Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC ALUVA MUNCIPALITY ALUVA PO PIN 683101 | ERNAKULAM | KERALA | 683101 | ₹4.6 L | L1 | Accepted-AOC l1 |
Tender Value
₹4.9 L
EMD Value
₹12,285
Closing Date
22 Dec 2025, 6:30 pmClosed
ASSISTANT EXECUTIVE ENGINEER
PVIP SUBDIVISION NO 7 KOLENCHERY
lining of canal for a length of 74.5m for bed and both sides is proposd in this estimate. The provisions given in the estimate are Earthwork Excavation, 124 concrete for lining sides and bed, skin reinforcement for lining.
2025_Irrig_803466_3
IRR/PII/3102/2025-2026
Open Tender
Civil Works - Canal
180 days
vadayambady
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,085
Yes
₹12,285
Yes
5 Feb 2026
16 Dec 2025
24 Dec 2025
16 Dec 2025
22 Dec 2025
16 Dec 2025
Amount
rectification
2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Bidder Name
Kuriakose Mathew
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
nit2.pdf
Tender Documents • 0.02 MB
viewsbd2.pdf
Other Document • 4.20 MB
BOQ_1377969.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid