| Sl No | Description | Qty | Unit | MVG L3 | REMYA C C L1 | Akhil V L2 |
|---|---|---|---|---|---|---|
| 1.00Compound Wall | ||||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 3.2 | cum | 2,200 ₹7,040 | 1,831.66 ₹5,861.31 Lowest | 1,975 ₹6,320 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 2.88 | cum | 2,600 ₹7,488 | 2,186.12 ₹6,296.03 Lowest | 2,200 ₹6,336 |
| 1.00 | OD208996/2025-2026:60.7.8 DR With Departmental Stone -Dry Rubble Masonry -Dry Rubble Without Concrete Levelling Course Using Departmental Rubble | 2.16 | cum | 1,800 ₹3,888 | 1,475.65 ₹3,187.4 Lowest | 1,613.82 ₹3,485.85 |
| 1.00 | OD208208/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 8.78 | cum | 4,000 ₹35,136 | 3,434.37 ₹30,167.51 Lowest | 3,757.41 ₹33,005.09 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.92 | cum | 9,999 ₹19,198.08 | 8,568.97 ₹16,452.42 Lowest | 9,376.05 ₹18,002.02 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 6.4 | sqm | 400 ₹2,560 | 332.09 ₹2,125.38 Lowest | 363.38 ₹2,325.63 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 158.4 | kilogram | 120 ₹19,008 | 96.68 ₹15,314.11 Lowest | 105.8 ₹16,758.72 |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 8.74 | cum | 7,800 ₹68,140.8 | 6,633.64 ₹57,951.48 Lowest | 7,258.45 ₹63,409.82 |
| 1.01 | 13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). | 96.33 | sqm | 400 ₹38,530 | 304.1 ₹29,292.43 Lowest | 332.75 ₹32,052.14 |
Tender Value
Refer Docs
EMD Value
₹6,352
Closing Date
8 Sept 2025, 10:00 amClosed
AE
OFFICE OF THE ASSISTANT ENGINEER LPGP
Pookattukunnu Subcenter Maintenance (MGNR - Rs 3,00,000/-)-Pro.No.117/25
2025_LSGD_792240_9
02//2025-26/AE/LID EW/LPGP/PHASE2
Open Tender
Civil Works - Roads
Item Rate
180 days
LAKKIDI PERUR GRAMA PANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,352
Yes
27 Jul 2026
29 Aug 2025
8 Sept 2025
29 Aug 2025
8 Sept 2025
29 Aug 2025
Amount
Compound Wall
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
OD208996/2025-2026:60.7.8 DR With Departmental Stone -Dry Rubble Masonry -Dry Rubble Without Concrete Levelling Course Using Departmental Rubble
OD208208/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Akhil V (BID ID -2325907)
MVG (BID ID -2326309)
Bidder Name
Akhil V
REMYA C C
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .