp if necessary
to avoid bituminous material from sticking to the wheels and being picked up. In no case shall fuel,
lubricating oil shall be used for this purpose, nor excessive water poured on the wheels.
Rolling operations shall be completed in every respect before the temperature of the mix falls below
Roller(s) shall not stand on newly laid material while there is a risk that surface will be deformed
thereby. The edges along and transverse of the bituminous grout laid and compacted earlier shall be
cut to their full depth so as to expose fresh surface which shall be painted with a thin surface coat of
approximate binder before the new mix is placed against it.
Surface Finish and Quality Control of Work :
The surface finish of construction shall conform to the requirements of Clause 902. Control on the
quality of materials and works shall be exercised by the Engineer in accordance with Section
The built-up spray grout shall be provided with next surfacing without any delay. If there is to be any
delay, the course shall be covered by a seal coat to the requirement of Clause 513 before allowing
any traffic over it. The seal coat in such cases shall be considered incidental to the work and shall not
be paid for separately.
Arrangement for Traffic:
During the period of construction, arrangement of traffic shall be done to Clause 112 of MORTH
Passage of Traffic along a part of the Existing Carriageway under Improvement:
For widening/strengthening existing carriageway where part width of the existing carriageway is
proposed to be used for passage of traffic, treated shoulders shall be provided on the side on which
work is not in progress. The treatment to the shoulder shall consist of providing at least 150 mm
thick granular base course covered with bituminous surface dressing in a width of at least 1.5 m and
the surface shall be maintained throughout the period during which traffic uses the same to the
satisfaction of the Engineer. The continuous length in which such work shall be carried out, would be
limited normally to 500 m at a place. However, where work is allowed by the Engineer in longer
Ahmedabad Urban Development Authority (A.U.D.A.)
stretches passing places at least 20 m long with additional paved width of 2.5 m shall be provided at
every 0.5 km interval.
In case of widening existing two-lane to four-lane the additional two lanes would be constructed first
and the traffic diverted to it and only thereafter the required treatment to the existing carriageway
would be carried out. However, in case where on the request of the Contractor work on existing two
lane carriageway is allowed by the Engineer with traffic using part of the existing carriageway,
stipulations as in para above shall apply.
After obtaining permission of the Engineer, the treated shoulder shall be dismantled the debris
disposed of and the area cleared as per the direction of the Engineer.
MEASUREMENTS FOR PAYMENT:
The payment shall be made on the tonnage basis of the weight of mix of aggregates and bitumen.
For this purpose, the contractor shall have to install a weight bridge of suitable capacity for the
purpose of weighment of dumpers at suitable place at his cost as directed. Weight of empty and
weight of loaded dumper will be recorded in bound and numbered register on plant site.
Department will be free to get some loaded dumpers test checked at other weight bridge. Weigh
bridge will be periodically got calibrated and verified from weight and measure authorities.
For the purpose of application of tack coat, if the theoretical area as per sanctioned estimate for
basis of tonne differs with the actual area of work done in the field, the reduction in or addition to
payment shall have to be exceed respectively.
Weight of mix materials will be done in presence of responsible person, not less than the rank: of
supervisor of department and the measurement shall be recorded by the Deputy Engineer or
Assistant Engineer or Addl. Asst. Engineer. If so authorized, Record of each dumper will be
maintained separately in bound and numbered register, which will be maintained by the
departmental representative and signed by the contractor. Proper gate pass system shall be
established for the vehicles coming to the plant site and out going from the plant site. The location
of the kilometer, hectometer and meter in which individual dumper are unloaded shall be recorded
RATE: The contract unit rate for the work shall be payment in full for carrying out the required
operations including full compensation for
(i) Making arrangements for traffic to Clause 112 of MORTH specification except or initial
treatment to verge, shoulders and construction of diversion.
(ii) Preparation of base except for laying of profile corrective course but including filling of
(iii) Providing all materials to be incorporated in the work including arrangement for stock yards,
all royalties, fees, rents where necessary and all leads and lift.
(iv) All labour, tools, equipment, plant including installation of batch mix plant, power supply
units and all machineries, incidental to complete the work to the specifications.
(v) Carrying out the work in part widths of the road where directed.
(vi) Carrying out all tests for control of quality.
Providing and laying 50 mm thick compacted Bituminous Macadam with Specified graded black
trap crushed stone aggregates as per MORTH gradation using rapid Curing emulsion for teak coat
@ 2.5 Kg /10 Sqm with mechanical sprayer and VG 30(60/70) Bulk bitumen for mixing at the rate
3.4 % ( 34 KG / M.T) by weight of the total mix including heating and mixing the bitumen and
aggregate by batch mix plant and spreading same by censor paver finisher to the required camber
Ahmedabad Urban Development Authority (A.U.D.A.)
and grade, and rolling with vibratory roller to achieve desire density including cost of fire wood,
oil, kerosene, flushing of stone dust as required, labour charges and hire charges of machineries
The work shall consist of construction, in a single course, of compacted crushed aggregates
premixed with a bituminous binder, to serve as base/binder course, laid immediately after
mixing, on a base prepared previously in accordance with the requirement of these
Specifications and in conformity with the lines, grades and cross-sections shown on the
drawing or as directed by the Engineer.
504.2. Materials
504.2.1. Bitumen: The bitumen shall be paving bitumen of suitable viscosity grade VG-40(30/40) as
per IS: 73. The actual grade of bitumen to be used shall be decided by the Engineer appropriate to
the region, traffic, rainfall and other environmental conditions. Guidelines on selection of the grade
of bitumen are given in Appendix -
Viscosity Grade (VG) Bitumen Specification as per IS 73 :
Characteristics VG - 10 VG-20 VG-40 VG-40
Absolute Viscosity 60C, poises, min 800 1600 2400
Kinematic Viscosity 135C CSI, min 250 300 350
Flash point, C, min 220 220 220
Solubility in trichloroethylene, % min 99.0 99.0 99.0
Penetration at 25C 80-100 60-80 50-70 40-60
Softening point, C min 40 45 47
Test on residue from thin film oven test / RTFOT :
(A) Viscosity ration at 60C, max 4.0 4.0 4.0
(B) Ductility at 25C, cm, min after thin film over test 75 50 40
504.2.2. Aggregates
504.2.2.1. The aggregates shall consist of crushed stone, crushed gravel/single or other stones.
They shall be clean, strong, durable of fairly cubical shape and free from disintegrated pieces,
organic or other deleterious matter and adherent coating. If crushed shingle/gravel is used, not less
than 90 percent by weight of the gravel/shingle pieces retained on 4.75 mm sieve shall have at least
two fractured faces. The aggregates shall preferably be hydrophobic and of low porosity. If
hydrophilic aggregates are to be used, the bitumen shall preferably be treated with anti-stripping
agents of approved quality in suitable dose as per Appendix-5.The aggregates shall satisfy the
physical requirements set forth in Table 500-3.
PHYSICAL REQUIREMENTS OF AGGREGATES FOR
BITUMINOUS MACADAM
S. No. Test Test Method Requirement
1 Los Angeles Abrasion Value IS:2386 (Part - 4) 40 percent
Ahmedabad Urban Development Authority (A.U.D.A.)
2 Aggregate Impact Value* -do- 30 percent
3 Flakiness and Elongation IS: 2386 (Part - 1) 30 percent
Indices (Total)
4 Coating and Stripping of AASHTO T 182 Minimum retained
Bitumen Aggregate Mixtures coating 95 per cent
5 Soundness: IS: 2386 (Part - 5)
(i) Loss with Sodium
Sulphate 5 cycles 12 percent Maximum
(ii) Loss with Magnesium
Sulphate 5 cycles 18 per cent Maximum
6 Water absorption IS: 2386(Part - 3) 2 per cent
*Aggregates may satisfy requirements for either ofthe twotests.
Note : If crushed slag is used, Clause 404.2.3 shall apply.
504.2.2. The aggregate for bituminous macadam shall conform to one of the two grading in
Table 500-4, depending on the compacted thickness; the actual grading shall be as specified in the
504.2.3. Proportioning of materials: The bitumen content for premixing shall be 3.4 percent
byweight of the total mix except when otherwise directed by the Engineer.
COMPOSITION OF BITUMINOUS MACADAM
Mix designation Grading 1 Grading
Nominal aggregate size 40 mm 19 mm
layer thickness
IS Sieve (mm) Cumulative % by weight of total aggregate
Bitumen content, % by 3.1 – 3.4 3.40%
Ahmedabad Urban Development Authority (A.U.D.A.)
Bitumen grade 35 to 90 VG-40 (40/60)
Notes: 1. Appropriate bitumen contents for conditions in cooler areas of India may be up to
0.5% higher subject to the approval of the Engineer.
The maximum compacted thickness of a layer shall be 50 mm.
The quantities of aggregates to be used shall be sufficient to yield the specified thickness after
504.2.4. Variation in proportioning of material: The Contractor shall have the responsibility
for ensuring proper proportioning of materials and producing a uniform mix. A variation in binder
content ± 0.3 per cent by weight of total mix shall, however, be permissible for individual specimens
taken for quality control tests vide Section
504.3. Construction Operations
504.3.1. Weather and seasonal limitations: The work of laying shall not be taken up during
rainy or foggy weather or when the base course is damp or wet, or during dust storm or when the
atmospheric temperature in shade is 100C or less.
504.3.2. Preparation and transport of mix: Bituminous macadam mix shall be prepared in a
batch mix plant of adequate capacity and capable of yielding a mix of proper and uniform quality
with thoroughly coated aggregates.
Batch mix plant shall be of suitable capacity preferably of batch mix type. Total system for crushing
of stone aggregates and feeding of aggregate fractions in required proportions to achieve the
desired mix, deployed by the Contractor must be capable of meeting the overall Specification
requirements under stringent quality control. The plant shall have the following essential features:
(a) The plant shall have coordinated set of essential units capable of producing uniform mix as
per the job mix formula.
(b) Cold aggregate feed system with minimum 4 bins having belt conveyor arrangement for
initial proportioning of aggregates from each bin in the required quantities.
In order to have free flow of fines from the bin, it is advisable to have vibrator fitted on bin to
intermittently shake it.
(c) Belt conveyers below each bin should have variable speed drive motors. Mere should be
electronic load sensor on the main conveyer for measuring the flow of aggregates.
(d) Dryer unit with burner capable of heating the aggregate to the required temperature
without any visible unburnt fuel or carbon residue on the aggregate and reducing the moisture
content of the aggregate to the specified minimum.
(e) The plant shall be fitted with suitable type of thermometric instruments at appropriate
places so as to indicate or record/register the temperature of heated aggregate, bitumen and mix.
(f) Bitumen supply unit capable of heating, measuring/metering and spraying of bitumen at
specified temperature with automatic synchronisation of bitumen and aggregate feed in the
required proportion.
(g) A filler system suitable to receive bagged or bulk supply of filler material and its
incorporation to the mix in the correct quantity wherever required.
Ahmedabad Urban Development Authority (A.U.D.A.)
(h) A suitable built-in dust control system for the dryer to contain/recycle permissible fines into
the mix. It should be capable of preventing the exhaust of fine dust into atmosphere for
environmental control wherever so specified by the Engineer.
(i) The plant should have centralised control panel/cabin capable of presetting, controlling /
synchronizing all operations starting from feeding of cold aggregates to the discharge of the batch
mix to ensure proper quality of mix. It should have indicators for any malfunctioning in the
Every batch mix plant should be equipped with siren or horn so that the operator may use the same
before starting the plant every time in the interest of safety of staff.
B - For Batch Type Plant
(i) Gradation control unit having minimum four deck vibratory screens for accurate sizing of hot
aggregate and storing them in separate bins. This unit should be fully covered to reduce the
maintenance cost and for better environmental condition.
(ii) Proper arrangement for accurate weighing of each size of hot aggregate from the control
panel before mixing.
(iii) Paddle mixer unit shall be capable of producing a homogeneous mix with uniform coating of
all particles of the mineral aggregate with binder.
C - For Continuous Type Plant
(i) Gradation control unit having vibratory screens for accurate sizing of hot aggregate and
storing them in separate bins. This unit should be fully covered to reduce the maintenance cost and
for better environmental condition.
(ii) There should be appropriate arrangement for regulating and volumetric control of the flow
of hot aggregate, from each bin to achieve the required proportioning.
(iii) Paddle mixer unit shall be capable of producing a homogeneous mix with uniform coating of
all particles of the mineral aggregate with binder.
D - For Batch Mix Plant
(i) It is a prerequisite that only property screened and graded materials are fed to the bins. If
required, a vibratory screening unit shall be installed at the plant site to ensure the same.
A primary 4-deck vibratory screening unit shall be installed before the multiple bin cold feed system
for screening the aggregates and grading the same.
(ii) Belt conveyers below each bin should have variable speed drive motors. There should be
electronic load sensor on the main conveyer for measuring the flow of aggregate.
(iii) There should be arrangement to measure moisture content of the aggregate(s) so that
moisture correction may be applied for working out requirements of binder and filler.
The temperature of binder at the time of mixing shall be in the range of 150 0C -to 1630 C and that of
the aggregate in the range of 1550C - 1630C. provided that the difference in temperature between
the binder and aggregate at no time exceeds 140C.
Mixing shall be thorough to ensure that a homogeneous mixture is obtained in which all particles of
the aggregates are coated uniformly, and the discharge temperature of mix shall be between 130 0C
The mixture shall be transported from the mixing plant to the point of use in suitable tipper vehicles.
The vehicles employed for transport shall be clean and be covered in transit if so directed by the
Engineer. Any tipper causing excessive segregation of materials by its spring suspension or other
contributing factors or that which shows undue delay shall be removed from the work until such
conditions are corrected.
Ahmedabad Urban Development Authority (A.U.D.A.)
This work shall consist of preparing an existing granular or black-topped surface bituminous course.
The work shall be performed on such widths and lengths as shown on the drawings or as instructed
by the Engineer. The existing surface shall be firm and clean, and treated with prime or Tack coat as
shown on the drawings as otherwise stated in the contract.
For scarifying and re-laying the granular surface : The materials used shall be coarse aggregates
salvaged from scarification of the existing granular base course supplemented by fresh coarse
aggregates and screenings so that aggregates and screening thus supplemented correspond to
For patching potholes and sealing cracks : Where the existing surface to be overlaid is bituminous,
any existing potholes and cracks shall be repaired and sealed in accordance with Clauses 3004.2 and
3004.3 or as directed by the Engineer.
For Profile Corrective Course : A profile corrective course for correcting the existing pavement
profile shall be laid to varying thickness as shown on the Drawings, or as indicated in the Contract
Documents. The profile corrective course shall be laid to tolerances and densities as specified for
wearing course if a single layer, or base course, if it is to be covered with a wearing course layer.
Profile corrective course and its application :The type of material for use as a profile corrective
course shall be as shown on the drawing or as directed by the Engineer. Where it is to be laid as part
of the overlay/strengthening course, the profile corrective course material shall be of the same
specification as that of the overlay/strengthening course. However, if provided as a separate layer,
it may be of the same specification and details given in the contract drawings.
Surface Levels :
The levels of the sub grade and different pavement courses as constructed shall not vary from those
calculated with reference to the longitudinal and cross-profile of the road shown on the drawings or
as directed by the engineer beyond the tolerances mentioned in Table 900-1.
TOLERANCES IN SURFACE LEVELS
1. Sub grade + 20 mm
2. Sub-base + 10 mm
(a) Flexible pavement - 20 mm
(b) Concrete pavement + 6 mm
[Dry clean concrete or Rolled concrete] - 10 mm
3. Base - course for flexible pavement + 6 mm
(a) Bituminous course - 6 mm
(b) Other than bituminous + 10 mm
(i) Machine laid - 10 mm
(ii) Manually laid + 15 mm
4. Wearing course for flexible pavement
(a) Machine laid + 6 mm
(b) Manually laid + 10 mm
Ahmedabad Urban Development Authority (A.U.D.A.)
5. Cement concrete pavement + 5 mm
This work shall consist of the application of a single coat of low velocity liquid bituminous material to
an existing bituminous road surface preparatory to the superimposition of a bituminous mix, when
specified in the Contract or instructed by the Engineer.
The binder used for tack coat at the rate of 2.5 kg/10 sq.m. shall be bitumen emulsion complying
with IS:8887 of a type and grade as specified in the Section
Contract or as directed by the Engineer. The use of cut back bitumen as per IS:217 shall be restricted
only for sites at sub-zero temperatures or for emergency applications as directed by the Engineer.
Weather and Seasonal Limitations :
Bituminous material shall not be applied to a wet surface or during a dust storm or when the
weather is foggy, rainy or windy or when the temperature in the shade is less than 10oC. Where the
tack coat consists of emulsion, the surface shall be slightly damp, but not wet. Where the tack coat
is of cut back bitumen, the surface shall be dry.
CONSTRUCTION :
Equipment : The tack coat distributor shall be self propelled or towed bitumen pressure sprayer,
equipped for spraying the material uniformly at a specified rate, Hand spraying of small areas,
inaccessible to the distributor, or in narrow strips, shall be sprayed with a pressure hand sprayer, or
as directed by the Engineer.
Preparation of base : The surface on which the tack coat is to be applied shall be clean and free from
dust, dirt, and any extraneous material, and be otherwise prepared in accordance with the
requirements of Clauses 501 and 902 as appropriate. Immediately before the application of the tack
coat, the surface shall be swept clean with a mechanical broom, and high pressure air jet, or by
other means as directed by the Engineer.
Application of tack coat : The application of tack coat shall be at the rate of 2.5 kg/10 sq.m.and shall
be applied uniformly.
RATE OF APPLICATION OF TACK COAT :
The emulsion asphalt IS 8887 at the rate of 2.5 kg per 10 sq.m. shall be used for tack coat
temperature for a bituminous emulsion shall be 20oC to 70oC and for a cutback, 50oC to 80oC IF RC-
70/MC-70 IS used. Where geosynthetic IS proposed for use, the provisions of Clauses 703.3.2, and
703.4.4 shall apply. The method of application of the tack coat will depend on the type of equipment
to be used, size of nozzles, pressure at the spray bar, and speed of forward movement. The
Contractor shall demonstrate at a spraying trial, that the equipment and method to be used is
capable of producing a uniform spray, within the tolerances specified.
Where the material to receive an overlay is a freshly laid bituminous layer, that has not been
subjected to traffic, or contaminated by dust, a tack coat is not mandatory where the overlay is
completed within two days.
Curing of tack coat : The tack coat shall be left to cure until all the volatiles have evaporated
before any subsequent construction is started. No plant or vehicles shall be allowed on the tack coat
other than those essential for the construction.
Quality Control Work :
Ahmedabad Urban Development Authority (A.U.D.A.)
For control of the quality of materials supplied and the works carried out the relevant provisions of
Section 900 shall apply.
Specifications :The rate shall cover the provision of tack coat at 0.25 kg per square meter
with the provision that the variation in actual quantity of bitumen used will be assessed and the
payment adjusted accordingly.
Preparation and transport of mix :
Bituminous macadam shall be prepared in a batch mix plant of adequate capacity and capable of
yielding a mix of proper and uniform quality with thoroughly coated aggregates.
The plant shall be batch mix type. The plant shall have coordinated set of essential units capable of
producing uniform mix within the job mix formula such as laid down in Appendix 'A'.
(a) In case of batch mix plant, the cold feed system shall have variable speed conveyors/ or
other suitable devices for regulating the accurate proportion of aggregate in to an even flood flow
automatically from a control operation/Control Cabin.
(b) Bitumen Control Unit :
Capable of measuring/metering and spraying required quantity of bitumen at specified temperature
with automatic synchronization of bitumen and aggregate feed.
(c) Filler System :A fines feeder system suitable to receive bagged or bulk supply of filler
materials and its incorporation to the mix in the correct quantity shall be necessary audiliary.
(d) Dust Control :A suitable built in Dust Control Equipment for the dryer to contain the exhaust
of fine dust in the atmosphere for environmental control wherever so specified by the Engineer.
(e) Suitable auxiliary Bitumen Boiler of Adequate capacity with self heating arrangement and
temperature control device. The boiler should be fitted with temperature indicating instruments.
The temperature of binder at the time of mixing shall be in range of 150 Degree C to 163 degree and
that of the aggregate in the range of 155 degree C - 163 degree C provided that the difference in
temperature between the binder and aggregate at no time exceeds 14 Degree C. Rate of asphalt of
VG-40(30/40)grade in mixing is 3.40% per 1 MT of total mix i.e. 34 kg per 1 MT of total mix.
Mixing shall be thorough to ensure that a homogeneous mixture is obtained in which all particles of
the aggregates are coated uniformly and the discharge temperature of mix shall be between
Degree C to 160 degree C.
The mixture shall be transported from the mixing place to the point of use in suitable tipper vehicles.
The vehicles employed for transport shall be clean and be covered in transit if so directed by the
Engineer. Any tipper causing excessive segregation of materials by its spring suspension or other
contributing factors or that which shows undue delay shall be removed from the work unit such
conditions are corrected.
Spreading :The mix transferred from the tipper at site to the paver shall be spread
immediately by means of self-propelled mechanical paver with suitable screeds capable of
spreading, tamping and finishing the mix true to the specified lines, grades and cross sections. The
paver finisher shall have the following essential features :
(a) Loading hoppers and suitable distributing mechanism.
(b) All drives having hydrostatic drive/control.
(c) The machine shall have a hydraulically extendable screed the appropriate width
(d) The screed shall have tamping and vibrating arrangement for initial compaction to the layer
as it is spread without rutting of otherwise marring the surface. It shall have adjustable amplitude
and variable frequency.
Ahmedabad Urban Development Authority (A.U.D.A.)
(e) The paver shall be equiped with necessary control mechanism so as to ensure that the
finished surface is free from surface blemishes.
(f) The paver shall be fitted with an electronic sensing device for automatic levelling and profile
control within the specified tolerances.
(g) The screed shall have the internal heating arrangement.
(h) The paver shall be capable of laying either 2.5 to 4.0 m width or 4.0 to 7.0 m width as
stipulated in the Contract.
(i) The paver shall be so designed as to eliminate skidding/slippage of the tyres during
However, in restricted locations and in narrow widths where the available plant cannot be
operated in the opinion of the Engineer, he may permit manual laying of the mix.
The temperature of the mix at the time of laying shall be in the range of 123 degree C to
degree C. In multi-layer construction, the longitudinal joint in one layer shall offset that in the layer
below by about 150 mm. However, the joint in the top-most layer shall be at the lane line of the
Longitudinal joints and edges shall be constructed true to the delineating line parallel to the
centre line of the road. All joints shall be cut vertical to the full thickness of the previously laid mix
and the surface painted with hot bitumen before placing fresh material. Longitudinal and transverse
joints shall be offset by at least 250 mm from those in the lower courses and the joint on the top-
most layer shall not be allowed to fall within the wheel path. All transverse joints shall be cut
vertically to the full thickness of the previously laid mix with asphalt cutter/pavement breaker and
surface painted with hot bitumen before placing fresh material. Longitudinal joints shall be
preferably hot joints. Cold longitudinal joints shall be properly heated with joint heater to attain a
suitable temperature of about 80oC before laying of adjacent material.
Compaction :After the spreading of mix, rolling shall be done by 80 to 100 kN vibratory
roller. Rolling shall start as soon as possible after the material has been spread deploying a set of
rollers as the rolling is to be completed in limited time frame. The roller shall move at a speed not
more than 5 km/h. Rolling shall be done with care to avoid unduly roughening of the pavement
Rolling of the longitudinal joints shall be done immediately behind the paving operation.
After this, the rolling shall commence at the edges and progress towards the centre longitudinally
except that on super elevated and uni-directional cambered portions, it shall progress from the
lower to the upper edge parallel to the centre line of the pavement.
The initial or break-down rolling shall be done with 80-100 kN static weight smooth wheel
roller (3 wheels or tandem) as soon as it is possible to roll the mix without cracking the surface or
having the mix pick up on the roller wheels. The second or intermediate rolling shall follow the
break-down rolling with vibratory roller of 80 to 100 kN static weight or pneumatic tyred roller of
150 to 250 kN weight, with minimum 7 wheels and minimum tyre pressure of 0.7 MPa as closely as
possible to the paver and be done while the paving mix is still at a temperature that will result in
maximum density. The final rolling shall be done while material is still workable enough for removal
of roller marks with 60 - 80 kN tandem roller. During the final rolling, vibratory system shall be
switched off. The joints and edges shall be rolled with a 80 to 100 kN static roller.
When the roller has passed over the whole area once, any high spots or depressions which become
apparent shall be corrected by removing or adding mix material. The rolling shall then be continued
till the entire surface has been rolled to 95 per cent of the average laboratory density (obtained from
Marshall specimens compacted as defined in Table 500-10), there is no crushing of aggregates and
Ahmedabad Urban Development Authority (A.U.D.A.)
all roller marks have been eliminated. Each pass of the roller shall uniformly overlap not less than
one-third of the track made in the preceding pass. The roller wheel shall be kept damp if necessary
to avoid bituminous material from sticking to the wheels and being picked up. In no case shall fuel,
lubricating oil be used for this purpose, nor excessive water poured on the wheels.
Rolling operations shall be completed in every respect before the temperature of the mix falls below
Roller(s) shall not stand on newly laid material while there is a risk that surface will be
deformed thereby. The edges along and transverse of the bituminous grout laid and compacted
earlier shall be cut to their full depth so as to expose fresh surface which shall be painted with a thin
surface coat of approximate binder before the new mix is placed against it.
Where longitudinal joints are made in pre-mixed bituminous materials, the materials shall be fully
compacted and the joint made flush in one of the following ways; only method (iii) shall be used for
transverse joints:
(i) by heating the joints with an approved joint heater when the adjacent width is being laid, but
without cutting back or coating with binder. The heater shall raise the temperature of the full depth
of material, to within the specify range of minimum rolling temperature and maximum temperature
at any stage for the material, for a width not less than 75 mm. The Contractor shall have equipments
available, for in the event of heater break down, to form joints by method.
(ii) by using two or more pavers operating in echelon, where this is practicable, and in sufficient
proximity for adjacent widths to be fully compacted by continuous rolling.
(iii) by cutting back the exposed joint for a distance equal to the specified layer thickness to a
vertical face, discarding all material and coating the vertical face completely with 60/70 viscosity
grade hot bitumen, or cold-applied bitumen or polymer modified adhesive bitumen tape with a
minimum thickness of 2 mm, before the adjacent width is laid.
All joints shall, be offset at least 300 mm from parallel joints in the layer beneath or as
directed, and in a layout approved by the Engineer. Joints in the wearing course shall coincide with
either the lane edge or the lane marking, which ever is appropriate. Longitudinal joints shall not be
situated in wheel track zones.
Surface Finish and Quality Control of Work :
The surface finish of construction shall conform to the requirements of Clause 902. Control
on the quality of materials and works shall be exercised by the Engineer in accordance with Section
The bituminous macadam shall be covered with either the next pavement course or wearing
course, as the case may be without any delay. If there is to be any delay, the course shall be covered
by a seal coat to the requirement of Clause 513 before allowing any traffic over it. The seal coat in
such cases shall be considered incidental to the work and shall not be paid for separately.
Arrangement for Traffic :
During the period of construction, arrangement of traffic shall be done to Clause
Passage of Traffic along a part of the Existing Carriageway under improvement :
For widening/strengthening existing carriageway where part width of the existing
carriageway is proposed to be used for passage of traffic, treated shoulders shall be provided on the
side on which work is not in progress. The treatment to the shoulder shall consist of providing at
least 150 mm thick granular base course covered with bituminous surface dressing in a width of at
least 1.5 m and the surface shall be maintained throughout the period during which traffic uses the
Ahmedabad Urban Development Authority (A.U.D.A.)
same to the satisfaction of the Engineer. The continuous length in which such work shall be carried
out, would be limited normally to 500 m at a place. However, where work is allowed by the Engineer
in longer stretches passing places at least 20 m long with additional paved width of 2.5 m shall be
provided at every 0.5 km interval.
In case of widening existing two-lane to four-lane the additional two lanes would be
constructed first and the traffic diverted to it and only thereafter the required treatment to the
existing carriageway would be carried out. However, in case where on the request of the Contractor
work on existing two lane carriageway is allowed by the Engineer with traffic using part of the
existing carriageway, stipulations as in para above shall apply.
After obtaining permission of the Engineer, the treated shoulder shall be dismantled the
debris disposed of and the area cleared as per the direction of the Engineer.
MEASUREMENTS FOR PAYMENT :
The payment shall be made on the tonnage basis of the weight of mix of aggregates and
bitumen. For this purpose, the contractor shall have to install a weight bridge of suitable capacity for
the purpose of weighment of dumpers at suitable place at his cost as directed. Weight of empty and
weight of loaded dumper will be recorded in bound and numbered register on plant site.
Department will be free to get some loaded dumpers test checked at other weight bridge. Weigh
bridge will be periodically got calibrated and verified from weight and measure authorities.
The contract unit rate for the work shall be payment in full for carrying out the required
operations including full compensation for:
(i) Making arrangements for traffic to Clause 112 except for initial treatment to verge,
shoulders and construction of diversions;
(ii) Preparation of base except for laying of profile corrective course but including filling of
(iii) Providing all materials to be incorporated in the work including arrangement for stockyards,
all royalties, fees, rents where necessary and all leads and lifts;
(iv) All labour, tools, equipment, plant including installation of batch mix plant, power supply
units and all machineries, incidental to complete the work to the Specifications;
(v) Carrying out the work in pan widths of the road where directed,
(vi) Carrying out all tests for control of quality and
(vii) The rate shall cover the provision of bitumen at 3.40 percent of weight of total mix, with the
provision that the variation of quantity of bitumen will be assessed and the payment adjusted as per
the rate of bitumen quoted.
Providing and laying 20 mm thick mix seal surfacing using specified graded crushed Black Trap
stone aggregates as per MORTH gradation using VG-40 bulk bitumen for mixing at the rate of
% (45 Kg./M.T.) by hot mix process and hot laid process using paver finisher to the required
camber and grade, including rolling with vibratory roller to achieve desire density including cost of
fire wood, oil, Kerosene, labour charges and hier charges of machinaries etc. complete.
1. DESCRIPTION :
The work shall consist of construction of premix seal course as wearing course on a previously
prepared base, to the requirements of these specifications.
Ahmedabad Urban Development Authority (A.U.D.A.)
The binder shall be straight run bitumen of VG-40 grade satisfying the requirement of IS : 73. The
actual grade of the binder to the used shall be decided by the Engineer-in-charge.
2.2 COARSE AGGREGATES :
The coarse aggregates shall consist of crushed stone. These shall be clean strong, durable of fairly
cubical shape, free of disintegrated pieces, organic of other deleterious matter and adherent
coatings. The aggregates shall preferably be hydrophobic and of low porosity and shall satisfy the
physical requirement set forth in Table given below :
PHYSICAL REQUIREMENT OF AGGREGATE FOR BITUMINOUS MACADAM
Sr.No. Test Test Method Requirements
1 Los Angles Abrasion Value* I.S. 2386 (Part – IV) 35 % Maximum
2 Aggregate Impact Value* ---do--- 30 % Maximum
3 Flakiness Index I.S. 2386 (Part – I) 30 % Maximum
4 Stripping Value I.S. 6241 25 % Maximum
5 Water Absorption I.S. 2386 (Part – III) 2 % Maximum
2.3 FINE AGGREGATE :
2.4 The fine aggregates shall consist of crusher run screenings, natural sand or a mixture of
both. These shall be clean, hard, durable, uncoated, dry and free from injurious, soft or flaky pieces
and organic or deleterious substances.
The filler, where required shall be an inert material the whole of which passes 600 micron sieve, at
least 90 percent passing 150 micron sieve and not less than 70 percent passing 75 micron sieve. The
filler shall be cement stone dust, hydrated lime, fly ash or other non-plastic mineral matter approved
by the Engineer-in-charge.
2.4 AGGREGATE GRADATION :
The mineral aggregates, including mineral filler, shall be so graded or combined as to confirm to the
gradation set forth in Tables below.
Table Aggregate Gradation for Pre-Mix Seal Coat
Sieve Designation Percent by weight passing to sieve
Ahmedabad Urban Development Authority (A.U.D.A.)
2.6 PROPORTIONING OF MATERIALS :
The binder content for premixing shall be 4.50 percent by weight of the total mix.
The contractor shall get the job-mix formula for the mix approved by the Engineer-in-charge before
starting the work.
2.7 VARIATION IN PROPORTIONING OF MATERIALS :
The contractor shall have the responsibility of ensuring proper proportioning in accordance with the
approved job-mix formula and producing a uniform mix. A variation in binder content upto +
percent by weight of total mix shall, however permissible in individual specimens taken for qualify
control tests vide. MOST Specification Section
3.0 CONSTRUCTION OPERATIONS :
3.1 WHETHER AND SEASONAL LIMITATION :
Semi dense carpet shall not be laid during rainy weather or when the base course is damp or wet.
3.2 PREPARATION OF BASE :
The base on which Semi dense is to be laid shall be prepared shaped and conditioned to the
specified lines, grades and cross section in accordance with MOST Specification Clause 501 or as
directed by the Engineer-in-charge. The surface shall be throughly swept and scraped clean and free
of dust and foreign matter
3.3 TACK COAT :
3.3.1 APPLICATION OF BINDER :
Binder shall be heated to the temperature appropriate to the grade of bitumen used and approved
by the Engineer-in-charge and sprayed on the base at the rate specified below. The rate of spread in
terms of straight-run bitumen shall be 5 Kg. per 10 Sq.m. area for an existing bitumen treated
surface and 10 Kg. for 10 Sq.m. area for an untreated water bound macadam surface. The binder
shall be applied uniformly with the aid of sprayers. The tack coat shall be applied just ahead of the
oncoming bituminous construction.
3.3 PREPARATION OF THE MIX :
Hot mix plant of adequate capacity and capable of producing a proper and uniform quality shall be
used for preparing the mix. The plant should be continuous type having a co-ordinated set of
essential units such as dryer for heating the aggregates, devices for feeding by weight of volume the
correct quantity of heated binder together with a paddle mixer of intimate mixing of the binder and
aggregates. For detail relating Hot Mix plant the Annexure – "A" may be referred.
Ahmedabad Urban Development Authority (A.U.D.A.)
The temperature of binder at the time of mixing shall be in the range of 150 - 177 C. and aggregates
in the range of 155 C. – 163 C. Provided also that at no time shall be the difference in temperature
between the aggregates and the binder exceed 14 C.
Mixing shall be through to ensure that a homogeneous mixture is obtained in which all the particles
of the mineral aggregates are coated uniformly.
The mix shall be transported from the mixing plant to the point of use in suitable vehicles. The
vehicles employed for transport shall be clean and be covered over the transit if so directed by the
Engineer-in-charge.
3.4 SPREADING :
The mix, transported from the hot mix plant to the site, shall be spread by means of a self propelled
mechanical paver with suitable screeds capable of spreading, temping and finishing the mix true to
specified grade, lines and cross section. The temperature of mix at the time of laying shall be in the
range 121 - 163 C.
Longitudinal joints and edges shall be constructed true to the delineating lines parallel to the center
line of the road. Longitudinal joints shall be offset by at least 150 mm from those in the binder
course. All joints shall be cut vertical to the thickness of the previously laid mix and the surface
painted with not bitumen before placing fresh materials.
Immediately after the spreading of mix. It shall be thoroughly compacted by rolling with a set of
rollers moving at a speed not exceeding 5 Km. per hour. The initial or break rolling shall be with 8-12
tonne wheel roller and the surfaced finished by initial rolling with 8-10 tonne rollers or suitable
pneumatic rollers.
The roller wheels shall be kept damp to prevent the mix from adhering to them but in case shall fuel
lubricating oil be used for this purpose. Rolling shall commence longitudinally, from the edge and
progress towards the center except that on super elevated portions, it shall progress from the lower
to upper edge parallel to the center line of the payment. The roller should proceed on the fresh
material with rear and fixed wheel loading so as to minimize the pushing of the mix and each pass of
the roller shall uniformly overlap not less than one third of the track made in the preceding pass.
Rolling shall continue until the entire surface has been rolled to compaction and all the roller marks
6. OPENED TO TRAFFIC :
Traffic may be allowed immediately after completion of the final rolling when the mix has cooled
down to the surrounding temperature.
5, SURFACE FINISH AND QUALITY CONTROL OF WORK :
The surface finish of construction shall conform to the requirements of M.O.S.T. specification Clause-
901. Control on the quality of material and works shall be exercised by the Engineer-in-charge in
accordance with M.O.S.T. specification, Clause-902.
6. ARRANGEMENT FOR TRAFFIC :
The provision of M.O.S.T. specification, Clause-105 shall apply as regards the flow of traffic during
Ahmedabad Urban Development Authority (A.U.D.A.)
7. MEASUREMENT FOR PAYMENT :
The payment shall be made in the tonnage basis of the weight of mix of aggregates and bitumen. For
this purpose, the contractor shall have to install a weight-bridge of suitable capacity for the purpose
of weighing of dumpers at suitable place at his cost as directed. Weight of empty dumper and
weight of loaded dumper will be recorded in bound and numbered register on plant site.
Department will be free to get some loaded dumpers test checked at other weight bridge. Weight
bridge will be periodically got calibrated and verified from weight and measure authorities.
For the purpose of application of tack coat if the theoretical area as per sanctioned estimate for
basis of tonne differs with the actual area of work done in the field, then the reduction in or addition
to payment shall have to be effected to the contractor on pro rata basis depending upon the area
reduced or exceeded respectively.
Weight of mix materials will be done in presence of responsible person not less than the rank of
supervisor of Department and the measurement shall be recorded by the Deputy Executive Engineer
or Assistant Engineer or Addl. Assistant Engineer if so authorized. Record or each dumper will be
maintained separately in bound and numbered register which will be maintained by the
Departmental representatives and signed by the contractor. Proper gate pass system shall be
established for the vehicles coming to the plant site and outgoing from the plant site. The location of
the kilometer, hectometer and meter, in which individual dumpers are unloaded by recorded
Providing & Laying 120 mm Dense Bituminous Macadm in Single leyers with Crushed stone
aggregate and filler meterial as per gradation of MOST and bitumen VG-40 at a rate of 45 Kg/MT
(4.5%) by weight of total mix for mixing & tack coat at 2.50 kg. / 10 sq.m.on B.T. Surface on each
layers & using mix by hot laid process including heating the asphalt and aggregate in Batch mix
plant transporting the mix and spreading the same by electronic sensor paver and consolidation
with vibratory roller including and with a pneumatic tyre roller.necessary fire wood oil.lubicant
labour and hire charges of required plant machinery etc.complete as per technical specification
ThespecificationdescribesthedesignandconstructionprocedureforDenseBituminous
Macadam,(DBM),forusemainly,butnotexclusively,inbase/binderandprofilecorrective
courses.TheworkshallconsistofconstructioninasingleormultiplelayersofDBMonapreviouslyp
reparedbaseorsub-base.Thethicknessofasinglelayershallbe50mm
ThebitumenshallbeviscositygradepavingbitumencomplyingwiththeIndianStandard
SpecificationIS:73,modifiedbitumencomplyingwithClause501.2.1orasotherwise
specifiedintheContract.
Thetypeandgradeofbitumentobeused shallbespecifiedintheContract.
Ahmedabad Urban Development Authority (A.U.D.A.)
CoarseAggregates
Thecoarseaggregatesshallconsistofcrushedrock,crushedgravelorotherhardmaterialretain
edon2.36mmsieve.Theyshallbeclean,hard,durable,ofcubicalshape,freefromdustandsoftor
friablematter,organicorotherdeleterioussubstances.WheretheContractor'sselectedsource
ofaggregateshaspooraffinityforbitumen,theContractorshallproducetestresultsthatwithth
strippingagents,thestrippingvalueisimprovedtosatisfythespecificationrequirements.TheE
ngineermayapprovesuchasourceandasaconditionfortheapprovalofthatsource,thebitume
nshallbetreatedwithanapprovedanti-
strippingagent,asperthemanufacturer'srecommendations,atthecostoftheContractor.Thea
ggregatesshallsatisfytherequirementsspecifiedinTable500-8.
Wherecrushedgravelisproposedforuseasaggregate,notlessthan90percentbyweightofthec
rushedmaterialretainedon the4.75mmsieveshallhaveatleasttwofracturedfaces.
Fineaggregatesshallconsistofcrushedornaturallyoccurringmineralmaterial,oracombinatio
nofthetwo,passingthe2.36mmsieveandretainedonthe75micronsieve.Theseshallbeclean,h
ard,durable,dryandfreefromdust,andsoftorfriablematter,
organicorotherdeleteriousmatter.Naturalsandshallnotbeallowedinbindercourses.Howev
er,naturalsandupto 50percentofthefineaggregatemaybeallowedin
basecourses.Thefineaggregateshallhaveasandequivalentvalueofnotlessthan50whenteste
dinaccordancewiththerequirementofIS:2720(Part37).Theplasticityindexofthefractionpass
0.425mmsieveshallnotexceed4,whentestedinaccordancewithIS:2720(Part5).
Filtershallconsistoffinely
dividedmineralmattersuchasrockdust,hydratedlimeorcementapprovedbytheEngineer.Th
efillershallbegradedwithinthelimitsindicatedinTable500-9.
Thefillershallbefreefromorganicimpurities andhavea plasticity
Indexnotgreaterthan4.ThePlasticityIndexrequirementshallnotapplyiffilleriscementorlime
. Wherethe aggregatesfailtomeettherequirementsofthewatersensitivitytestinTable500-
8,then2percentbytotalweightofaggregate,ofhydratedlimeshallbeusedandpercentageoffi
neaggregatereducedaccordingly.
AggregateGradingandBinderContent
Ahmedabad Urban Development Authority (A.U.D.A.)
WhentestedinaccordancewithIS:2386Part1(wetsievingmethod),the
combinedgradingofthecoarseandfineaggregatesandfillerfortheparticularmixtureshallfall
withinthelimitsgiveninTable500-
10forgrading1or2asspecifiedintheContract.Toavoidgapgrading,thecombinedaggregategr
adationshallnotvaryfromthelowerlimitononesievetohigherlimit ontheadjacentsieve.
Table500-8:PhysicalRequirementsforCoarseAggregateforDenseBituminousMacadam
Property Test Specification MethodofTest
Cleanliness(dust) Grainsizeanalysis Max5%passing IS:2386PartI
Particleshape CombinedFlakinessandElong Max35% IS:2386PartI
Strength LosAngelesAbrasionValu Max35% IS:2386PartIV
AggregateImpactValue
Durability Soundnesseither:SodiumSulph Max12% IS:2386PartV
MagnesiumSulphate
WaterAbsorption WaterAbsorption Max2% IS:2386PartIll
Stripping Coatingand Minimumretained IS:6241
StrippingofBitumenAggrega coating95%
WaterSensitivity RetainedTensileStre Min.80% AASHTO283
* Todeterminethiscombinedproportion,theflakystonefromarepresentativesampleshouldfir
stbeseparatedout.Flakinessindexisweightofflakystonemetaldividedbyweightofstonesample.Onlytheelo
ngatedparticlesbeseparatedoutfromtheremaining(non-flaky)stonemetal.Elongationindexis
weightofelongatedparticlesdividedbytotalnon-
flakyparticles.Thevaluesofflakinessindexandelongationindexsofoundareaddedup.
Iftheminimumretainedtensileteststrengthfallsbelow80percent,useofantistrippingagentis
recommendedtomeettherequirement.
Table500-9:GradingRequirementsforMineral Filler
Ahmedabad Urban Development Authority (A.U.D.A.)
ISsieve(mm) CumulativePercentPassingbyWeightofTotalAggregat
Table500-10:CompositionofDenseGradedBituminousMacadam
Nominalaggregatesize* 37.5mm 26.5mm
Layerthickness 75-100mm 50-75mm
ISSieve1(mm) Cumulative%byweightoftotalaggregatepassing
Bitumencontent%bymass Min4.0** Min4.5**
* Thenominalmaximumparticlesizeisthelargestspecifiedsievesizeuponwhichanyoftheag
gregateisretained.
Correspondstospecificgravityofaggregatesbeing2.7.Incaseaggregatehavespecificgravi
tymorethan2.7,theminimumbitumencontentcanbereducedproportionately.
Furthertheregionwherehighestdailymeanairtemperatureis30°Corlowerandlowestdailyairtemp
eratureis-10°Corlower,thebitumencontentmaybeincreasedby
Ahmedabad Urban Development Authority (A.U.D.A.)
BitumencontentindicatedinTable500-
10istheminimumquantity.ThequantityshallbedeterminedinaccordancewithClause505.3.
The bitumen content required shall be determined following the Marshall mix
designprocedurecontainedinAsphaltInstituteManualMS-2.
TheFinestoBitumen(F/B)ratiobyweightoftotalmixshallrangefrom0.6to1.2.
RequirementsfortheMix
Apartfromconformitywiththegradingandqualityrequirements forindividualingredients,the
mixtureshallmeettherequirementssetoutinTable500-11.
Table500-11:RequirementsforDenseGradedBituminousMacadam
Properties ViscosityGr Modifiedbitumen TestMethod
adePaving Hotclimate Coldclimate
Compactionlevel 75blowsoneachfaceofthespecimen
Minimumstability(kNat60 9.0 12.0 10.0 AASHTOT245
Marshall flow(mm) 2-4 2.5-4 3.5-5 AASHTOT245
MarshallQuotient 2-5 2.5-5 MS-
%VoidsFilledwithBitume 65-75
Coatingofaggregatepartic 95%minimum IS:6241
TensileStrengthratio 80%Minimum AASHTOT283
%VoidsinMineralAggreg Minimumpercent voidsinmineralaggregate(VMA)
ate(VMA) aresetoutinTable500-13
Ahmedabad Urban Development Authority (A.U.D.A.)
Thebindercontentshallbeoptimizedtoachievetherequirementsofthemixsetoutin Table500-
11.Thebindercontentshallbeselectedtoobtain4percentairvoidsinthemixdesign.TheMarshall
methodfordeterminingtheoptimumbindercontentshallbeadoptedasdescribedintheAsphaltI
nstituteManualMS-2.
Wheremaximumsizeof theaggregateismorethan26.5mm,themodifiedMarshallmethod
using150mmdiametrespecimendescribedinMS-2andASTMD5581shallbeused.This
methodrequiresmodifiedequipmentandprocedures.WhenthemodifiedMarshalltestis
used,thespecifiedminimumstabilityvaluesinTable500-12shallbemultipliedby2.25,and
theminimumflowshallbe3mm.
Table500-12:MinimumPercentVoidsInMineralAggregate(VMA)
NominalMaximumParticleSize 1(mm) MinimumVMAPercentRelatedto
DesignPercentageAirvoids
:Interpolateminimumvoidsinthemineralaggregate(VMA)fordesignedpercentageairvoidsvaluesbe
tweenthoselisted.
TheContractorshallsubmittotheEngineerforapprovalatleast21
daysbeforethestartthework,thejobmixformulaproposedforuseintheworks,togetherwiththef
ollowingdetails:
i) Sourceandlocationofallmaterials;
ii) Proportionsofall materialsexpressedasfollows:
a) Bindertype,andpercentagebyweightoftotalmix;
b) Coarseaggregate/Fineaggregate/Mineralfilleraspercentagebyweightoftotalaggregatei
ncludingmineralfiller;
iii) A single definite percentage passing each sieve for the mixedaggregate;
Ahmedabad Urban Development Authority (A.U.D.A.)
iv) Theindividualgradingsoftheindividualaggregatefraction,andthe
proportionofeachinthecombinedgrading;
v) Theresultsofmixdesignsuchasmaximumspecificgravityofloosemix(Gmm),compacteds
pecimendensities,Marshallstability,flow,airvoids,VMA,VFBandrelatedgraphsandtestresults
ofAASHTOT283Moisturesusceptibilitytest;
vi) Wherethemixerisa
batchmixer,theindividualweightsofeachtypeofaggregate,andbinderperbatch;
vii) Testresults of physicalcharacteristicsofaggregatestobeused;
viii) Mixingtemperatureandcompactingtemperature.
Whileestablishingthejobmixformula,theContractorshallensurethatitisbasedonacorrectandt
rulyrepresentativesampleofthematerialsthat willactuallybeusedinthework
andthatthemixanditsdifferentingredientssatisfythephysicalandstrengthrequirements
oftheseSpecifications.
ApprovalofthejobmixformulashallbebasedonindependenttestingbytheEngineerforwhichsam
plesofallingredientsofthemixshallbefurnishedby theContractorasrequiredbytheEngineer.
Theapprovedjobmixformula
shallremaineffectiveunlessanduntilarevisedJobMixFormulaisapproved.Shouldachangeinthe
sourceofmaterialsbeproposed,anewjobmixformulashallbeforwardedbytheContractortothe
Engineerforapprovalbeforetheplacingofthematerial.
PlantTrials-PermissibleVariationinJobMixFormula
Oncethelaboratoryjobmixformulaisapproved,theContractor shallcarry out
planttrialstoestablishthattheplantcanproduceauniformmixconformingtotheapprovedjobmi
xformula.Thepermissiblevariationsoftheindividualpercentages
ofthevariousingredientsintheactualmix
fromthejobmixformulatobeusedshallbewithinthelimitsasspecifiedinTable500-
13andshallremainwithinthegradationband.
Thesevariationsareintendedtoapplytoindividualspecimenstakenforqualitycontroltestsinacc
ordancewithSection900.
Table500-13:PermissibleVariationsintheActualMixfromtheJobMixFormula
Description Base/binderCourse
Aggregatepassing19mmsieveorlarger
Aggregatepassing13.2mm,9.5mm
Aggregatepassing4.75mm
Aggregatepassing2.36mm,1.18mm,0.6mm ±5%
Ahmedabad Urban Development Authority (A.U.D.A.)
Aggregatepassing 0.3mm,0.15mm ±4%
Aggregatepassing0.075mm ±2%
Bindercontent ±0.3%
Mixingtemperature ±10°C
Oncetheplanttrialshavebeensuccessfullycompletedandapproved,theContractorshallcarryo
utlayingtrials,todemonstratethattheproposedmixcanbesuccessfullylaidandcompactedallin
accordance withClause501.Thelayingtrialshallbecarriedoutona
suitableareawhichisnottoformpartoftheworks.Theareaofthelayingtrialsshallbeaminimumof100sq.mo
fconstructionsimilartothatoftheprojectroad,anditshallbeinallrespects,particularlycompaction,thesam
eastheprojectconstruction,onwhichthebituminousmaterialistobelaid.
ContractorshallpreviouslyinformtheEngineeroftheproposedmethodforlayingandcompactingthe
material.Theplanttrialsshallthenestablishiftheproposedlayingplant,compactionplant,andmetho
dologyiscapableofproducingsatisfactory
results.Thedensityofthefinishedpavinglayershallbedeterminedby
takingcores,nosoonerthan24hoursafterlaying,orbyother
approvedmethod.ThecompactedlayersofDenseGradedBituminousMacadam(DBM)shallhaveami
nimumfielddensityequaltoormorethan92%ofthedensitybasedontheoreticalmaximumspecificgra
vity(Gmm)obtainedonthedayofcompactioninaccordancewithASTM D2041.
Oncethelayingtrialshavebeenapproved,thesameplantandmethodologyshallbeappliedtothel
ayingofthematerialontheproject,andnovariationofeithershallbeacceptable,
unlessapprovedinwritingbytheEngineer,whomayathisdiscretionrequirefurtherlayingtrials.
ConstructionOperations
WeatherandSeasonalLimitations
TheprovisionsofClause501.5.1shallapply.
PreparationofBase
ThebaseonwhichDenseGradedBituminousMaterialistobelaidshallbepreparedinaccordance
withClauses501and902asappropriate,oras directedbytheEngineer.
WhereGeosyntheticsarespecifiedintheContract,thisshallbeinaccordancewiththerequireme
ntsstatedinClause703.
StressAbsorbingLayer
WhereastressabsorbinglayerisspecifiedintheContract,thisshallbeapplied inaccordance
withtherequirementsofClause517.
Ahmedabad Urban Development Authority (A.U.D.A.)
Wherethematerialonwhichthedensebituminousmacadamistobelaidisotherthanabitumenb
oundlayer,aprimecoatshallbeapplied,asspecified,inaccordancewiththeprovisions
ofClause502,orasdirectedbytheEngineer.
Wherethematerialonwhichthedensebituminousmacadamistobelaidiseitherbitumenboundl
ayerorprimedgranularlayer,tackcoatshallbeapplied,asspecified,inaccordancewiththeprovisi
onsofClause503,or asdirectedbytheEngineer.
MixingandTransportationoftheMix
TheprovisionsasspecifiedinClauses501.3and501.4shallapply.Table500-
2givesthemixing,layingandrollingtemperaturefordense
mixesusingviscositygradebitumen.Incaseofmodifiedbitumen,thetemperatureofmixingandc
ompactionshallbehigherthanthemixwithviscositygradebitumen.Theexacttemperaturedepe
ndsuponthetypeandamountofmodifierusedandshallbeadoptedaspertherecommendationso
fthemanufacturer.Inordertohaveuniformquality,theplantshallbecalibratedfromtimetotime.
Theprovisionsof Clauses501.5.3and501.5.4shallapply.
ThegeneralprovisionsofClauses501.6and501.7shallapply,asmodifiedbytheapprovedlayingtri
als.Thecompactionprocessshallbecarriedoutbythesameplant,andusingthesamemethod,asa
pprovedinthelayingtrials,whichmaybevariedonlywiththeexpressapprovaloftheEngineerinwr
OpeningtoTraffic
Itshall beensuredthatthetraffic isnotallowedwithout
theapprovaloftheEngineerinwriting,onthesurfaceuntilthedensebituminouslayerhascooledt
otheambienttemperature.
SurfaceFinishandQualityControlofWork
Thesurfacefinishofthecompletedconstructionshallconformto the
requirementsofClause902.Allmaterialsandworkmanshipshallcomplywiththeprovisionssetou
tinSection900oftheseSpecifications.
ArrangementsforTraffic
Duringtheperiodofconstruction,arrangementsfortrafficshallbemadein
accordancewiththeprovisionsofClause112.
MeasurementforPayment
DenseGradedBituminousMaterialsshallbemeasuredasfinishedworkeitherincubic
metres,tonnesorbythesquaremetreataspecifiedthicknessasindicatedintheContractdrawings
,ordocuments,orasotherwisedirectedbytheEngineer.
Ahmedabad Urban Development Authority (A.U.D.A.)
ThecontractunitrateforDenseGradedBituminousMacadamshallbepaymentinfullforcarrying
outalltherequiredoperationsasspecifiedandshallinclude,toallcomponentslistedinClause501.
8.8.2.Therateshallincludetheprovisionofbitumen,at4percentand
4.5percentbyweightofthetotalmixtureforgrading1andgrading2 respectively.
Thevariationinactualpercentageofbitumenusedshallbeassessedandthepaymentadjustedplu
sorminusaccordingly.
Providing and laying 30mm bituminous Concrete using BT aggregate of approved quarry as per
gradation of MOST and bitumen VG-40 at a rate of 54 Kg. per MT (5.4%) by weight of mix by hot
mix hot laid process including heatinf the asphalt and aggregate in drum mix plant/batch mix
plant by transporting the mix and speading the same electronic sensor paver and consolidation
with vibratory roller and with a pneumatic tyre roller incl. necessary fir. wood oil lubricant. labour
and hire charges of required plant machinery etc.complete as per Technical Specification clause
Thisworkshallconsist ofconstructionofBituminousConcrete,
foruseinwearingandprofilecorrectivecourses.Thisworkshallconsistofconstructioninasinglel
ayerofbituminous concreteonapreviously preparedbituminous boundsurface. A
singlelayer shall be30mm/40mm/50mmthick.
ThebitumenshallconformtoClause504.2.1.
CoarseAggregates
ThecoarseaggregatesshallbegenerallyasspecifiedinClause504.2.2,exceptthattheaggregates
shallsatisfythephysicalrequirementsofTable 500-
16andwherecrushedgravelisproposedforuseas aggregate,not lessthan
95percentbyweightofthecrushedmaterial retainedonthe4.75mmsieveshallhaveatleasttwo
fracturedfaces.
Table500-16:PhysicalRequirementsforCoarseAggregateforBituminousConcrete
Property Test Specification MethodofTest
Cleanliness(dust) Grainsizeanalysis Max5%passing IS:2386PartI
Particleshape CombinedFlakinessandElon Max35% IS:2386PartI
Strength LosAngelesAbrasionValueorAggre Max30%Max24 IS:2386PartIV
gateImpactValue %
Ahmedabad Urban Development Authority (A.U.D.A.)
Durability Soundnesseither:SodiumSul Max12% IS:2386PartV
MagnesiumSulphate
Polishing PolishedStoneValue Min55 BS:812-114
WaterAbsorption WaterAbsorption Max2% IS:2386PartIll
Stripping Coatingand Minimumretainedco IS:6241
StrippingofBitumenAggreg ating95%
WaterSensitivity RetainedTensileStrength* Min80% AASHT0283
theminimumretainedtensileteststrengthfallsbelow80percent,useofantistrippingagentisrecommende
dtomeettherequirement.
BasesandSurfaceCourses(Bituminous)Section500
Thefine aggregatesshallbeallasspecifiedinClause 505.2.3.
FillershallbeasspecifiedinClause505.2.4.
AggregateGradingandBinderContent
WhentestedinaccordancewithIS:2386Part1(Wetgradingmethod),thecombinedgradingofthecoa
rseandfineaggregatesandfillershallfallwithinthelimitsshowninTable500-17.Thegrading
shallbeasspecifiedintheContract.
Table500-17:CompositionofBituminousConcretePavementLayers
Nominalaggregatesize* 19mm 13.2mm
Layerthickness 50mm 30-40mm
ISSieve 1(mm) Cumulative%byweightoftotalaggregatepassing
Ahmedabad Urban Development Authority (A.U.D.A.)
Bitumencontent%bymas Min5.2* Min5.4**
*Thenominalmaximumparticlesizeisthelargestspecifiedsievesizeuponwhichanyoftheaggregateisretained.
**Correspondstospecificgravityofaggregatebeing2.7.Incaseaggregatehavespecific
gravitymorethan2.7,theminimumbitumencontentcanbereducedproportionately.Furthertheregionwhere
highestdailymeanairtemperatureis30°Corlowerandlowestdailyairtemperature is-10°Corlower, the
bitumencontent may beincreased by0.5percent
RequirementsfortheMix Clause505.3.1shallapply.
BinderContent Clause505.3.2shallapply.
JobMixFormula Clause505.3.3shallapply.
PlantTrials-PermissibleVariationinJobMixFormula
requirementsforplanttrialsshallbeasspecifiedinClause505.3.4,andpermissiblelimitsforvaria
tionasgiveninTable500-18.
Table500-18:PermissibleVariationsinPlantMixfromtheJobMixFormula
Description PermissibleVariation
Aggregatepassing19mm sieveorlarger ±7%
Aggregatepassing13.2mm,9.5mm ±6%
Aggregatepassing4.75mm ±5%
Aggregatepassing2.36mm,1.18mm,0.6mm ±4%
Aggregatepassing0.3mm,0.15mm ±3%
Aggregatepassing0.075mm ±1.5%
Bindercontent ±0.3%
Mixingtemperature ±10oc
TherequirementsforlayingtrialsshallbeasspecifiedinClause505.3.5.Thecompactedlayersofbit
uminousconcrete(BC)shallhaveaminimumfielddensityequaltoormorethan
Ahmedabad Urban Development Authority (A.U.D.A.)
percentoftheaveragetheoreticalmaximumspecificgravity(Gmm)
obtainedonthedayofcompactioninaccordancewithASTM02041.
ConstructionOperations
WeatherandSeasonalLimitations
TheprovisionsofClause501.5.1shallapply.
BasesandSurfaceCourses(Bituminous)Section500
PreparationofBase
Thesurfaceonwhichthebituminousconcreteistobelaidshallbepreparedin
accordancewithClauses501and902asappropriate,orasdirectedbytheEngineer.Thesurfacesh
allbethoroughlysweptcleanbymechanicalbroomanddustremovedbycompressedair.In
locationswhereamechanicalbroomcannotgetaccess,otherapprovedmethodsshallbeusedasd
irectedbytheEngineer.
GeosyntheticsarespecifiedintheContract,thisshallbeinaccordancewiththerequirementssta
tedinClause703.
StressAbsorbingLayer
WhereastressabsorbinglayerisspecifiedintheContract,thisshallbeappliedinaccordancewithth
erequirementsofClause517.
TheprovisionsasspecifiedinClause504.4.6shallapply.
MixingandTransportationoftheMix
TheprovisionsasspecifiedinClauses501.3,501.4and504.4.7shallapply.
ThegeneralprovisionsofClauses501.6and501.7shallapply,asmodifiedbytheapprovedlayingtria
ThegeneralprovisionsofClauses501.6and501.7shallapply,asmodifiedbytheapprovedlayingtria
OpeningtoTraffic
ProvisionsinClause504.5shallapply.
Ahmedabad Urban Development Authority (A.U.D.A.)
SurfaceFinishandQualityControl
The surfacefinish ofthe completed construction shall conform to the requirements of
Clause 902.All materials andworkmanship shallcomplywiththe provisions setout in
Section900oftheseSpecifications.
ArrangementsforTraffic
Duringtheperiodofconstruction,arrangementsfortrafficshallbemadein
accordancewiththeprovisionsofClause112.
MeasurementforPayment
ThemeasurementshallbeasspecifiedinClause505.8.
ThecontractunitrateshallbeallasspecifiedinClause504.9,exceptthattherateshallincludethepr
ovisionofbitumenat5.2percent&5.4percentforgrading1andgrading2byweightoftotalmixres
pectively.Thevariationinactualpercentageofbitumenusedwillbeassessedandthepaymentadj
ustedplusandminusaccordingly.
Thisworkshallconsist ofconstructionofBituminousConcrete,
foruseinwearingandprofilecorrectivecourses.Thisworkshallconsistofconstructioninasinglela
yerofbituminous concreteonapreviously preparedbituminous boundsurface. A singlelayer
shall be30mm/40mm/50mmthick.
ThebitumenshallconformtoClause504.2.1.
CoarseAggregates
ThecoarseaggregatesshallbegenerallyasspecifiedinClause504.2.2,exceptthattheaggregates
shallsatisfythephysicalrequirementsofTable 500-
16andwherecrushedgravelisproposedforuseas aggregate,not lessthan
95percentbyweightofthecrushedmaterial retainedonthe4.75mmsieveshallhaveatleasttwo
fracturedfaces.
Table500-16:PhysicalRequirementsforCoarseAggregateforBituminousConcrete
Property Test Specification MethodofTest
Ahmedabad Urban Development Authority (A.U.D.A.)
Cleanliness(dust) Grainsizeanalysis Max5%passing IS:2386PartI
Particleshape CombinedFlakinessandElon Max35% IS:2386PartI
Strength LosAngelesAbrasionValueorAggre Max30%Max24 IS:2386PartIV
gateImpactValue %
Durability Soundnesseither:SodiumSul Max12% IS:2386PartV
MagnesiumSulphate
Polishing PolishedStoneValue Min55 BS:812-114
WaterAbsorption WaterAbsorption Max2% IS:2386PartIll
Stripping Coatingand Minimumretainedco IS:6241
StrippingofBitumenAggreg ating95%
WaterSensitivity RetainedTensileStrength* Min80% AASHT0283
theminimumretainedtensileteststrengthfallsbelow80percent,useofantistrippingagentisrecommende
dtomeettherequirement.
Thefine aggregatesshallbeallasspecifiedinClause 505.2.3.
FillershallbeasspecifiedinClause505.2.4.
AggregateGradingandBinderContent
WhentestedinaccordancewithIS:2386Part1(Wetgradingmethod),thecombinedgradingofthecoa
rseandfineaggregatesandfillershallfallwithinthelimitsshowninTable500-17.Thegrading
shallbeasspecifiedintheContract.
Table500-17:CompositionofBituminousConcretePavementLayers
Nominalaggregatesize* 19mm 13.2mm
Layerthickness 50mm 30-40mm
ISSieve 1(mm) Cumulative%byweightoftotalaggregatepassing
Ahmedabad Urban Development Authority (A.U.D.A.)
Bitumencontent%bymassoftot Min5.2* Min5.4**
Thenominalmaximumparticlesizeisthelargestspecifiedsievesizeuponwhichanyoftheaggregateisretained.
Correspondstospecificgravityofaggregatebeing2.7.Incaseaggregatehavespecific
gravitymorethan2.7,theminimumbitumencontentcanbereducedproportionately.Furthertheregionwhere
highestdailymeanairtemperatureis30°Corlowerandlowestdailyairtemperature is-10°Corlower, the
bitumencontent may beincreased by
MixDesign RequirementsfortheMix Clause505.3.1shallapply.
Clause505.3.2shallapply.
Clause505.3.3shallapply.
PlantTrials-PermissibleVariationinJobMixFormula
requirementsforplanttrialsshallbeasspecifiedinClause505.3.4,andpermissiblelimitsforvariatio
nasgiveninTable500-18.
Table500-18:PermissibleVariationsinPlantMixfromtheJobMixFormula
Description PermissibleVariation
Aggregatepassing19mm sieveorlarger ±7%
Aggregatepassing13.2mm,9.5mm ±6%
Aggregatepassing4.75mm ±5%
Aggregatepassing2.36mm,1.18mm,0.6mm ±4%
Aggregatepassing0.3mm,0.15mm ±3%
Aggregatepassing0.075mm ±1.5%
Ahmedabad Urban Development Authority (A.U.D.A.)
Bindercontent ±0.3%
Mixingtemperature ±10oc
TherequirementsforlayingtrialsshallbeasspecifiedinClause505.3.5.Thecompactedlayersofbitu
minousconcrete(BC)shallhaveaminimumfielddensityequaltoormorethan
percentoftheaveragetheoreticalmaximumspecificgravity(Gmm)
obtainedonthedayofcompactioninaccordancewithASTM02041.
ConstructionOperations
WeatherandSeasonalLimitations
TheprovisionsofClause501.5.1shall apply.
PreparationofBase
Thesurfaceonwhichthebituminousconcreteistobelaidshallbepreparedin
accordancewithClauses501and902asappropriate,orasdirectedbytheEngineer.Thesurfacesh
allbethoroughlysweptcleanbymechanicalbroomanddustremovedbycompressedair.Inlocatio
nswhereamechanicalbroomcannotgetaccess,otherapprovedmethodsshallbeusedasdirected
GeosyntheticsarespecifiedintheContract,thisshallbeinaccordancewiththerequirementsstat
StressAbsorbingLayer
WhereastressabsorbinglayerisspecifiedintheContract,thisshallbeappliedinaccordancewithth
erequirementsofClause517.
TheprovisionsasspecifiedinClause504.4.6shallapply.
MixingandTransportationoftheMix
TheprovisionsasspecifiedinClauses501.3,501.4and504.4.7shallapply.
ThegeneralprovisionsofClauses501.6and501.7shallapply,asmodifiedbytheapprovedlayingtria
ThegeneralprovisionsofClauses501.6and501.7shallapply,asmodifiedbytheapprovedlayingtria
Ahmedabad Urban Development Authority (A.U.D.A.)
OpeningtoTraffic
ProvisionsinClause504.5shallapply.
SurfaceFinishandQualityControl
The surfacefinish ofthe completed construction shall conform to the requirements of
Clause 902.All materials andworkmanship shallcomplywiththe provisions setout in
Section900oftheseSpecifications.
ArrangementsforTraffic
Duringtheperiodofconstruction,arrangementsfortrafficshallbemadein
accordancewiththeprovisionsofClause112.
MeasurementforPayment
ThemeasurementshallbeasspecifiedinClause505.8.
ThecontractunitrateshallbeallasspecifiedinClause504.9,exceptthattherateshallincludethepr
ovisionofbitumenat5.2percent&5.4percentforgrading1andgrading2byweightoftotalmixres
pectively.Thevariationinactualpercentageofbitumenusedwillbeassessedandthepaymentadj
ustedplusandminusaccordingly.
Providing and laying Asphalt painting as wearing course using bitumen VG 40 (40/60) @ rate of
5.0 Kg./10 sq.m. and stone dust 0.1 Cum/10 Sqm of road surface etc.complete as per Technical
Specifications.
1 Preparation of base : The surface on which the tack coat is to be applied shall be cleaned of
dust and extraneous material before the application of the binder by using mechanical broom or any
other approved equipment / method as specified by the Engineer. The prime coat must be applied
one day before the execution of asphalt work
2 Application of binder : Binder may be heated to the temperature appropriate to the
grade of bitumen used and approved by the engineer and sprayed on the base at the rate
specified in item of work .The normal range of spraying temperature for bitumen 60/70. It
shall be the responsibility of the contractor to carefully handle the inflammable bituminous
material so as to safe guard against any fire mishap. The binder shall be applied uniformly
with the aid of either self propelled or towed bitumen pressure sprayer with self heating
arrangement and spraying bar with nozzles having constant volume or pressure system,
capable or spraying bitumen at specified rate and temperature so as to provide a uniformly
unbroken spread of bitumen. Work should be planned so that no more than the necessary
tack coat for the day’s operation is placed on the surface. After application and prior to
Ahmedabad Urban Development Authority (A.U.D.A.)
succeeding construction allow the prime tack coat to cure, without being disturbed, until
the water/ cutter has completely evaporated as determined by Engineer.
3. Quality control of work : Control on the quality of material and works shall be exercised by
the Engineer in charge in accordance with section 900 of MORTH specification.
4. Arrangement of traffic: During the period of application of binder for painting coat the
arrangement of traffic shall be done to MORD specification clause 112 of MORTH Specification.
5 Spreading the stone dust on prepared surface at the rate of 0.01 cum /10 smt and brushing etc
comp. required as per specification.
6. Mode of measurement and payment:
The payment shall be made on sq.mt basis of for rate of application as specified in tender
item. The rate is inclusive of cost of asphalt, dust, tools and plants required for applying binder
Providing & Fixing Precast curbing stone of grey cement based on concrete blockof 30x30x15 of
M250 grade concrete as per approved design and including excavation for fixing in c c 1:4:8 (75
mm Thick)proper line and level, filling the joints with CM 1:3 etc complete
This work shall consist of constructing cement concrete Kerbs in the central median and/or along the
footpaths or separators in conformity with the lines, levels and dimensions asspecified in the
Kerbs and kerb with channel shall be provided in cement concrete of Grade M 20 in accordance with
section 1700 of these Specifications.
Type of Construction
These shall be cast-in-situ construction with suitable kerb casting machine in all situations except at
locations where continuous casting with equipment is not practicable. In those situations, precast
concrete block shall be used.
A continuous kerb casting equipment of adequate capacity and controls, capable, of laying the kerbs
in required cross – sections and producing a well-compacted mass of concrete free of voids and
honeycombs, shall be used.
Construction Operations
Kerb shall be laid on firm foundation of minimum 150 mm thickness of cement concrete of M
grade cast in situ or on extended width of pavement. The foundation shall have a projection of
mm beyond the kerb stone. Before laying the foundation of lean concrete, the base shall be leveled
and slightly watered to make it damp.
Ahmedabad Urban Development Authority (A.U.D.A.)
In the median portions in the straight reaches, the kerb shall be cast in continuous length. In the
portions where footpath is provided and/or the slope of the carriageway is towards median (as
in case of super elevated portions),there shall be sufficient gap/recess left in kerb to facilitate
drainage openings.
After laying kerbs and just prior to hardening of the concrete, saw cut grooves shall bprovided at 5 m
intervals or as specified by Engineer.
Kerbs on the drainage ends such as along the footpath or the concrete or the median in super
elevated portions, shall be cast with monolithic concrete channels as indicated in drawing.
The Slope of the channel towards drainage pipes shall be ensured for efficient drainage of the
Vertical and horizontal tolerances with respect to line and level shall be ± 6 mm
Filling of earth work in median shall be carryout as per guided by engineer in charge.
Oil paint colour to Center verge (Kerb) by Yellow/white and Black patta (Three Coat) one coat of
priming & two coat of oil Paint as per Specification shall be as per Item No.19.7/P.No.122, except
Priming coat shall be applied as per Item No.18.11 With distemper priming only .Primer with
white Washing with lime is not allowed.
Measurements for payment
The contract unit rates for cement concrete kerb/kerb with enamel and foundation for kerb shall be
payment in full compensation for furnishing all materials, labour, tools, equipmentfor construction
and other incidental cost necessary to complete
Providing and fixing precast rubber dyed interlocking concrete block 60 mm. thick with grade of
concrete M-200 pneumatic compressed by mechanically and as per approved design including
75mm sand layer for levelling and filling the joint with sand in proper line and level etc. complete
This work shall consist of providing and laying 60 mm thick precast Rubber Dyed
interlocking concrete block specification & samplesover a base layer of 75 mm thick layer of sand of
the shape and dimensions shown on the drawings and conforming to these specifications or as
approved by the Engineer in charge.
Water shall conform to M-1. Cement shall conform to M-3.
1.0 Rubber Dyed interlocking concrete block
Rubber Dyed interlockingconcrete block shall be of approved size brand and make as
approved by Engineer in charge.
Ahmedabad Urban Development Authority (A.U.D.A.)
1.1 The size shape and design of rubber Dyed interlockingconcrete block shall generally be as
per manufacturers product or as directed by the Engineer in charge and Architect.
1.2 The rubber Dyed interlockingconcrete block shall satisfy the tests as regards compress
strength transverse strength resistance to wear and water absorption.
1.3 The colour size shape and design of the rubber Dyed interlockingconcrete block shall be
directed by Engineer or Architect.
1.4 The rubber Dyed interlockingconcrete block shall be of best quality as approved by the
Engineer In charge. They shall be flat and true to shape. They shall be free form cracks, crazing spots,
chipped edges and corners. The glazing shall be of uniform shade.
2.1 Sand shall be natural sand, clean well graded, hard strong durable and gritty particular free
from immures amounts of dust, clay, kankar modules.
2.2. For masonry works sand shall confirm to the requirements of IS:
2.3. For plain and reinforced cement concrete (PCC and RCC) or pre stressed concrete (PSC)
works fine aggregates shall consist of clean, hard strong and durable prices of crushed stone,
crushed gravel or suitable combination of natural sand crushed stone or gravel, They shall not
contain dust lumps soft or flaky materials mica or other deleterious materials in such quantities as to
reduce the strength and durability of concrete, or to attack the embedded steel. Motorized sand
washing machines should be used to remove impurities from sand. Fine aggregate having positive
alkali-silica reaction shall not be used. All fine aggregates shall conform to IS L 383 and tests for
conformity shall be carried out as per IS : 2386 (Part I to VIII) The contractor shall submit to the
Engineer in charge the entire information indicated in Appendix A of IS : 383. The fineness modulus
of fine aggregate shall neither be less than 2.00 nor greater than 3.5.
2.4. Sand fine aggregates for structural concrete shall conform to the following grading
requirements as shown in the table below
2.5 Fine Sand: The fineness module shall not exceed 1.0 the sieve analysis of fine sand be as
IS. Sieve Designation % by wt. passing
Zone I Zone II Zone III
Ahmedabad Urban Development Authority (A.U.D.A.)
Coarse Sand: The fineness modules of coarse sand shall not be less than 2.5 and shall not
exceed 3.0. The sieve analysis of coarse sand be as under:
I. S. Sieve Designation % by wt. passing
3.0 WORKMANSHIP
3.1 The rubber Dyed interlockingconcrete block shall be laid on a layer 7.5 cm thick layer of
coarse sand. The slope in the floors shall be provided in the sub grade. The base layer shall be
properly watered, rammed and consolidated. Before laying the pavers blocks, it shall be moisture.
Plinth masonry offset shall be depressed so as to allow the sub grade concrete to rest on it.
3.2 Rubber Dyed interlockingconcrete block of approved quality shape and design and shall be
laid evenly to level and slope as directed by Engineer in charge over a bed of a base layer consisting
of 75mm thick sand layer.
3.3 Laying: The rubber Dyed interlockingconcrete block shall be laid in plain, diagonal or other
pattern as directed. The cement concrete blocks shall be laid properly and set home by gentle
3.4 End portion of pavement shall be finished with C.M. 1:3 as per detailed drawing etc.
4.0 MODE OF MEASURMENT AND PAYMENT
4.1 The unit rate rubber Dyed interlockingconcrete block flooring shall include the cost of all
materials, tools and plant required for supplying and laying material like brick bats sand pavers
blocks, laying of base layer in true level and slope as required applying & placing pavers blocks in
position, compacting, finishing, curing.
Ahmedabad Urban Development Authority (A.U.D.A.)
4.2 The length and breadth shall be measured correct to a Square meter correct to 2 places of
decimal. Length and breadth shall be measured to correct to a centimeter and between the finished
the finished face of the skirting, dedo or wall plaster and no deduction shall be made nor extra paid
for any opening in floors or areas up to 0.1 square meter.
4.3 The rate shall be for a unit of one Square meter.
Supplying and fixing of 380 mm H x 300 mm ( or 250 mm) L x 200 mm B Kerb block for Central
Verge in M-20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed finish/ formwork, mould with well
equipped with vibratory system for kerb stones of approved design including curing, etc.
complete, including the cost of formwork etc. complete. The rate shall also include necessary
cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding with
necessary equipments and materials. The rate shall also include the flush pointing in CM (1:3) for
all joints of the kerb stones. Filling of zari alone the sides of the kerb stone fixed with Bituminous
concrete mixed in proper position as directed by Engineer in change to form a portable mixture.
In any case Gravel or such type of materials shall not be allowed for production.
The specifiction of following materials shall be conforming with specification mentioned for relavent
material / items in General technical specification for building work of R&B Department of Gujarat.
Water shall conform to M-1
Graded stoneaggregate 20 mm.
nominal size to M-10
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific
machineries shall be used to manufacture the precast blocks. These machineries should be
compatible to produce blocks of required strength and dimensions. The machine shall contain
hydraulic Press or advanced equipment to generate required compaction & Grade and finish.
Moulds/ Steel Plates/ Dies of the machine shall be dimensionally checked & to be got approved
before commencing the production. Contractor shall prepare proper Drying Yard for keeping the
blocks before curing. The drying yard shall be levelled and covered so that no shrinkage cracks are
formed. Contractor shall prepare adequate size curing pond to cure the blocks for not less than
Days. No other means of curing shall be allowed. The technical specification of concrete shall
confirm to IS 456-2000. The concrete mix is not required to be designed and only nominal mix as per
IS: 456-2000 shall be followed. The proportion of the concrete mix shall be 1:1.5:3 (1 cement:
coarse sand: 3 graded stone aggregate 20 mm. nominal size) by volume. Concrete work shall have
fairly exposed concrete surface or as specified in the item. The designation ordinary M-10, M-15, M-
20, M-25 specified as per I.S. corresponds approximately to 1:3:6, 1:2:4, 1:1.5:3 and 1:1:2 nominal
Ahmedabad Urban Development Authority (A.U.D.A.)
mix of ordinary concrete, by volume respectively. The ingredients required for ordinary concrete
containing one bag of cement of 50 Kg. by weight (0.0342 m3.) for different proportions of mix shall
be as per IS 456-2000. The proportion of the aggregate for the kerb stone shall be modified as per
the approval of the engineer-in-charge. The water cement ratios shall not be more than those
specified as per IS. The cement of the mix shall be increased, if the quantity of water in a mix has to
be increased to overcome the difficulties of placement and compaction so that the water cement
ratio specified in the table is not exceeded. The maximum size of coarse aggregate shall be as large
as possible within the limits specified but in no case greater than 1/4th of the minimum thickness of
the member, provided that the concrete can be placed without difficulty so as to surround all
reinforcement thoroughly and to fill the corners of the form. For reinforced concrete work, coarse
aggregates having a nominal size of 20 mm. are generally considered satisfactory. Admixture shall be
used in concrete only with approval of the Engineer-in-charge based upon the evidence that with the
passage of time, neither the compressive strength of concrete is reduced nor are other requisite
qualities of concrete impaired by the use of such admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of
50 kg weight. The volume of one such bag can be taken as 0.0342 m3. Boxes of suitable sizes shall be
used for measuring sand and aggregate. The size of the boxes (internal) shall be 30cm. x 30 cm. and
38 cm. deep. While measuring the aggregate and sand, the box shall be filled without shaking
ramming or hammering. The proportioning of sand shall be on the basis of its dry volume and in case
of damp sand; allowances for bulk age shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall
be kept in first class working condition and maintained throughout the construction. Measured
quantity of aggregate, sand, and cement required for each batch shall be poured into the drum of
the mechanical mixer while it is continuously running. After about half a minute of dry-mixing,
measured quantity of water required for each batch of concrete mix shall be added gradually and
mixing continued for another one and a half minute. Mixing shall be continued till materials are
uniformly distributed and uniform colour of the entire mass is obtained and each individual particle
of the coarse aggregate shows complete coating of mortar containing its proportionate amount of
cement. In no case shall the mixing be done for less than 2 minutes after all ingredients have been
put into the mixer. Mixers which have been out of use for more than 30 minutes shall be thoroughly
cleaned before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge, the
first batch of concrete from the mixture shall contain only 2/3rds of normal quantity of coarse
aggregate. Mixing plant shall be thoroughly cleaned before changing from one type of cement to
The degree of consistency which shall depend upon the nature of the work and methods of vibration
of concrete shall be determined by regular slump tests in accordance with IS: 1199-1959. The slump
of 10 mm. to 25 mm. shall be adopted when vibrators are used.
Ahmedabad Urban Development Authority (A.U.D.A.)
All Moulds shall be cleaned and made free from standing water, dust, snow, or ice immediately
before placing of concrete.
Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the precast blocks. All the edges of the
precast blocks shall confirm the profile of the final drawing & edges/ curvatures of the moulds shall
be checked accordingly. Moulds shall be regularly checked for correctness of dimensions of Blocks,
twists, bends due to handling, etc. Before starting every days work.
Care shall be taken to set all form work/Mould in perfect line, level (or in required camber or slope
as specified) and plumb. Form work/Mould propping shall be strong, rigid, and sturdy. The form
work/Mould shall be as per pattern & design shown in drawings. Form work/Mould shall be done
accurately and precisely so as to achieve neat, clean and smooth concrete surface, in line, level and
plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall not be allowed. Before
placing concrete, forms shall be thoroughly cleaned off of all rust, dust, and loose materials.
Colourless oil or grease of approved quality shall be applied before placing steel. Also the form work
material will be of wood/plywood/steel or any sort of such material, as approved by the Engineer-in-
Charge and/or his authorized representative; so that all exposed concrete surfaces have uniform
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in charge) of
cement shall be used.
Removal of Moulds:
Specific time shall be identified for removal of moulds, such that the concrete of the precast blocks
shall gain strength to withstand the stresses generated due to self weight and handling to drying
yards without any deformation to shape/ dimensions/ edges.
Sufficient time shall be given to the block after it is removed from the mould so that it can gain
strength and dry in shade to prevent any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site: Water should be drained of from
the block before it is actually sent to the site. Time should be provided for proper draining of water
which may be present in the block kept for curing in the pond.
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses
leading to breaking of block. Care should be taken to prevent the block from breaking during
Ahmedabad Urban Development Authority (A.U.D.A.)
The pits of the size 150mm in width and required depth shall first be excavated, true to line and
level. The relevant specifications of item A- 1 shall be followed for excavation work. The pits shall be
filled with a layer of 50mm. thick sand bedding. The curbs then shall be placed in position of which
50mm. shall be below road. Care should be taken to maintain proper line and level. The joints
between the kerbs shall be pointed with C.M. 1:2 and cured for minimum seven days.
Sampling and testing of concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, cured
and tested at 7 days or 28 days as per requirements in accordance with IS : 516-1959. A random
sampling procedure shall be adopted to ensure that each concrete batch shall have a reasonable
chance of being tested i.e. the sampling should be spread over the entire period of concreting and
cover all mixing units.
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each
sample, 5 for testing at 7 days, and the remaining 5 at 28 days. The samples of concrete shall be
taken on each day of the concreting as per above frequency. The number of specimens may be
suitably increased as deemed necessary by the Engineer-in-charge when procedure of tests given
above reveals a poor quality of concrete and in other special cases. The average strength of the
group of cubes cast for each day shall not be less than the specified cube strength of 200 Kg/cm2 at
28 days. 20% of the cubes cast for each day may have value less than the specified strength provided
the lowest value is not less than 85% of the specified strength. If the concrete made in accordance
with the proportions given for a particular grade, does not yield the specified strength, such
concrete shall be classified as belonging to the appropriate lower grade. Concrete made in
accordance with the proportions given for a particular grade shall not, however, be placed in a
higher grade on the ground that the test strength are higher than the minimum specified. If rock
pockets/honeycombs in the opinion of Engineer-in-charge are of such an extent or character so as to
affect the strength of the structure, materially or to endanger the life of the steel reinforcement, he
may declare the concrete defective and require the removal and replacement of the portion of the
structure affected.
Precast Kerb Stones:
The relevant specifications of concreting as per item above shall be followed except that work shall
be carried out for precast concrete kerb stones as specified in the item. All Precast members shall be
cast at workshop. Sufficient curing shall be done before placement of the same the method of
transporting and placing the precast members shall be as approved by the Engineer-in-charge.
Members shall be so transported that no breakage or undue stresses are induced in them. If
required, all members shall have a key provided on both the faces i.e top and bottom surfaces, of
adequate size so as to fill the same with concrete while laying. The function of this key is to avoid the
leakage through the joint between the precast member and the member on which it is laid.
Mode of Measurements and Payment :
Ahmedabad Urban Development Authority (A.U.D.A.)
The rate shall include cost of formwork and cost of reinforcement. The volume occupied by
reinforcement shall not be deducted from R.C.C. work.
The rate shall be for a unit of Rmt.
Kerb Stone Fixing for Central Verge (for Both sides) 680mm H x 230mm L x 235mm Widthblock for
Footpath in M-20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed finish/ formwork , mould with well
equipped with vibratory system for kerb stones of approved design including curing, etc.
complete, including the cost of formwork etc. complete. The rate shall also include necessary
cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding with
necessary equipments and materials. The rate shall also include the flush pointing in CM (1:3) for
all joints of the kerbstones. Filling of zari alone the sides of the kerb stone fixed with Bituminous
concrete mixed in proper position as directed by Engineer in change to form a portable mixture.
In any case Gravel or such type of materials shall not be allowed for production.
Specification as per Item No. 19 only size of kerb as mentioned in Abstract.
Kerb Stone Fixing for Central Verge (for Both sides) 680mm H x 230mm L x 235mm Width :-
Supplying and Fixing M-20 grade using black trap aggregate of Sevaliya/Timba or
equivalent quality 20mm nominal size for Pre-cast reasonably exposed finish/formwork,
mould with well equiped with vibratory systemfor Kerb Stones of approved design
including curing, etc. complete, including the cost of formwork etc. complete. The rate
shall also include for cutting asphalt erecting and fixing the pieces in position with
necessary equipments and materials. The rate shall also include the flush pointing in CM
(1:3) for all joints of the kerb stones. Filling of zari alone the sides of the kerb stone fixed
prepared with Bituminious concrete mixed in proper position as dire by Engineer in charge
to form a portable mixture. The rate is for fixing kerb stone on Both Sides. In any case
Gravel or such type of materials shall not be allowed for production.
Kerb Stone & top slab Fixing For Central Verge Cost of central block 680mm H x 230mm L x 235mm -
H Supplying and fixing M-20 grade using black trap aggregate of Sevaliya/Timba or equivalent
quality 20 mm. nominal size for pre-cast reasonably exposed finish/ formwork , mould with well
equiped with vibratory system for kerb stones & top slab of approved design including curing, etc.
complete, including the cost of formwork etc. complete. The rate shall also include for cutting
asphalt erecting and fixing the kerbs in position with necessary equipments and materials. The rate
shall also include filling the sand between the gap and flush pointing in CM (1:3) for all joints of the
kerb stones & top slab. Filling of zari alone the sides of the kerb stone fixed prepared with
Bituminous concrete mixed in proper position as dire by Engineer in change to form a portable
mixture The rate is for fixing kerbstone on both sides. Gravel or such type of materials shall not be
allowed for production.
c) Central verge with filling of selected earth
Ahmedabad Urban Development Authority (A.U.D.A.)
The related technical specification is as narrated above.
Payment shall be done in rmt. basis
Pre cast concrete kerb for liner kerbing in plan Providing & fixing M25 grade of concrete precast
exposed/ fare finish/texture finish kerb stones (manufactured on vacuum wet press machine with
hydraulic pressing of wet concrete mixture to a minimum of 400 tons with simultaneous
vacuuming, using ECO filters and developing texture finish) of Vyara or equivalent make; as per
sample approved of following sizes. Kerbs shall be fixed on the foundation prepared of M15 grade
concrete as of approved design including curing, formwork etc. complete. The rate shall also
include for erecting and fixing the pieces in position for complete Kerb systems with Chamfered
type of kerbs including necessary accessories of kerb like Radius Kerbs, Angles and Quadrant Kerbs
etc complete as per drawing. The rate shall also include the flush pointing in CM (1:2) for all joints
of the kerbstones. (Sample must be approved). The contractor rate shall also include the cost of
excavation, base PCC M15 grade and finish good, curing, etc complete as directed by engineer in
(1) Water shall conform to M-1.
(2) Cement shall conform to M-3.
(3) Sand shall conform to M-6.
(4) Stone aggregate shall conform to M-12
(5) Pre cast kerb shall be of approved make and as per approved sample.
2.0 Workmanship :
2.1 All Precast exposed/ fare finish/ texture finish kerb stones shall be manufactured on vaccume
press machine with hydraulic pressing of wet concrete mixture to a minimum of 400 tons with
simultaneous vacuuming, using ECO filters and developing texture finish. Sufficient curing shall be
done before placement of the same.
2.2 The method of transporting and placing the precast members shall be as approved by the
Architect and Engineer-in-charge. Members shall be so transported that no breakage or undue
stresses are induced in them.
2.3 The pits of the size 0.15 M in width and 0.23 M. in depth shall first be excavated, true to line and
level. The specifications for excavation shall be followed as per relevant item.
2.4 The pits shall be filled with a layer of 0.15 M. thick lean concrete M15. The kerbs shall be laid on
existing PCC base in true line and plumb. The specifications for PCC work shall be followed as per
2.5 The rate shall also include for erecting and fixing the pieces in position for complete Kerb
systems with Chamfered type of kerbs including necessary accessories of kerb like Radius Kerbs,
Angles and Quadrant Kerbs etc complete as per drawing. The rate shall also include the flush
pointing in CM (1:2) for all joints of the kerb stones. Ahmedabad Municipal Corporation Section – V:
Work Plan & Technical Specifications Signature of Bidder 101 AMC
3.0 Mode of Measurement & Payment:
3.1 The rate shall include the cost of all labour and activities involved in the operations described
above i.e. excavation, back filling, PCC, precast kerb, laying, jointing and finishing the same.
3.2 The Measurement of the item shall be in Rmt basis.
Providing and Laying of Interlocking grey Paver Block unishape of high density 80 mm thick made
from M-45 Grade concrete using 6 mm to 20 mm machine crushed well graded stone aggregate,
Ahmedabad Urban Development Authority (A.U.D.A.)
sand of approved quality, OPC53 grade cement with contractor’s own concrete mix design as
approved by AUDA cost includes formwork, using rubber/ FRP mould, laying paver block as per
required grading and specification laid paver block shall be mechanically compacted. The work of
the paving blocks shall be level by skilled mason of flooring work only. It should be laid in such a
way that the no cutting of paver block by machine cut only and carting to be done. The finished
surface of the paver block shall have reasonably good plain finish. Paver blocks shall be compacted
and shall be re-laid if necessary gravel or such type of materials shall not be allowed for
production laying on 40 mm thick sand bedding.
40.1 Scope of work :
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil
murrumincluding sorting outs and stacking of useful materials stuff up to 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various
Retail outlets. The work includes: Verification of the existing site condition and advising our project
in charge to lay suitable base course if required. Contractors are required to satisfy themselves with
quality of sub grade, sub-base course before the paver blocks are laid and suggest strengthening if
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
Manufacturing of paver blocks in your plant as per requirements in technical specification enclosed.
Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification on 40 mm thick sand
bedding, within shortest possible time the site is public place hence care should be taken to ensure
that the routine activities should not be disturbed. The job of laying mayrequired to be carried out
during night also.
Testing of paver blocks shall through reputed Govt. /Non Govt. Test house only and submission of
test results as per requirements in Technical Specifications. AUDA reserves the right to carryout test
at random. Cost for such tests to be borne by party. The contractor shall guarantee that all material
and components designed, fabricated, supplied, and laid by him shall be free from any type of defect
due to faulty material and/or workmanship/erection for a period of One year from the date of
completion of work. However, the contractor one year's shall render free maintenance.
TECHNICAL SPECIFICATIONS:
40.2 Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
40.2.1 Concrete Block making Machines:
Ahmedabad Urban Development Authority (A.U.D.A.)
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the
moulds. The machine should have automatic control panel
for uniformity in strength.
40.2.2 Concrete Batching & Mixing Plant: (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient
should be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The
plant should equipped with automatic control panel for maintaining water cement ratio from batch
to batch to obtain concrete of uniform quality and strength. The plant should be equipped with
adequate mechanism for mechanized loading of raw materials into mixer and conveyor belt for
transportation of concrete from mixer to concrete block making machine to maintain quality of wet
40.2.3 The factory should have well designed curing area to ensure adequate curing of paver
40.2.4 Laboratory (Desirable but not essential) :
The testing equipment should have required in the Laboratory as per the following:
A Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
Systematic record of test results of various paver blocks manufactured in the factory.
Concrete Mix Design for various grade of concrete used for making of paver blocks.
40.3 Specifications For Coloured Paver Blocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or
equivalent approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with
minimum colour pigment of 3% by weight of cement. The colour shade shall be “RED” as selected by
AUDA before commencement of the work. White cement shall be used for colored pavers to obtain
the desired colour shade. The job also includes providing 50 mm thick sand bedding to match the
shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months
from the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will
be as per attachment.
40.4 Pavers Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same
should be retained until the laying. The surface should be reasonably smooth and of anti skid and
Ahmedabad Urban Development Authority (A.U.D.A.)
anti glare type. The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling
after vibration on the paver Surface. The concrete mix design should be followed for each batch of
materials separately and automatic batching plant is to be used to achieve uniformity in strength
and quality. The pavers shall be manufactured in single layer only. Skilled labour should be
employed for laying blocks to ensure line and level of laying, desired shape of the surface and
adequate compaction of the sand in the joints. The pavers shall be of cement gray colour without
any pigment & for coloured pavers refer “specifications for coloured pave`” The pavers are to be
skirted all round with kerbing using solid concrete blocks of size 150mm X 250mm X 380mm. The
kerbing should be embedded for 100mm depth. The concrete used for kerbing shall be cured
properly for 7 days minimum.
40.5 Paver Block Dimensions:
Thickness 80 mm
Shape Unipaver, I shape or directed by Addl.C.E.
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of any pigment.
For coloured pavers refer “specifications for coloured
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
40.6 Testing of Paver Blocks :
* TEST Average Values Frequency
1. Compressive Strength Min. 45 N/Sq mm for 250 Smt / 1 Test
2. Flexural Strength Minimum 4.5 N/Sq mm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
* Sampling and testing procedure as per enclosed specifications
40.7 Sampling and Testing Procedure for Paver Blocks
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
40.7.1 Sampling for Testing
Sampling of Paver blocks.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Bill of Quantity.pdf
Read Notice.pdf
Road Tender special condition.pdf
SBD.pdf
Special Condition of Project Vehicle And PC-printer System.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .